[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388260":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},388260,172,1,"单选题","在软件开发的V模型中，应该在（ ）阶段制定单元测试计划。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","需求分析",false,{"key":16,"text":17,"correct":14},"B","概要设计",{"key":19,"text":20,"correct":14},"C","详细设计",{"key":22,"text":23,"correct":24},"D","代码编写",true,"考察V模型，",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]