[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-171-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},171,"(高级)系统架构设计师","职业资格",0,7,50,497,[13,34,46,58,70,82,94,102,114,126,138,150,162,174,186,198,210,222,234,246,258,267,279,290,302,314,326,338,350,362,374,386,398,410,422,434,446,458,470,482,494,506,518,530,542,554,565,575,585,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},388004,1,"单选题","用于管理信息系统规划的方法有很多，其中（）通过自上而下地识别企业目标、企业过程和数据，然后对数据进行分析，自下而上地设计信息系统。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","企业信息分析与集成法",false,{"key":24,"text":25,"correct":22},"B","投资回收法",{"key":27,"text":28,"correct":29},"C","企业系统规划法",true,{"key":31,"text":32,"correct":22},"D","阶石法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},388005,"以下关于增量模型的叙述中，不正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"容易理解，管理成本低",{"key":24,"text":41,"correct":22},"核心的产品往往首先开发，因此经历最充分的“测试”",{"key":27,"text":43,"correct":22},"第一个可交付版本所需要的成本低，时间少",{"key":31,"text":45,"correct":22},"即使一开始用户需求不清晰，对开发进度和质量也没有影响",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},388006,"软件风险是指在软件开发过程中面临的一些不确定性和可能造成的损失。软件风险大致可以分为三类：项目风险、技术风险和商业风险。下列叙述中，（ ）属于商业风险。",[50,52,54,56],{"key":20,"text":51,"correct":22},"软件的开发时间可能会超出预期时间",{"key":24,"text":53,"correct":22},"采用的开发技术过于先进，技术本身尚不稳定",{"key":27,"text":55,"correct":22},"软件开发过程中需求一直未能稳定下来",{"key":31,"text":57,"correct":29},"软件开发过程没有得到预算或人员上的保证",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},388007,"软件生命周期不包括（）",[62,64,66,68],{"key":20,"text":63,"correct":22},"软件定义时期",{"key":24,"text":65,"correct":22},"软件开发时期",{"key":27,"text":67,"correct":22},"运行和维护",{"key":31,"text":69,"correct":29},"软件部署时期",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},388008,"软件过程是制作软件产品的一组活动以及结果，这些活动主要由软件人员来完成，主要包括（）",[74,76,78,80],{"key":20,"text":75,"correct":22},"软件描述、软件开发和软件测试",{"key":24,"text":77,"correct":22},"软件开发、软件有效性验证和软件测试",{"key":27,"text":79,"correct":22},"软件描述、软件设计、软件实现和软件测试",{"key":31,"text":81,"correct":29},"软件描述、软件开发、软件有效性验证和软件进化",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},388009,"在面向对象设计中，（7）可以实现界面控制、外部接口和环境隔离。（8）作为完成用例业务的责任承担者，协调、控制其他类共同完成用例规定的功能或行为。【回答括号8】",[86,88,90,92],{"key":20,"text":87,"correct":22},"实体类",{"key":24,"text":89,"correct":29},"控制类",{"key":27,"text":91,"correct":22},"边界类",{"key":31,"text":93,"correct":22},"交互类",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},388010,"在面向对象设计中，（7）可以实现界面控制、外部接口和环境隔离。（8）作为完成用例业务的责任承担者，协调、控制其他类共同完成用例规定的功能或行为。【回答括号7】",[98,99,100,101],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":29},{"key":31,"text":93,"correct":22},{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":27,"analysis":33},388011,"UML用关系把事物结合在一起，（ ）描述一个事物发生变化会影响另一个事物的语义；（请作答此空）描述特殊元素的对象可替换一般元素的对象。",[106,108,110,112],{"key":20,"text":107,"correct":22},"实现关系",{"key":24,"text":109,"correct":22},"聚合关系",{"key":27,"text":111,"correct":29},"泛化关系",{"key":31,"text":113,"correct":22},"关联关系",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":24,"analysis":33},388012,"ISO开放互连安全体系的5类安全服务包括鉴别、访问控制、（ ）、数据完整性和抗抵赖性。",[118,120,122,124],{"key":20,"text":119,"correct":22},"数据可靠性",{"key":24,"text":121,"correct":29},"数据机密性",{"key":27,"text":123,"correct":22},"数据易恢复性",{"key":31,"text":125,"correct":22},"数据容错性",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":20,"analysis":33},388013,"XML 语法表述正确的是（）",[130,132,134,136],{"key":20,"text":131,"correct":29},"所有 XML 元素都须有关闭标签",{"key":24,"text":133,"correct":22},"XML 标签对大小写不敏感",{"key":27,"text":135,"correct":22},"XML 文档不需要根元素",{"key":31,"text":137,"correct":22},"在 XML 中，空格不会被保留",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},388014,"体系结构文档化有助于辅助系统分析人员和程序员去实现体系结构。体系结构文档化过程的主要输出包括（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":29},"体系结构规格说明、测试体系结构需求的质量设计说明书",{"key":24,"text":145,"correct":22},"质量属性说明书、体系结构描述",{"key":27,"text":147,"correct":22},"体系结构规格说明、软件功能需求说明",{"key":31,"text":149,"correct":22},"多视图体系结构模型、体系结构验证说明",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":27,"analysis":33},388015,"概要设计文档的内容不包括（ ）",[154,156,158,160],{"key":20,"text":155,"correct":22},"体系结构设计",{"key":24,"text":157,"correct":22},"数据库设计",{"key":27,"text":159,"correct":29},"模块内算法设计",{"key":31,"text":161,"correct":22},"逻辑数据结构设计",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":27,"analysis":33},388016,"面向消息中间件MOM的主要特点不包括（ ）",[166,168,170,172],{"key":20,"text":167,"correct":22},"通信程序可在不同的时间运行",{"key":24,"text":169,"correct":22},"程序与网络复杂性相隔离",{"key":27,"text":171,"correct":29},"程序与网络不隔离",{"key":31,"text":173,"correct":22},"对应用程序的结构没有约束",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},388017,"在结构化分析方法中，用(9)表示功能模型，用（10）表示行为模型。【回答括号10】",[178,180,182,184],{"key":20,"text":179,"correct":22},"通信图",{"key":24,"text":181,"correct":22},"顺序图",{"key":27,"text":183,"correct":22},"活动图",{"key":31,"text":185,"correct":29},"状态转换图",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":27,"analysis":33},388018,"某系统中的文本显示类(Text View)和图片显示类(Picture View)都继承了组件类(Component)，分别显示文本和图片内容，现需要构造带有滚动条或者带有黑色边框，或者既有滚动条又有黑色边框的文本显示控件和图片显示控件，但希望最多只增加3个类。那么采用设计模式（1）可实现该需求，其优点是（2）。【回答括号1】",[190,192,194,196],{"key":20,"text":191,"correct":22},"外观",{"key":24,"text":193,"correct":22},"单体",{"key":27,"text":195,"correct":29},"装饰",{"key":31,"text":197,"correct":22},"模板方法",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},388019,"ERP中的企业资源包括______。",[202,204,206,208],{"key":20,"text":203,"correct":29},"物流、资金流和信息流",{"key":24,"text":205,"correct":22},"物流、工作流和信息流",{"key":27,"text":207,"correct":22},"物流、资金流和工作流",{"key":31,"text":209,"correct":22},"资金流、工作流和信息流",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":31,"analysis":33},388020,"关于集中式负载均衡的特点不正确的是",[214,216,218,220],{"key":20,"text":215,"correct":22},"系统的可扩展性不强，均衡器需要记录所有计算机的负载信息。",{"key":24,"text":217,"correct":22},"安全性较差，如果均衡器所在的计算机瘫痪，则会导致整个集群系统的瘫痪。",{"key":27,"text":219,"correct":22},"与分布式负载均衡方式相比，实现简单。",{"key":31,"text":221,"correct":29},"实现灵活，负载均衡器可以根据不同脚手架的特性配置不同的均衡策略。",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},388021,"在对一个软件系统的架构进行设计与确认之后，需要进行架构复审。架构复审的目的是为了标识潜在的风险，及早发现架构设计中的缺陷和错误。在架构复审过程中，主要由( )决定架构是否满足需求、质量需求是否在设计中得到体现。",[226,228,230,232],{"key":20,"text":227,"correct":22},"系统分析师与架构师",{"key":24,"text":229,"correct":29},"用户代表与领域专家",{"key":27,"text":231,"correct":22},"系统拥有者与项目经理",{"key":31,"text":233,"correct":22},"系统开发与测试人员",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":27,"analysis":33},388022,"软件确认测试也称为有效性测试，主要验证（）",[238,240,242,244],{"key":20,"text":239,"correct":22},"系统中各个单元模块之间的协作性",{"key":24,"text":241,"correct":22},"软件与硬件在实际运行环境中能否有效集成",{"key":27,"text":243,"correct":29},"软件功能、性能及其它特性是否与用户需求一致",{"key":31,"text":245,"correct":22},"程序模块能否正确实现详细设计说明中的功能、性能和设计约束等要求",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},388023,"照设计模式的目的进行划分，现有的设计模式可以分为三类。(15)模式主要用于对象之间的职责及其提供服务的分配方式；",[250,252,254,256],{"key":20,"text":251,"correct":29},"行为型",{"key":24,"text":253,"correct":22},"交互型",{"key":27,"text":255,"correct":22},"耦合型",{"key":31,"text":257,"correct":22},"关联型",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},388024,"按照设计模式的目的进行划分，现有的设计模式可以分为三类。其中创建型模式通过采用抽象类所定义的接口，封装了系统中对象如何创建、组合等信息，其代表有(9)模式等;(10)模式主要用于如何组合己有的类和对象以获得更大的结构，其代表有 Adapter 模式等;(11)模式主要用于对象之间的职责及其提供服务的分配方式，其代表有(12)模式等。【回答括号11】",[262,263,264,266],{"key":20,"text":251,"correct":29},{"key":24,"text":253,"correct":22},{"key":27,"text":265,"correct":22},"耦合性",{"key":31,"text":257,"correct":22},{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":24,"analysis":33},388026,"螺旋模型将整个软件开发过程分为多个阶段，每个阶段都由目标设定、（）、开发和有效性验证以及评审4个部分组成。",[271,273,275,277],{"key":20,"text":272,"correct":22},"需求分析",{"key":24,"text":274,"correct":29},"风险分析",{"key":27,"text":276,"correct":22},"系统设计",{"key":31,"text":278,"correct":22},"架构设计",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":24,"analysis":33},388028,"基于0DP的架构开发过程按照顺序分别为系统构想、( )、 原型分析、( )、架构原型、项目规划、并行开发、系统转换、()、()。",[283,284,286,288],{"key":20,"text":272,"correct":22},{"key":24,"text":285,"correct":29},"架构规划",{"key":27,"text":287,"correct":22},"操作维护",{"key":31,"text":289,"correct":22},"系统移植",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":31,"analysis":33},388029,"面向对象的分析模型主要由顶层架构图、用例与用例图和（13）构成：设计模型则包含以（14）表示的软件体系机构图、以交互图表示的用例实现图、完整精确的类图、描述复杂对象的（15）和用以描述流程化处理过程的活动图等。【回答括号15】",[294,296,298,300],{"key":20,"text":295,"correct":22},"序列图",{"key":24,"text":297,"correct":22},"协作图",{"key":27,"text":299,"correct":22},"流程图",{"key":31,"text":301,"correct":29},"状态图",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":31,"analysis":33},388030,"需求分析的验证性含义表述不正确的是（ ）",[306,308,310,312],{"key":20,"text":307,"correct":22},"验证性要保持和用户要求的同步",{"key":24,"text":309,"correct":22},"验证性要保持需求分析各侧面的一致性.",{"key":27,"text":311,"correct":22},"保持需求和设计的同步",{"key":31,"text":313,"correct":29},"要实现所有用户的任何需求",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},388031,"下列关于敏捷方法的叙述中，错误的是（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":22},"与传统方法相比，敏捷方法比较适合需求变化大或者开发前期对需求不是很清晰的项目",{"key":24,"text":321,"correct":29},"敏捷方法尤其适合于开发团队比较庞大的项目",{"key":27,"text":323,"correct":22},"敏捷方法的思想是适应性，而不是预设性",{"key":31,"text":325,"correct":22},"敏捷方法以原型开发思想为基础，采用迭代式增量开发",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":20,"analysis":33},388032,"DTD定义了几个方面的内容，以下说法不正确的是（ ）",[330,332,334,336],{"key":20,"text":331,"correct":29},"元素声明，但是不包括元素的排列方式",{"key":24,"text":333,"correct":22},"元素的内容",{"key":27,"text":335,"correct":22},"实体的声明",{"key":31,"text":337,"correct":22},"属性的种类",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":27,"analysis":33},388033,"UNIX 的源代码控制工具（source Code control System，SCCS）是软件项目开发中常用的（）",[342,344,346,348],{"key":20,"text":343,"correct":22},"源代码静态分析工具",{"key":24,"text":345,"correct":22},"工具",{"key":27,"text":347,"correct":29},"控制工具",{"key":31,"text":349,"correct":22},"再工程工具",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":27,"analysis":33},388034,"关于XML的语法要求不正确的是（ ）",[354,356,358,360],{"key":20,"text":355,"correct":22},"在 XML 中编写注释的语法与 HTML 的语法很相似",{"key":24,"text":357,"correct":22},"XML 文档必须有一个元素是所有其他元素的父元素。该元素称为根元素",{"key":27,"text":359,"correct":29},"XML 的属性值与HTML语言不一样，不须加引号",{"key":31,"text":361,"correct":22},"声明不属于XML本身的组成部分。它不是 XML 元素，也不需要关闭标签",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},388035,"组织信息化需求通常包含三个层次，其中（）需求的目标是提升组织的竞争能力，为组织的可持续发展提供支持环境。",[366,368,370,372],{"key":20,"text":367,"correct":29},"战略",{"key":24,"text":369,"correct":22},"发展",{"key":27,"text":371,"correct":22},"人事",{"key":31,"text":373,"correct":22},"财务",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":24,"analysis":33},388036,"RISC(精简指令系统计算机）的特点不包括：（）",[378,380,382,384],{"key":20,"text":379,"correct":22},"指令长度固定，指令种类尽量少",{"key":24,"text":381,"correct":29},"寻址方式尽量丰富，指令功能尽可能强",{"key":27,"text":383,"correct":22},"增加寄存器数目，以减少访存次数",{"key":31,"text":385,"correct":22},"用硬布线电路实现指令解码，以尽快完成指令译码",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":31,"analysis":33},388037,"以下关于软件中间件的叙述，错误的是（）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"中间件通过标准接口实现与应用程序的关联，提供特定功能的服务",{"key":24,"text":393,"correct":22},"使用中间件可以提高应用软件可移植性",{"key":27,"text":395,"correct":22},"使用中间件有助于提高开发效率",{"key":31,"text":397,"correct":29},"中间件位于客户机服务器的操作系统之下，应用程序之上。管理计算资源和网络通信。",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":20,"analysis":33},388038,"图中的（ 1）是什么（）。",[402,404,406,408],{"key":20,"text":403,"correct":29},"主块",{"key":24,"text":405,"correct":22},"测试块",{"key":27,"text":407,"correct":22},"表决块",{"key":31,"text":409,"correct":22},"容错块",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":27,"analysis":33},388039,"以下关于结构化开发方法的叙述中，不正确的是（ ）",[414,416,418,420],{"key":20,"text":415,"correct":22},"总的指导思想是自顶向下，逐层分解",{"key":24,"text":417,"correct":22},"基本原则是功能的分解与抽象",{"key":27,"text":419,"correct":29},"与面向对象开发方法相比，更适合大规模、特别复杂的项目",{"key":31,"text":421,"correct":22},"特别适合于数据处理领域的项目",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},388040,"螺旋模型是在（ ）的基础上扩展而成。",[426,428,430,432],{"key":20,"text":427,"correct":22},"瀑布模型",{"key":24,"text":429,"correct":29},"原型模型",{"key":27,"text":431,"correct":22},"快速模型",{"key":31,"text":433,"correct":22},"面向对象模型",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":27,"analysis":33},388042,"企业应用集成是一个战略意义上的方法，它从服务和信息角度将多个信息系统绑定在一起，提供实时交换信息和影响流程的能力。（ ）提供企业之间的信息共享能力，（请作答此空）在用户使用角度能够对集成系统产生一个“整体”的感觉。",[438,440,442,444],{"key":20,"text":439,"correct":22},"API集成",{"key":24,"text":441,"correct":22},"数据集成",{"key":27,"text":443,"correct":29},"界面集成",{"key":31,"text":445,"correct":22},"过程集成",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":31,"analysis":33},388043,"在项目某阶段的实施过程中，A活动需要2天2人完成，B活动需要2天2人完成，C活动需要5天4人完成，D活动需要3天2人完成，E活动需要1天1人完成，该阶段的时标网络图如下。该项目组共有8人，且负责 A、E活动的人因另有安排，无法帮助其他人完成相应工作，且项目整个工期刻不容缓。以下 （ ） 安排是恰当的，能够使实施任务顺利完成",[450,452,454,456],{"key":20,"text":451,"correct":22},"B活动提前2天开始",{"key":24,"text":453,"correct":22},"B活动推迟2天开始",{"key":27,"text":455,"correct":22},"D活动提前2天开始",{"key":31,"text":457,"correct":29},"D活动推迟2天开始",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":31,"analysis":33},388044,"以下说法错误的是（）",[462,464,466,468],{"key":20,"text":463,"correct":22},"COM接口可通过（单）接口继承从其他COM接口中派生。",{"key":24,"text":465,"correct":22},"COM支持系统注册器，它类似CORBA存储器。",{"key":27,"text":467,"correct":22},"COM的接口继承与其支持的多态无关。",{"key":31,"text":469,"correct":29},"即使公布了，COM接口和它的规范也可以以某种特定的形式改变。",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":31,"analysis":33},388045,"按照设计模式的目的进行划分，现有的设计模式可以分为三类。行为型模式主要用于对象之间的职责及其提供服务的分配方式，其代表有()模式等。",[474,476,478,480],{"key":20,"text":475,"correct":22},"Prototype",{"key":24,"text":477,"correct":22},"Facade",{"key":27,"text":479,"correct":22},"Proxy",{"key":31,"text":481,"correct":29},"Visitor",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":20,"analysis":33},388046,"对于开发模型来说，（ ）复用好、开发过程无间隙、节省时间。（ ）是瀑布与原型（演化）模型结合体，适用于复杂项目。（请作答此空）需要用户参与，模块化要求高，不适用新技术。（）是用例驱动、架构为中心、迭代、增量。",[486,488,490,492],{"key":20,"text":487,"correct":29},"RAD模型",{"key":24,"text":489,"correct":22},"螺旋模型",{"key":27,"text":491,"correct":22},"RUP模型",{"key":31,"text":493,"correct":22},"喷泉模型",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},388047,"某软件公司欲开发一个绘图软件，要求使用不同的绘图程序绘制不同的图形。在明确用户需求后，该公司的架构师决定采用Bridge模式实现该软件，并设计UML类图如下图所示。图中与Bridge模式中的“Abstraction”角色相对应的类是（6），与“Implementor”角色相对应的类是（7）。【回答括号7】",[498,500,502,504],{"key":20,"text":499,"correct":22},"Shape",{"key":24,"text":501,"correct":29},"Drawing",{"key":27,"text":503,"correct":22},"Rectangle",{"key":31,"text":505,"correct":22},"V2Drawing",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":31,"analysis":33},388048,"EJB中Bean的类型不包括（ ）",[510,512,514,516],{"key":20,"text":511,"correct":22},"实体Bean",{"key":24,"text":513,"correct":22},"会话Bean",{"key":27,"text":515,"correct":22},"消息驱动Bean",{"key":31,"text":517,"correct":29},"会话驱动Bean",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":31,"analysis":33},388049,"关于数据访问中间件的作用，下列说法错误的是 （ ） 。",[522,524,526,528],{"key":20,"text":523,"correct":22},"为了建立数据应用资源互操作的模式，对异构环境下的数据库和文件系统实现联接",{"key":24,"text":525,"correct":22},"用来屏蔽掉各种平台及协议之间的差异，进行相互通信，实现应用程序之间的协同",{"key":27,"text":527,"correct":22},"在分布、异构的网络计算环境中，可以将各种分布对象有机地结合在一起，完成系统的快速集成，实现对象重用",{"key":31,"text":529,"correct":29},"使调用远端的过程像调用本地过程一样",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":27,"analysis":33},388050,"客户关系管理（CRM）系统将市场营销的科学管理理念通过信息技术的手段集成在软件上，能够帮助企业构建良好的客户关系。以下关于CRM系统的叙述中，错误的______。",[534,536,538,540],{"key":20,"text":535,"correct":22},"销售自动化是CRM系统中最基本的模块",{"key":24,"text":537,"correct":22},"营销自动化作为销售自动化的补充，包括营销计划的编制和执行、计划结果分析等",{"key":27,"text":539,"correct":29},"CRM系统能够与ERP系统在财务、制造、库存等环节进行连接，但两者关系相对松散，一般不会形成闭环结构",{"key":31,"text":541,"correct":22},"客户服务与支持是CRM系统的重要功能。目前，客户服务与支持的主要手段是通过呼叫中心和互联网来实现",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":20,"analysis":33},388051,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，边上的数字表示相应活动的持续时间（天），则完成该项目的最少时间为（ ）天。活动BC和BF最多可以晚开始（ ）天而不会影响整个项目的进度。",[546,548,550,552],{"key":20,"text":547,"correct":29},"0和7",{"key":24,"text":549,"correct":22},"0和11",{"key":27,"text":551,"correct":22},"2和7",{"key":31,"text":553,"correct":22},"2和11",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":556,"answer":31,"analysis":33},388052,[557,559,561,563],{"key":20,"text":558,"correct":22},"11",{"key":24,"text":560,"correct":22},"15",{"key":27,"text":562,"correct":22},"16",{"key":31,"text":564,"correct":29},"18",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":27,"analysis":33},388053,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，链接顶点的边表示包含的活动，边上的数字表示活动的持续时间（天）。完成该项目的最少时间为（ ）天。由于某种原因，现在需要同一个开发人员完成BC和B D，则完成该项目的最少时间为（请作答此空）天。",[569,570,571,573],{"key":20,"text":558,"correct":22},{"key":24,"text":564,"correct":22},{"key":27,"text":572,"correct":29},"20",{"key":31,"text":574,"correct":22},"21",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},388054,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，边上的数字表示活动的持续时间(天)，则完成该项目的最少时间为（ ）天。活动BD和HK最早可以从第（ ）天开始。(活动A B、AE和AC最早从第1天开始)",[579,581,582,584],{"key":20,"text":580,"correct":22},"17",{"key":24,"text":564,"correct":22},{"key":27,"text":583,"correct":22},"19",{"key":31,"text":572,"correct":29},{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":31,"analysis":33},388055,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，边上的数字表示活动的持续天数，则完成该项目的最少时间为（ ）天。活动EH和IJ的松弛时间分别为（ ）天。",[589,590,591,592],{"key":20,"text":580,"correct":22},{"key":24,"text":583,"correct":22},{"key":27,"text":572,"correct":22},{"key":31,"text":593,"correct":29},"22",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":596,"answer":24,"analysis":33},388056,[597,599,601,603],{"key":20,"text":598,"correct":22},"3和10",{"key":24,"text":600,"correct":29},"4和11",{"key":27,"text":602,"correct":22},"3和9",{"key":31,"text":604,"correct":22},"4和10",[606,610,613,616,619,622],{"id":607,"name":608,"category":7,"favorite":609},136,"法律职业试卷二(客观题 )",2,{"id":611,"name":612,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":614,"name":615,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":617,"name":618,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":620,"name":621,"category":7,"favorite":8},28,"安全工程师",{"id":623,"name":624,"category":7,"favorite":8},112,"安全生产法律知识"]