[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388084":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},388084,171,1,"单选题","某工程项目包括8个作业A～H。各作业的紧前作业、所需天数、所需人数见下表： 该项目共有10人，各作业必须连续进行，至少需要（）天才能完成。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","11",false,{"key":16,"text":17,"correct":18},"B","12",true,{"key":20,"text":21,"correct":14},"C","13",{"key":23,"text":24,"correct":14},"D","14","该项目的进度计划网络图如下，各作业上标注了“作业名（天数，人数）” 如果不考虑人数的限制，关键路径为C-F-G-H，该项目共需2+2+3+4=11天。作业D必须在作业G前完成，但D不能与F并行（DF人数超过10），所以只能CD 并行2天，F推迟1天开始，导致该项目总天数延长1天。作业B可以在作业C完成后立即开始，并与F并行2天。作业E将与作业G并行。作业A可以与作业H并行。考虑到人数分配的平衡性，可以让AH同时开始。这样，整个项目最后1天只需1人，其他人可以转做别的项目。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)系统架构设计师","职业资格",0]