[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-387634":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},387634,170,1,"单选题","项目团队无法完成既定任务目标通常是由于以下几种原因:(1)对目标没有正确理解。(2)没有能力去做(3)没有条件去做(4)没有意愿去做以上( )原因应该由系统规划与管理师承担责任。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","(1)(2)(3)",false,{"key":16,"text":17,"correct":14},"B","(2)(3)(4)",{"key":19,"text":20,"correct":14},"C","(1)(2)(4)",{"key":22,"text":23,"correct":24},"D","(1)(2)(3)(4)",true,"项目团队无法完成既定任务目标通常是由于以下几种原因:(1)对目标没有正确理解。(2)没有能力去做(3)没有条件去做(4)没有意愿去做以上所有原因都由由系统规划与管理师承担责任。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)系统规划与管理师","职业资格",0]