[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-168-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},168,"(高级)网络规划设计师","职业资格",0,4,50,817,[13,34,46,58,70,80,92,104,116,128,140,152,164,176,188,199,211,223,235,247,259,271,283,295,307,319,331,343,355,367,379,391,403,415,427,439,451,463,473,485,497,509,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},386515,1,"单选题","采用网络测试工具（ ）可以进行光纤长度、光纤的传输衰减、接头衰减和故障定位等的测量。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","OTDR",true,{"key":24,"text":25,"correct":26},"B","TDR",false,{"key":28,"text":29,"correct":26},"C","BERT",{"key":31,"text":32,"correct":26},"D","Sniffer","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},386516,"CPU 的频率有主频、倍频和外频。某处理器外频是200MHz，倍频是13，该款处理器的主频是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"2.6GHz",{"key":24,"text":41,"correct":26},"1300MHz",{"key":28,"text":43,"correct":26},"15.38Mhz",{"key":31,"text":45,"correct":26},"200MHz",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},386517,"CISC是（7）的简称",[50,52,54,56],{"key":20,"text":51,"correct":22},"复杂指令集系统计算机",{"key":24,"text":53,"correct":26},"超大规模集成电路",{"key":28,"text":55,"correct":26},"精简指令集系统计算机",{"key":31,"text":57,"correct":26},"超长指令字",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},386518,"通常可以将计算机系统中执行一条指令的过程分为取指令，分析和执行指令3步。若取指令时间为4Δt，分析时间为2Δt。执行时间为3Δt，按顺序方式从头到尾执行完600条指令所需时间为（请作答此空）Δt；若按照执行第i条，分析第i+1条，读取第i+2条重叠的流水线方式执行指令，则从头到尾执行完600条指令所需时间为（ ）Δt。",[62,64,66,68],{"key":20,"text":63,"correct":26},"2400",{"key":24,"text":65,"correct":26},"3000",{"key":28,"text":67,"correct":26},"3600",{"key":31,"text":69,"correct":22},"5400",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},386519,"通常可以将计算机系统中执行一条指令的过程分为取指令，分析和执行指令3步。若取指令时间为4Δt，分析时间为2Δt。执行时间为3Δt，按顺序方式从头到尾执行完600条指令所需时间为（ ）Δt；若按照执行第i条，分析第i+1条，读取第i+2条重叠的流水线方式执行指令，则从头到尾执行完600条指令所需时间为（请作答此空）Δt。",[74,75,77,78],{"key":20,"text":63,"correct":26},{"key":24,"text":76,"correct":22},"2405",{"key":28,"text":65,"correct":26},{"key":31,"text":79,"correct":26},"3009",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":20,"analysis":33},386520,"（请作答此空）是指计算机CPU在单位时间内输出的脉冲数，它在很大程度上决定了计算机的运行速度。（ ）是指计算机的运算部件能同时处理的二进制数据的位数，它决定了计算机的运算精度。",[84,86,88,90],{"key":20,"text":85,"correct":22},"时钟频率",{"key":24,"text":87,"correct":26},"字长",{"key":28,"text":89,"correct":26},"可移植性",{"key":31,"text":91,"correct":26},"数据处理速率",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},386521,"RISC（精简指令系统计算机）是计算机系统的基础技术之一，其特点不包括（ ）。",[96,98,100,102],{"key":20,"text":97,"correct":26},"指令长度固定，指令种类尽量少",{"key":24,"text":99,"correct":22},"寻址方式尽量丰富，指令功能尽可能强",{"key":28,"text":101,"correct":26},"增加寄存器数目，以减少访存次数",{"key":31,"text":103,"correct":26},"用硬布线电路实现指令解码，以尽快完成指令译码",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":28,"analysis":33},386522,"网络环境越复杂发生故障的可能性就越大，引发故障的原因也就越难确定。由于OSI各层功能具有相对性，在网络故障检测时按层排查故障可以有效发现和隔离故障。沿着从源到目标的路径，查看路由器路由表，同时检查路由器接口的IP地址属于（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":26},"物理层故障检查",{"key":24,"text":111,"correct":26},"数据链路层故障检查",{"key":28,"text":113,"correct":22},"网络层故障检查",{"key":31,"text":115,"correct":26},"应用层故障检查",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":28,"analysis":33},386523,"（ ）的目的是检查模块之间，以及模块和已集成的软件之间的接口关系，并验证已集成的软件是否符合设计要求。其测试的技术依据是（请作答此空）。",[120,122,124,126],{"key":20,"text":121,"correct":26},"软件详细设计说明书",{"key":24,"text":123,"correct":26},"技术开发合同",{"key":28,"text":125,"correct":22},"软件概要设计文档",{"key":31,"text":127,"correct":26},"软件配置文档",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":28,"analysis":33},386524,"用户文档主要描述所交付系统的功能和使用方法。下列文档中，（21）属于用户文档。",[132,134,136,138],{"key":20,"text":133,"correct":26},"需求说明书",{"key":24,"text":135,"correct":26},"系统设计文档",{"key":28,"text":137,"correct":22},"安装文档",{"key":31,"text":139,"correct":26},"系统测试计划",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":31,"analysis":33},386525,"甲、乙、丙、丁四个人将一份文档翻译为英、日、德、俄四种文字，每人只能翻译一种语言。其翻译文字所需时间如下表所示。 应派甲翻译（请作答此空），最少的翻译时间为（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":26},"英",{"key":24,"text":147,"correct":26},"日",{"key":28,"text":149,"correct":26},"德",{"key":31,"text":151,"correct":22},"俄",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},386526,"RUP 生命周期分为（请作答此空）阶段，RUP生命阶段中（ ）是确定项目边界，关注业务与需求风险。",[156,158,160,162],{"key":20,"text":157,"correct":26},"3",{"key":24,"text":159,"correct":22},"4",{"key":28,"text":161,"correct":26},"5",{"key":31,"text":163,"correct":26},"6",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":31,"analysis":33},386527,"项目管理工具用来辅助项目经理实施软件开发过程中的项目管理活动，它不能（26）。",[168,170,172,174],{"key":20,"text":169,"correct":26},"覆盖整个软件生存周期",{"key":24,"text":171,"correct":26},"确定关键路径、松弛时间、超前时间和滞后时间",{"key":28,"text":173,"correct":26},"生成固定格式的报表和裁剪项目报告",{"key":31,"text":175,"correct":22},"指导软件设计人员按软件生存周期各个阶段的适用技术进行设计工作",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":28,"analysis":33},386528,"在项目的每一个阶段结束时，审查项目完成情况与可交付成果是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":26},"根据项目基线确定完成项目所需的资源数量",{"key":24,"text":183,"correct":26},"根据已完成的工作量调整时间安排与成本基线",{"key":28,"text":185,"correct":22},"决定项目是否应进入下一阶段",{"key":31,"text":187,"correct":26},"接受客户对所交付项目的验收",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":190,"answer":28,"analysis":33},386532,[191,193,195,197],{"key":20,"text":192,"correct":26},"指令格式种类少，寻址方式种类少",{"key":24,"text":194,"correct":26},"CPU中有多个通用寄存器",{"key":28,"text":196,"correct":22},"控制器采用微程序控制",{"key":31,"text":198,"correct":26},"选取使用频度较高的一些简单指令以及一些很有用但又不复杂的指令",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},386533,"RUP 生命周期分为（ ）阶段，RUP生命阶段中（请作答此空）是确定项目边界，关注业务与需求风险。",[203,205,207,209],{"key":20,"text":204,"correct":22},"初始阶段",{"key":24,"text":206,"correct":26},"细化阶段",{"key":28,"text":208,"correct":26},"构建阶段",{"key":31,"text":210,"correct":26},"交付阶段",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":31,"analysis":33},386534,"以下不属于风险识别工作的是（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":26},"确定风险来源",{"key":24,"text":218,"correct":26},"确定风险条件",{"key":28,"text":220,"correct":26},"描述风险特征",{"key":31,"text":222,"correct":22},"制定风险对策",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},386535,"在项目进度管理中，常用（）来安排工作顺序。",[227,229,231,233],{"key":20,"text":228,"correct":26},"进度曲线法",{"key":24,"text":230,"correct":22},"网络图法",{"key":28,"text":232,"correct":26},"直方图法",{"key":31,"text":234,"correct":26},"相关图法",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},386536,"（ ）在软件开发机构中被广泛用来指导软件过程改进。",[239,241,243,245],{"key":20,"text":240,"correct":22},"能力成熟度模型（Capacity Maturity Model）",{"key":24,"text":242,"correct":26},"关键过程领域（Key Process Areas）",{"key":28,"text":244,"correct":26},"需求跟踪能力链（Traceability Link）",{"key":31,"text":246,"correct":26},"工作分解结构（Work Breakdown、Structure）",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},386537,"甲公司接受乙公司委托开发了一项应用软件，双方没有订立任何书面合同。在此情形下，（ ）享有该软件的著作权。",[251,253,255,257],{"key":20,"text":252,"correct":22},"甲公司",{"key":24,"text":254,"correct":26},"甲、乙公司共同",{"key":28,"text":256,"correct":26},"乙公司",{"key":31,"text":258,"correct":26},"甲、乙公司均不",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},386538,"接上题。如果集成系统的业务逻辑较为复杂，并需要通过数据库中不同表的连接操作获取数据才能实现业务功能，这时采用（）方式进行数据交换与处理较为合适。",[263,265,267,269],{"key":20,"text":264,"correct":26},"数据网关",{"key":24,"text":266,"correct":26},"主动记录",{"key":28,"text":268,"correct":26},"包装器",{"key":31,"text":270,"correct":22},"数据映射",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},386539,"项目时间管理包括使项目按时完成所必需的管理过程，活动定义是其中的一个重要过程。通常可以使用（）来进行活动定义。",[275,277,279,281],{"key":20,"text":276,"correct":26},"鱼骨图",{"key":24,"text":278,"correct":22},"工作分解结构（WBS）",{"key":28,"text":280,"correct":26},"层次分解结构",{"key":31,"text":282,"correct":26},"功能分解图",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":20,"analysis":33},386540,"以下关于网络互联设备的选择的说法，不正确的是（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"不同层次的互联设备实现互联的原理不同，一般来说选择设备不会影响网络的可维护性",{"key":24,"text":290,"correct":26},"网络互联设备包括网桥、交换机、路由器、网关等",{"key":28,"text":292,"correct":26},"第二层实现异构网络互联，选择网桥",{"key":31,"text":294,"correct":26},"在网络设计中，网络互联设备的选择十分重要。在不同的互联层次，应选择不同的互联设备。",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":24,"analysis":33},386541,"以下关于数的定点表示和浮点表示的叙述中，不正确的是（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":26},"定点表示法表示的数(称为定点数)常分为定点整数和定点小数两种",{"key":24,"text":302,"correct":22},"定点表示法中，小数点需要占用一个存储位",{"key":28,"text":304,"correct":26},"浮点表示法用阶码和尾数来表示数，称为浮点数",{"key":31,"text":306,"correct":26},"在总位数相同的情况下，浮点表示法可以表示更大的数",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":31,"analysis":33},386542,"（25）方法以原型开发思想为基础，采用迭代增量式开发，发型版本小型化，比较适合需求变化较大或者开发前期对需求不是很清晰的项目。",[311,313,315,317],{"key":20,"text":312,"correct":26},"信息工程",{"key":24,"text":314,"correct":26},"结构化",{"key":28,"text":316,"correct":26},"面向对象",{"key":31,"text":318,"correct":22},"敏捷",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":20,"analysis":33},386544,"配置项是构成产品配置的主要元素。其中（22）不属于配置项。",[323,325,327,329],{"key":20,"text":324,"correct":22},"设备清单",{"key":24,"text":326,"correct":26},"项目质量报告",{"key":28,"text":328,"correct":26},"源代码",{"key":31,"text":330,"correct":26},"测试用例",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":28,"analysis":33},386545,"用例之间是具有相关性的。在商场管理系统中，有个会员卡注册模块。用例“金卡会员注册”和“银卡卡会员注册”、“会员卡注册”之间是（ ）关系。",[335,337,339,341],{"key":20,"text":336,"correct":26},"包含（include）",{"key":24,"text":338,"correct":26},"扩展（extend）",{"key":28,"text":340,"correct":22},"泛化（generalization）",{"key":31,"text":342,"correct":26},"依赖（depends on）",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":28,"analysis":33},386546,"某大型商业公司欲集成其内部的多个业务系统，这些业务系统的运行平台和开发语言差异较大，而且系统所使用的通信协议和数据格式各不相同，针对这种情况，采用基于（）的集成框架较为合适。",[347,349,351,353],{"key":20,"text":348,"correct":26},"数据库",{"key":24,"text":350,"correct":26},"文件系统",{"key":28,"text":352,"correct":22},"总线",{"key":31,"text":354,"correct":26},"点对点",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},386547,"软件测试一般分为两个大类：动态测试和静态测试。前者通过运行程序发现错误,包括（请作答此空）等方法；后者采用人工和计算机辅助静态分析的手段对程序进行检测，包括（ ）等方法。",[359,361,363,365],{"key":20,"text":360,"correct":22},"边界值分析、逻辑覆盖、基本路径",{"key":24,"text":362,"correct":26},"桌面检查、逻辑覆盖、错误推测",{"key":28,"text":364,"correct":26},"桌面检查、代码审查、代码走查",{"key":31,"text":366,"correct":26},"错误推测、代码审查、基本路径",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":20,"analysis":33},386548,"M公司购买了N画家创作的一幅美术作品原件。M公司未经N画家的许可，擅自将这幅美术作品作为商标注册，并大量复制用于该公司的产品上。M公司的行为侵犯了N画家的( )。",[371,373,375,377],{"key":20,"text":372,"correct":22},"著作权",{"key":24,"text":374,"correct":26},"发表权",{"key":28,"text":376,"correct":26},"商标权",{"key":31,"text":378,"correct":26},"展览权",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":20,"analysis":33},386549,"逆向工程导出的信息可以分为4个抽象层次，其中（）可以抽象出程序的抽象语法树、符号表等信息；",[383,385,387,389],{"key":20,"text":384,"correct":22},"实现级",{"key":24,"text":386,"correct":26},"结构级",{"key":28,"text":388,"correct":26},"功能级",{"key":31,"text":390,"correct":26},"领域级",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},386550,"信息系统开发方法有很多种，开发人员可以根据项目的需要选择一种适合的开发方法，其中把整个系统的开发过程分为若干阶段，然后一步一步地依次进行开发的方法称为 （ ） 。",[395,397,399,401],{"key":20,"text":396,"correct":22},"结构化方法",{"key":24,"text":398,"correct":26},"面向对象方法",{"key":28,"text":400,"correct":26},"原型方法",{"key":31,"text":402,"correct":26},"瀑布模型方法",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},386551,"在客户机-服务器通信模式中，信息流量是双向非对称的方式流动，不同的应用中，这两个流向的通信流量是不同的，（ ）属于客户机至服务器双向流量都可能大的情况。",[407,409,411,413],{"key":20,"text":408,"correct":26},"视频点播",{"key":24,"text":410,"correct":26},"基于SNMP协议的网管服务",{"key":28,"text":412,"correct":26},"WWW服务",{"key":31,"text":414,"correct":22},"邮件服务",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},386552,"某企业构建了网站群管理系统，为了加强网站安全，可以配置（ ）来有效防止对网站的SQL注入，XML注入、XSS等攻击。",[419,421,423,425],{"key":20,"text":420,"correct":22},"WAF",{"key":24,"text":422,"correct":26},"IDS",{"key":28,"text":424,"correct":26},"备份一体机",{"key":31,"text":426,"correct":26},"上网行为管理设备",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},386553,"软件重用是指在两次或多次不同的软件开发过程中重复使用相同或相似软件元素的过程。软件元素包括（ ）、测试用例和领域知识等。",[431,433,435,437],{"key":20,"text":432,"correct":26},"项目范围定义、需求分析文档、设计文档",{"key":24,"text":434,"correct":22},"需求分析文档、设计文档、程序代码",{"key":28,"text":436,"correct":26},"设计文档、程序代码、界面原型",{"key":31,"text":438,"correct":26},"程序代码、界面原型、数据表结构",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":28,"analysis":33},386555,"ERP的基本思想是（ ）",[443,445,447,449],{"key":20,"text":444,"correct":26},"计划和管理",{"key":24,"text":446,"correct":26},"控制和组织",{"key":28,"text":448,"correct":22},"计划和控制",{"key":31,"text":450,"correct":26},"组织和管理",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},386556,"（ ）不属于信息系统项目的生命周期模型。",[455,457,459,461],{"key":20,"text":456,"correct":26},"瀑布模型",{"key":24,"text":458,"correct":26},"迭代模型",{"key":28,"text":460,"correct":26},"螺旋模型",{"key":31,"text":462,"correct":22},"类-对象模型",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":28,"analysis":33},386557,"（）把整个软件开发流程分成多个阶段，每一个阶段都由目标设定、风险分析、开发和有效性验证以及评审构成",[467,469,470,471],{"key":20,"text":468,"correct":26},"原型模型",{"key":24,"text":456,"correct":26},{"key":28,"text":460,"correct":22},{"key":31,"text":472,"correct":26},"V模型",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},386558,"（）就是一种典型的项目管理工具。",[477,479,481,483],{"key":20,"text":478,"correct":26},"需求分析工具",{"key":24,"text":480,"correct":22},"成本估算工具",{"key":28,"text":482,"correct":26},"软件评价工具",{"key":31,"text":484,"correct":26},"文档分析工具",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":28,"analysis":33},386559,"企业应用集成通过采用多种集成模式构建统一标准的基础平台，将具有不同功能和目的且独立运行的企业信息系统联合起来。其中，面向（19）的集成模式强调处理不同应用系统之间的交互逻辑，与核心业务逻辑相分离，并通过不同应用系统之间的协作共同完成某项业务功能。",[489,491,493,495],{"key":20,"text":490,"correct":26},"数据",{"key":24,"text":492,"correct":26},"接口",{"key":28,"text":494,"correct":22},"过程",{"key":31,"text":496,"correct":26},"界面",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},386560,"编写汇编语言程序时，下列寄存器中，程序员可访问的是（15）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"A. 程序计数器（P",{"key":24,"text":504,"correct":26},"指令寄存器（IR）",{"key":28,"text":506,"correct":26},"存储器数据寄存器（MDR）",{"key":31,"text":508,"correct":26},"存储器地址寄存器（MAR）",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":31,"analysis":33},386561,"在RUP中采用“4+1”视图模型来描述软件系统的体系结构。在该模型中，系统工程师侧重于（）。",[513,515,517,519],{"key":20,"text":514,"correct":26},"实现视图",{"key":24,"text":516,"correct":26},"进程视图",{"key":28,"text":518,"correct":26},"逻辑视图",{"key":31,"text":520,"correct":22},"部署视图",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":31,"analysis":33},386563,"CRM是一套先进的管理思想及技术手段，它通过将（）进行有效的整合，最终为企业涉及到的各个领域提供了集成环境。",[525,527,529,531],{"key":20,"text":526,"correct":26},"员工资源、客户资源与管理技术",{"key":24,"text":528,"correct":26},"销售资源、信息资源与商业智能",{"key":28,"text":530,"correct":26},"销售管理、市场管理与服务管理",{"key":31,"text":532,"correct":22},"人力资源、业务流程与专业技术",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},386564,"数据的网络传递模式就是通信模式，通信模式直接决定了网络流量在不同网段分布，同时结合流量的通信量，就可以获取不同网段的总通信量大小。（ ）是指多个计算节点协同工作来完成一项共同任务的应用，在解决分布式应用，提高性能价格比，提供共享资源的实用性、容错性以及可伸缩性方面有着巨大的潜力。",[537,539,541,543],{"key":20,"text":538,"correct":26},"客户机-服务器通信",{"key":24,"text":540,"correct":26},"对等通信",{"key":28,"text":542,"correct":26},"浏览器-服务器通信",{"key":31,"text":544,"correct":22},"分布式计算",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},386565,"某大型商业公司欲集成内部的多个业务系统，这些业务系统的运行平台和开发语言差异较大，而且系统所使用的通信协议和数据格式各不相同，针对这种情况，采用基于（上一空）的集成框架较为合适。除此以外，集成系统还需要根据公司的新业务需要，灵活、动态地定制系统之间的功能协作关系，针对这一需求，应该选择基于（）技术的实现方式更为合适。",[549,551,553,555],{"key":20,"text":550,"correct":26},"分布式对象",{"key":24,"text":552,"correct":26},"远程过程调用",{"key":28,"text":554,"correct":26},"进程间通信",{"key":31,"text":556,"correct":22},"工作流",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},386566,"ERP中的企业资源包括（）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"物流、资金流和信息流",{"key":24,"text":564,"correct":26},"物流、工作流和信息流",{"key":28,"text":566,"correct":26},"物流、资金流和工作流",{"key":31,"text":568,"correct":26},"资金流、工作流和信息流",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},386567,"甲、乙、丙、丁四个人将一份文档翻译为英、日、德、俄四种文字，每人只能翻译一种语言。其翻译文字所需时间如下表所示。 问应派甲翻译（ ），最少的翻译时间为（请作答此空）。",[573,575,577,579],{"key":20,"text":574,"correct":26},"26",{"key":24,"text":576,"correct":22},"28",{"key":28,"text":578,"correct":26},"30",{"key":31,"text":580,"correct":26},"32",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":28,"analysis":33},386568,"原型法在软件开发过程中是一种十分有效的策略，在（ ）中均有采用。",[585,587,589,591],{"key":20,"text":586,"correct":26},"瀑布模型和快速原型模型",{"key":24,"text":588,"correct":26},"演化模型和增量模型",{"key":28,"text":590,"correct":22},"演化模型和快速原型模型",{"key":31,"text":592,"correct":26},"喷泉模型和慢速原型模型",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":20,"analysis":33},386569,"原型法在软件开发过程中是一种十分有效的策略，原型通常有两种，如果最后的系统是基于原型生成的，那么称为（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"渐进式原型",{"key":24,"text":600,"correct":26},"抛弃型原型",{"key":28,"text":602,"correct":26},"基础式原型",{"key":31,"text":604,"correct":26},"简要式原型",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":24,"analysis":33},386570,"某企业欲对内部的数据库进行数据集成。如果集成系统的业务逻辑较为简单，仅使用数据库中的单表数据即可实现业务功能，这时采用（）方式进行数据交换与处理较为合适；",[609,610,611,612],{"key":20,"text":264,"correct":26},{"key":24,"text":266,"correct":22},{"key":28,"text":268,"correct":26},{"key":31,"text":270,"correct":26},[614,618,621,624,627,630],{"id":615,"name":616,"category":7,"favorite":617},136,"法律职业试卷二(客观题 )",2,{"id":619,"name":620,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":622,"name":623,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":625,"name":626,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":628,"name":629,"category":7,"favorite":8},28,"安全工程师",{"id":631,"name":632,"category":7,"favorite":8},112,"安全生产法律知识"]