[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-386536":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},386536,168,1,"单选题","（ ）在软件开发机构中被广泛用来指导软件过程改进。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","能力成熟度模型（Capacity Maturity Model）",true,{"key":16,"text":17,"correct":18},"B","关键过程领域（Key Process Areas）",false,{"key":20,"text":21,"correct":18},"C","需求跟踪能力链（Traceability Link）",{"key":23,"text":24,"correct":18},"D","工作分解结构（Work Breakdown、Structure）","能力成熟度模型(CMM)描述了软件发展的演进过程，从毫无章法、不成熟的软件开发阶段到成熟软件开发阶段的过程。以CMM的架构而言，它涵盖了规划、软件工程、管理、软件开发及维护等技巧，若能确实遵守规定的关键技巧，可协助提升软件部门的软件设计能力，达到成本、时几间、功能与品质的目标。CMM在软件开发机构中被广泛用来指导软件过程改进。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)网络规划设计师","职业资格",0]