[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-386497":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},386497,168,1,"单选题","某四级指令流水线分别完成取指、取数、运算、保存结果四步操作。若完成上述操作的时间依次为 8ns、9ns、 4ns、8ns，则该流水线的操作周期应至少为（10）ns 。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","4",false,{"key":16,"text":17,"correct":14},"B","8",{"key":19,"text":20,"correct":21},"C","9",true,{"key":23,"text":24,"correct":14},"D","33","",{"id":6,"name":27,"category":28,"favorite":29},"(高级)网络规划设计师","职业资格",0]