[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-167-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},167,"(中级) 信息系统监理师","职业资格",0,7,50,360,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,249,261,273,285,297,309,320,332,344,356,368,380,392,404,416,428,440,451,463,475,487,499,510,522,534,546,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},386294,1,"单选题","依据GB\u002FT14394—2008《计算机软件可靠性和可维护性管理》，以下关于在软件生存周期各个过程中对可靠性和可维护性管理要求的叙述中，不正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","在概念活动中提出软件可靠性和可维护性分解目标、要求和经费",false,{"key":24,"text":25,"correct":22},"B","在需求活动中制定各实施阶段的基本准则，确定各实施阶段的验证方法",{"key":27,"text":28,"correct":29},"C","在设计活动中明确对编码、测试阶段的具体要求，评价或审查代码以验证相应要求的实现",true,{"key":31,"text":32,"correct":22},"D","在测试活动中建立适当的软件可靠性测试环境，组织分析测试和测量的数据，进行风险分析","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},386295,"依据GB\u002FT 16260.2—2006《软件工程产品质量第2部分：外部质量的度量》，评估软件的帮助系统和文档的有效性是对软件进行（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"易理解性度量",{"key":24,"text":41,"correct":22},"易操作性度量",{"key":27,"text":43,"correct":22},"吸引性度量",{"key":31,"text":45,"correct":29},"易学性度量",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},386296,"（ ）是一种通过学习、得出自己的结论、表现出理解复杂内容、与人进行自然对话等来模仿人类的行为，从而增强人的认知能力（也被称为“认知计算”）或取代人们执行非日常任务的技术。",[50,52,54,56],{"key":20,"text":51,"correct":22},"云服务",{"key":24,"text":53,"correct":22},"区块链",{"key":27,"text":55,"correct":22},"物联网",{"key":31,"text":57,"correct":29},"人工智能",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},386297,"区块链是分布式数据存储、点对点传输、共识机制、（ ）等计算机技术的新型应用模式。",[62,64,66,68],{"key":20,"text":63,"correct":22},"数据库",{"key":24,"text":65,"correct":29},"加密算法",{"key":27,"text":67,"correct":22},"链式数据结构",{"key":31,"text":69,"correct":22},"中心化数据库",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},386298,"根据《合同法》的规定，下列经济合同中属于无效合同的有（ ）",[74,76,78,80],{"key":20,"text":75,"correct":22},"甲、乙双方对商品质量标准认识不统一，而错误签订的合同",{"key":24,"text":77,"correct":29},"甲、丙双方签订的将无标签服装伪造成名牌进口服装的合同",{"key":27,"text":79,"correct":22},"乙方未经丙方授权，代表丙方与丁签订的合同，经乙方追认的",{"key":31,"text":81,"correct":22},"显失公平的合同",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},386299,"电子政务的内容非常广泛，常见的电子报税属于（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"B2B",{"key":24,"text":89,"correct":22},"B2C",{"key":27,"text":91,"correct":29},"B2G",{"key":31,"text":93,"correct":22},"G2C",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},386300,"某系统集成项目包含了三个软件模块，现在估算项目成本时，项目经理考虑到其中的模块A技术成熟，已在以前类似项目中多次使用并成功支付，所有项目经理忽略了A的开发成本，只给A预留了5万元，以防意外发生。然后估算了B的成本为50万元，C成本为30万元，应急储备为10万元，三者集成成本为5万元，并预留了项目的10万元管理储备。如果你是项目组成员，该项目的成本基准是（请作答此空）万元，项目预算是（ ）万元。项目开始执行后，当项目的进度绩效指数SPI为0.6时，项目实际花费为70万元，超出预算10万元，如果不加以纠偏，请根据当前项目进展，估算该项目的完工估算值（EA C）为（ ）万元",[98,100,102,104],{"key":20,"text":99,"correct":22},"90",{"key":24,"text":101,"correct":22},"95",{"key":27,"text":103,"correct":29},"100",{"key":31,"text":105,"correct":22},"110",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},386301,"下列选项中，不是总监职责的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"主持编写工程项目监理规划",{"key":24,"text":113,"correct":22},"参与工程质量事故的调查",{"key":27,"text":115,"correct":29},"复核并签署原始凭证及文件",{"key":31,"text":117,"correct":22},"确定监理项目部人员的分工",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},386302,"监理人员在进行需求变更管理时需要遵守的规则不包括：（ ）",[122,124,126,128],{"key":20,"text":123,"correct":22},"每一项变更都需要对变更申请进行评估",{"key":24,"text":125,"correct":29},"变更所产生的费用过小的可不用提出申请",{"key":27,"text":127,"correct":22},"监理工程师必须与总监理工程师商议所有提出的变更",{"key":31,"text":129,"correct":22},"任何变更都要得到三方（建设单位、监理单位和承建单位）书面确认",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},386303,"按使用的测试技术不同，将软件测试分为静态测试和动态测试，下列（ ）属于静态测试。",[134,136,138,140],{"key":20,"text":135,"correct":22},"单元测试",{"key":24,"text":137,"correct":22},"系统测试",{"key":27,"text":139,"correct":29},"代码质量度量",{"key":31,"text":141,"correct":22},"白盒测试",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},386304,"下列选项中，对于监理单位的风险防范方法错误的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":29},"谨慎编写监理规划",{"key":24,"text":149,"correct":22},"严格履行合同",{"key":27,"text":151,"correct":22},"提高专业技能",{"key":31,"text":153,"correct":22},"提高管理水平",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},386305,"信息系统工程项目投资构成中的设计费属于（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"工程费",{"key":24,"text":161,"correct":22},"工程前期费",{"key":27,"text":163,"correct":29},"咨询\u002F设计费",{"key":31,"text":165,"correct":22},"工程验收费",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},386306,"监理实施细则的内容内容不包括（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":29},"工程项目概况",{"key":24,"text":173,"correct":22},"监理流程",{"key":27,"text":175,"correct":22},"监理的控制要点及目标",{"key":31,"text":177,"correct":22},"监理单位法及措施",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},386307,"信息系统工程监理与设备监理是目前我国实施的（ ）的监理体系，仅在“信息工程设备监理”上有交叉。两者可以互相借鉴，但不矛盾。",[182,184,186,188],{"key":20,"text":183,"correct":22},"两类相似、相互依赖",{"key":24,"text":185,"correct":29},"两类不同、相互独立",{"key":27,"text":187,"correct":22},"两类一致、相互独立",{"key":31,"text":189,"correct":22},"两类不同相互依赖",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},386308,"某政府单位花1000万委托软件公司开发一套软件，因合同中未约定知识产权相关问题，软件开发完成后产权属于（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":29},"软件公司",{"key":24,"text":197,"correct":22},"甲方",{"key":27,"text":199,"correct":22},"双方共同享有",{"key":31,"text":201,"correct":22},"以上答案都不对",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},386309,"信息技术服务标准（ITSS）定义了IT服务的核心要素由人员、过程、技术和资源组成。（ ）要素关注“高效做事”。",[206,208,210,212],{"key":20,"text":207,"correct":22},"人员",{"key":24,"text":209,"correct":22},"过程",{"key":27,"text":211,"correct":29},"技术",{"key":31,"text":213,"correct":22},"资源",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},386310,"下列说法错误的是（ ）",[218,220,222,224],{"key":20,"text":219,"correct":29},"应按照“守法、公平、公正、独立”的原则，开展信息系统工程监理工作，重点维护建设单位的合法权益；",{"key":24,"text":221,"correct":22},"在监理过程中因违犯国家法律、法规，造成重大质量、安全事故的，应承担相应的经济责任和法律责任。",{"key":27,"text":223,"correct":22},"不得与被监理项目的承建单位存在隶属关系和利益关系",{"key":31,"text":225,"correct":22},"不得以任何形式侵害建设单位和承建单位的知识产权",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},386311,"合同履行管理的方式是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"合同分析",{"key":24,"text":233,"correct":29},"合同控制",{"key":27,"text":235,"correct":22},"合同监督",{"key":31,"text":237,"correct":22},"项目索赔管理",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},386312,"变更在信息系统工程实际的建设过程中是经常发生的，做好变更控制可以更好地为质量控制、进度控制和成本控制服务。以下关于信息系统工程变更的说法，（ ）是不正确的。",[242,244,245,247],{"key":20,"text":243,"correct":22},"项目实施过程中，变更处理越早，损失越小",{"key":24,"text":129,"correct":22},{"key":27,"text":246,"correct":29},"只有承建单位和建设单位才能提出变更申请",{"key":31,"text":248,"correct":22},"建设单位由于机构重组等原因造成业务流程的变化，可能导致变更",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},386313,"监理规划是监理企业接受承建单位委托并签订建设工程委托监理合同后，由（ ）主持编写的。",[253,255,257,259],{"key":20,"text":254,"correct":22},"监理单位技术总监",{"key":24,"text":256,"correct":29},"项目总监理工程师",{"key":27,"text":258,"correct":22},"专业监理工程师",{"key":31,"text":260,"correct":22},"监理单位主管副总经理",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":27,"analysis":33},386314,"信息系统的生命周期可以分为立项、开发、运维及消亡四个阶段。以下对各阶段的叙述中，不正确的是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"立项阶段：依据用户业务发展和经营管理的需求，提出建设信息系统的初步构想，对企业信息系统的需求进行深入调研和分析，形成《需求规格说明书》",{"key":24,"text":268,"correct":22},"开发阶段：通过系统分析，系统设计、系统实施、系统验收等工作实现并交付系统",{"key":27,"text":270,"correct":29},"运维阶段：信息系统通过验收，正式移交给用户后的阶段，系统的运行维护就是更正性维护",{"key":31,"text":272,"correct":22},"消亡阶段：信息系统不可避免的会遇到更新改造甚至废弃重建等",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":27,"analysis":33},386315,"监理工作主要内容不包含（ ）",[277,279,281,283],{"key":20,"text":278,"correct":22},"变更控制",{"key":24,"text":280,"correct":22},"投资控制",{"key":27,"text":282,"correct":29},"范围控制",{"key":31,"text":284,"correct":22},"合同管理",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},386316,"以下关于变更的描述，不正确的是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"变更申请单位向监理工程师提出变更要求，提交书面工程变更建议书",{"key":24,"text":292,"correct":22},"工程变更建议书主要包括：变更的原因及依据、变更的内容及范围、变更引起的合同总价和工期增加或减少等",{"key":27,"text":294,"correct":22},"工程变更建议书应在预计可能变更的时间之前14天前提出",{"key":31,"text":296,"correct":29},"监理机构无权驳回变更申请，需由建设单位同意后才可驳回",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},386317,"（ ）的质量控制体系能否有效运行是整体项目质量控制的关键。",[301,303,305,307],{"key":20,"text":302,"correct":22},"建设单位",{"key":24,"text":304,"correct":29},"承建单位",{"key":27,"text":306,"correct":22},"监理单位",{"key":31,"text":308,"correct":22},"三方",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":27,"analysis":33},386318,"错误推测法属于（ ）。",[313,314,316,318],{"key":20,"text":141,"correct":22},{"key":24,"text":315,"correct":22},"灰盒测试",{"key":27,"text":317,"correct":29},"黑盒测试",{"key":31,"text":319,"correct":22},"静态测试",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},386319,"软件需求分析方法中不属于模型驱动法的是（26）。",[324,326,328,330],{"key":20,"text":325,"correct":22},"SA（结构化分析）",{"key":24,"text":327,"correct":22},"IE（信息工程建模）",{"key":27,"text":329,"correct":22},"OOA（面向对象分析）",{"key":31,"text":331,"correct":29},"RAA（快速架构分析）",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":27,"analysis":33},386320,"立项的四个阶段和主要工作内容主要包括立项准备、立项申请、立项审批（ ）",[336,338,340,342],{"key":20,"text":337,"correct":22},"招投标",{"key":24,"text":339,"correct":22},"确定中标人",{"key":27,"text":341,"correct":29},"招投标及合同签订",{"key":31,"text":343,"correct":22},"项目实施",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},386321,"以下关于成本控制说法错误的是（ ）",[348,350,352,354],{"key":20,"text":349,"correct":29},"在紧急情况下，应该先批准追加投资，其主要目的是为了保证项目的顺利进行",{"key":24,"text":351,"correct":22},"在项目实施过程中，必要时应对预算进行修正",{"key":27,"text":353,"correct":22},"应尽量保证项目的成本在原定的预算范围之内",{"key":31,"text":355,"correct":22},"对成本超支等情况，应及时进行分析并提出整改措施、总结教训",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},386322,"某软件开发项目的《概要设计说明书》版本号为1.2，该配置项的状态是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"首次发布",{"key":24,"text":363,"correct":29},"正式发布",{"key":27,"text":365,"correct":22},"正在发布",{"key":31,"text":367,"correct":22},"草稿",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},386323,"会议是沟通和协调的重要方法。以下说法错误的是（ ）",[372,374,376,378],{"key":20,"text":373,"correct":22},"做好会议准备工作",{"key":24,"text":375,"correct":22},"参会人员要充分而且必要，以便缩小会议规模",{"key":27,"text":377,"correct":22},"若可用更简单办法解决问题则不必开会",{"key":31,"text":379,"correct":29},"会议议题应多样化，应利用会议解决更多的问题",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},386324,"某大型布线项目，由甲、乙两个子项目组成。甲项目场地准备需要3天，施工需要5天；乙项目场地准备需要2天，施工需要4天。两个项目在进行施工准备时都需要使用专用设备，在只有一台可用的专用设备的情况下，此项目至少需要（ ）天才能完成。",[384,386,388,390],{"key":20,"text":385,"correct":29},"9天",{"key":24,"text":387,"correct":22},"10天",{"key":27,"text":389,"correct":22},"11天",{"key":31,"text":391,"correct":22},"12天",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":27,"analysis":33},386325,"完成某信息系统集成项目中的一个最基本的工作单元A所需的时间，乐观的估计需7天，悲观的估计需19天，最可能的估计需13天，按照PERT方法进行估算，项目的工期应该为（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":22},"11",{"key":24,"text":399,"correct":22},"12",{"key":27,"text":401,"correct":29},"13",{"key":31,"text":403,"correct":22},"14",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},386326,"某项目经理为某软件开发项目制作了如下双代号网络图（单位：天），该项目的总工期为（ ）天。",[408,410,412,414],{"key":20,"text":409,"correct":22},"40",{"key":24,"text":411,"correct":29},"37",{"key":27,"text":413,"correct":22},"34",{"key":31,"text":415,"correct":22},"32",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},386327,"如下图，为某信息化工程项目经理绘制的箭线图，其中活动的时间单位为周，活动G中的员工最多可以休息（ ）周而不会影响项目的完工日期。",[420,422,424,426],{"key":20,"text":421,"correct":29},"4",{"key":24,"text":423,"correct":22},"3",{"key":27,"text":425,"correct":22},"2",{"key":31,"text":427,"correct":22},"1",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},386328,"某项目有40%的概率获利10万元，30%概率会亏损8万元，30%的概率既不获利也不亏损。该项目的预期货币价值分析（EMV）是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"0元",{"key":24,"text":435,"correct":29},"1.6万元",{"key":27,"text":437,"correct":22},"2万元",{"key":31,"text":439,"correct":22},"6.4万元",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},386329,"某项目预计最快12天完成，最慢36天完成，21天完成的可能性最大。公司下达的计划是18天完成，要使计划完成的概率达到50%，在计划中需要增加（ ）天应急时间。",[444,445,447,449],{"key":20,"text":421,"correct":29},{"key":24,"text":446,"correct":22},"6",{"key":27,"text":448,"correct":22},"8",{"key":31,"text":450,"correct":22},"22",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":27,"analysis":33},386330,"某项目由并行的3个模块 A、B和C组成，其中活动A需要3人5天时间完成。活动B需要6人7天时间完成。活动C需要4人2天时间完成，为了保证项目在最短时间内完成。则最少应该为项目配置（ ）人。",[455,457,459,461],{"key":20,"text":456,"correct":22},"7人",{"key":24,"text":458,"correct":22},"9人",{"key":27,"text":460,"correct":29},"10人",{"key":31,"text":462,"correct":22},"11人",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":20,"analysis":33},386331,"critical path for a project is the series of activities that determine（ ）by which the projectcan be completed. 项目的关键路径是确定 项目可以完成的一系列活动 A.the earliest time 最早完成时间 B.the latest time 最迟完成的时间",[467,469,471,473],{"key":20,"text":468,"correct":29},"the total time",{"key":24,"text":470,"correct":22},"总时间",{"key":27,"text":472,"correct":22},"the free time",{"key":31,"text":474,"correct":22},"自由时间 .",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},386332,"关于“信息化”的描述，不正确的是： （ ） 。",[479,481,483,485],{"key":20,"text":480,"correct":22},"信息化的空域是政治、经济、文化、军事和社会的一切领域",{"key":24,"text":482,"correct":22},"信息化的手段是基于现代信息技术的先进社会生产工具",{"key":27,"text":484,"correct":22},"信息化的目标是使国家的综合实力，社会的文明素质和人民的生活质量全面达到现代化水平",{"key":31,"text":486,"correct":29},"信息化的主体是部分社会成员，包括政府、企业和个人",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},386333,"软件能力成熟度（CMM）模型提供了一个框架，将软件过程改进的进化步骤组织成5个成熟等级，为过程不断改进奠定了循序渐进的基础。由低到高5个等级命名为 （ ） 。",[491,493,495,497],{"key":20,"text":492,"correct":29},"初始级、可重复级、已定义级、已管理级、优化级",{"key":24,"text":494,"correct":22},"初始级、已定义级、可重复级、已管理级、优化级",{"key":27,"text":496,"correct":22},"初始级、可重复级、已管理级、已定义级、优化级",{"key":31,"text":498,"correct":22},"初始级、已定义级、已管理级、可重复级、优化级",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":31,"analysis":33},386334,"信息系统工程监理单位的主要任务是“四控、三管、一协调”，其中“三管”内容包括 （ ） 。",[503,505,507,509],{"key":20,"text":504,"correct":22},"进度管理",{"key":24,"text":506,"correct":22},"成本管理",{"key":27,"text":508,"correct":22},"质量管理",{"key":31,"text":284,"correct":29},{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":31,"analysis":33},386335,"进度、费用、质量是工程项目管理的三个重要目标，当SPI",[514,516,518,520],{"key":20,"text":515,"correct":22},"进度超前，费用节余",{"key":24,"text":517,"correct":22},"进度滞后，费用节余",{"key":27,"text":519,"correct":22},"进度超前，费用超支",{"key":31,"text":521,"correct":29},"进度滞后，费用超支",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":27,"analysis":33},386336,"根据GB\u002FT 16260.1—2006《软件工程产品质量》，软件产品使用质量特性中的可靠性，是指与软件在规定的一段时间内和规定的条件下维持其性能水平的一组软件属性。 （ ） 属于维护性特性。",[526,528,530,532],{"key":20,"text":527,"correct":22},"安全性",{"key":24,"text":529,"correct":22},"成熟型",{"key":27,"text":531,"correct":29},"稳定性",{"key":31,"text":533,"correct":22},"可恢复性",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":24,"analysis":33},386337,"信息系统受到破坏后，会对公民、法人和其他组织的合法权益产生严重损害，或者对社会秩序和公共利益造成损害，但不损害国家安全，根据GB\u002FT 22240—2008《信息系统安全等级保护定级指南》，该信息系统的安全保护等级至少应定为 （ ） 级。",[538,540,542,544],{"key":20,"text":539,"correct":22},"一",{"key":24,"text":541,"correct":29},"二",{"key":27,"text":543,"correct":22},"三",{"key":31,"text":545,"correct":22},"四",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":20,"analysis":33},386338,"软件开发“螺旋模型”是经常使用的一种模型，它是 （请作答此空） 的结合，强调软件开发过程中的风险分析，特别适合于大型复杂的系统。螺旋模型沿着螺线进行若干次迭代，每次迭代中的活动依次为 （ ） 。",[550,552,554,556],{"key":20,"text":551,"correct":29},"瀑布模型和快速原型模型",{"key":24,"text":553,"correct":22},"瀑布模型和增量模型",{"key":27,"text":555,"correct":22},"迭代模型和快速原型模型",{"key":31,"text":557,"correct":22},"敏捷模型和原型模型",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":20,"analysis":33},386339,"监理项目实行总监理工程师负责制，对信息工程监理合同的实施负全面责任，如果监理工程师出现工作过失，违反了合同约定，由 （请作答此空） 向建设单位承担违约责任；重大工程质量事故发生后，总监理工程师首先要做的事情是 （ ） ，在处理工程质量事故时应解决的关键问题是 （ ） 。",[562,564,566,568],{"key":20,"text":563,"correct":29},"工程监理企业",{"key":24,"text":565,"correct":22},"总监理工程师",{"key":27,"text":567,"correct":22},"监理工程师",{"key":31,"text":569,"correct":22},"工程监理企业和监理工程师共同",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":27,"analysis":33},386340,"下列选项中哪些是需求分析阶段的成果 （ ） 。",[574,576,578,580],{"key":20,"text":575,"correct":22},"概要设计说明书",{"key":24,"text":577,"correct":22},"软件编码规范",{"key":27,"text":579,"correct":29},"软件质量保证计划",{"key":31,"text":581,"correct":22},"用户手册",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},386341,"监理项目实行总监理工程师负责制，对信息工程监理合同的实施负全面责任，如果监理工程师出现工作过失，违反了合同约定，由 （ ） 向建设单位承担违约责任；重大工程质量事故发生后，总监理工程师首先要做的事情是 （请作答此空） ，在处理工程质量事故时应解决的关键问题是 （ ） 。",[586,588,590,592],{"key":20,"text":587,"correct":29},"签发《工程暂停令》",{"key":24,"text":589,"correct":22},"要求承建单位保护现场",{"key":27,"text":591,"correct":22},"要求承建单位24 小时内上报",{"key":31,"text":593,"correct":22},"更换监理工程师",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":27,"analysis":33},386342,"（ ） 不属于监理合同内容。",[598,600,602,604],{"key":20,"text":599,"correct":22},"双方约定的其他事项。",{"key":24,"text":601,"correct":22},"违约责任及争议的解决方法",{"key":27,"text":603,"correct":29},"监理单位、承建单位三方的权利和义务",{"key":31,"text":605,"correct":22},"监理费用的计取和支付方式",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":27,"analysis":33},386343,"公司刚刚中标一个大型系统集成项目，其中一台设备计划从国外采购，近期汇率波动明显，A公司准备与客户协商等汇率有可能降低时再采购，这是采用了 （ ） 风险应对策略。",[610,612,614,616],{"key":20,"text":611,"correct":22},"回避",{"key":24,"text":613,"correct":22},"转移",{"key":27,"text":615,"correct":29},"减轻",{"key":31,"text":617,"correct":22},"接受",[619,623,626,629,632,635],{"id":620,"name":621,"category":7,"favorite":622},136,"法律职业试卷二(客观题 )",2,{"id":624,"name":625,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":627,"name":628,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":630,"name":631,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":633,"name":634,"category":7,"favorite":8},28,"安全工程师",{"id":636,"name":637,"category":7,"favorite":8},112,"安全生产法律知识"]