[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-167-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},167,"(中级) 信息系统监理师","职业资格",0,6,50,360,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,405,417,429,441,453,465,477,489,501,513,525,537,549,561,573,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},386244,1,"单选题","关于变更控制工作程序的描述，正确的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","变更的初审→了解变化→变更分析→接受变更申请→确定变更方法→监控变更的实施→变更效果评估",false,{"key":24,"text":25,"correct":22},"B","了解变化→接受变更申请→确定变更方法→变更的初审→变更分析→监控变更的实施→变更效果评估",{"key":27,"text":28,"correct":22},"C","接受变更申请→了解变化→变更分析→确定变更方法→变更的初审→监控变更的实施→变更效果评估",{"key":30,"text":31,"correct":32},"D","了解变化→接受变更申请→变更的初审→变更分析→确定变更方法→监控变更的实施→变更效果评估",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},386245,"下列不属于工程监理总结报告的内容的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"工程概况",{"key":24,"text":41,"correct":32},"工程变更综述",{"key":27,"text":43,"correct":22},"工程质量综述",{"key":30,"text":45,"correct":22},"工程进度综述",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},386246,"《GB\u002FT 19668.1—2005信息化工程监理规范》不能满足时代的要求，为此，工信部组织有关国内知名监理专家于2011年启动了国标的改版工作。薛大龙教授作为编写组专家，受邀参与了国家标准（ ）【GB\u002FT19668.1】的改版工作。GB\u002FT19668.1于2014年12月发布，2015年4月1日实施。",[50,52,54,56],{"key":20,"text":51,"correct":32},"《信息技术服务监理第1部分：部则》",{"key":24,"text":53,"correct":22},"《网络技术服务监理第1部分：部则》",{"key":27,"text":55,"correct":22},"《计算机技术服务监理第1部分：部则》",{"key":30,"text":57,"correct":22},"《软件技术服务监理第1部分：部则》",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},386247,"通常双绞线系统的测试指标中，（37）是由于集肤效应、绝缘损耗、阻抗不匹配、连接电阻等因素，造成信号沿链路传输的损失。",[62,64,66,68],{"key":20,"text":63,"correct":32},"衰减值",{"key":24,"text":65,"correct":22},"近端串绕",{"key":27,"text":67,"correct":22},"传输延迟",{"key":30,"text":69,"correct":22},"回波损耗",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},386248,"在某电子政务系统建设过程中，（10）是恰当的处理方式。",[74,76,78,80],{"key":20,"text":75,"correct":22},"公司技术总监在充分考核项目实际和人员水平的基础上调换被投诉的监理工程师",{"key":24,"text":77,"correct":22},"总监理工程师代表根据合同中付款的相关规定，签发符合付款条件的支付证书",{"key":27,"text":79,"correct":32},"监理辅助人员对采购的网络设备联调测试进行监督和记录",{"key":30,"text":81,"correct":22},"专业监理工程师负责编写监理细则并交叉审批",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},386249,"在UML提供的图中，（27）用于按时间顺序描述对象之间的交互",[86,88,90,92],{"key":20,"text":87,"correct":22},"网络图",{"key":24,"text":89,"correct":22},"状态图",{"key":27,"text":91,"correct":22},"协作图",{"key":30,"text":93,"correct":32},"序列图",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},386250,"软件测试类型按开发阶段分依次是（30）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"需求测试、单元测试、集成测试、验证测试",{"key":24,"text":101,"correct":22},"单元测试、系统测试、集成测试、验收测试",{"key":27,"text":103,"correct":32},"单元测试、集成测试、确认测试、系统测试",{"key":30,"text":105,"correct":22},"调试、单元测试、集成测试、用户测试",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},386251,"信息系统安全技术要求的四个方面主要包括物理安全、运行安全、信息安全、（ ）",[110,112,114,116],{"key":20,"text":111,"correct":32},"安全管理",{"key":24,"text":113,"correct":22},"设备安全",{"key":27,"text":115,"correct":22},"技术安全",{"key":30,"text":117,"correct":22},"病毒安全",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},386252,"评估与验收要以（ ）为基准，以测试（ ）为依据，以合同各方法人或受法人委托的代表签字及单位盖章为确认。",[122,124,126,128],{"key":20,"text":123,"correct":22},"招标文件合同",{"key":24,"text":125,"correct":22},"项目实际进展情况合同",{"key":27,"text":127,"correct":32},"合同测试结果",{"key":30,"text":129,"correct":22},"测试结果合同",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},386253,"以下（ ）不属于沟通与协调原则中的内容",[134,136,138,140],{"key":20,"text":135,"correct":22},"目标一致",{"key":24,"text":137,"correct":22},"信息共享",{"key":27,"text":139,"correct":22},"携手共进",{"key":30,"text":141,"correct":32},"目标分歧",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},386254,"以下关于质量保证说法正确的是（ ）",[146,148,150,152],{"key":20,"text":147,"correct":22},"由于监理单位作为独立的第三方，主要起着监督管理单位，因此监理单位在此阶段所开展的工作，对质量保证工作起着决定性作用",{"key":24,"text":149,"correct":32},"在此阶段承建单位起着决定性作用",{"key":27,"text":151,"correct":22},"建设单位作为项目发起人，有这至高无上的权利，因此其的决定性意见对质量保证起着主导作用。",{"key":30,"text":153,"correct":22},"监理单位与承建单位在质量保证阶段，都起着主导作用",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},386255,"信息系统安全保护的五个等级，分别是用户自主保护级、系统审计保护级、（ ）、结构化保护级、访问验证保护级。",[158,160,162,164],{"key":20,"text":159,"correct":22},"系统安全保护级",{"key":24,"text":161,"correct":22},"信息安全保护级",{"key":27,"text":163,"correct":32},"安全标记保护级",{"key":30,"text":165,"correct":22},"系统策略保护级",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},386256,"以下（ ）内容不属于监理合同的主要内容。",[170,172,174,176],{"key":20,"text":171,"correct":22},"监理业务内容",{"key":24,"text":173,"correct":32},"所监理项目范围",{"key":27,"text":175,"correct":22},"监理报酬支付",{"key":30,"text":177,"correct":22},"双方权利和业务",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},386257,"项目采用挣值法进行综合分析后得到：ACWP>BCWS>BCWP．则项目（53）。",[182,184,186,188],{"key":20,"text":183,"correct":32},"费用超支",{"key":24,"text":185,"correct":22},"进度延误",{"key":27,"text":187,"correct":22},"进度提前",{"key":30,"text":189,"correct":22},"投入落后",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":30,"analysis":33},386258,"在绘制网络图时，我们常用的ADM指的是（ ）",[194,196,198,200],{"key":20,"text":195,"correct":22},"前导图",{"key":24,"text":197,"correct":22},"双代号网络图",{"key":27,"text":199,"correct":22},"鱼刺图",{"key":30,"text":201,"correct":32},"箭线图",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},386259,"下列（ ）不属于范围管理的内容。",[206,208,210,212],{"key":20,"text":207,"correct":32},"编制项目管理计划",{"key":24,"text":209,"correct":22},"收集需求",{"key":27,"text":211,"correct":22},"范围定义",{"key":30,"text":213,"correct":22},"建立WBS",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},386260,"对于大型项目，集成商有时会将某些子系统，或子系统中某些模块委托给另外的软件开发商完成，或者将系统中的某些服务项目交由另外的信息服务提供商实施，称为（ ）",[218,220,222,224],{"key":20,"text":219,"correct":32},"外包",{"key":24,"text":221,"correct":22},"总承包",{"key":27,"text":223,"correct":22},"总合同",{"key":30,"text":225,"correct":22},"项目集成",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},386261,"在某工程网络计划中，工作E有两项紧后工作，这两项紧后工作的最早开始时间和最迟开始时间分别为21天和第25天，工作E的最早开始时间和最迟开始时间分别为第10天和第19天，如果工作E的持续时间为9天，则工作E的（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":32},"总时差为9天",{"key":24,"text":233,"correct":22},"自由时差为1天",{"key":27,"text":235,"correct":22},"总时差为2天",{"key":30,"text":237,"correct":22},"自由时差为2天",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},386262,"某电子商务公司要从A地向B地的用户发送一批价值90000元的货物。从A地到B地有水、陆两条路线。走陆路时比较安全，其运输成本为10000元；走水路时一般情况下的运输成本只要7000元，不过一旦遇到暴风雨天气，则会造成相当于这批货物总价值的10%的损失。根据历年情况，这期间出现暴风雨天气的概率为1\u002F4，那么该电子商务公司（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":32},"应选择走水路",{"key":24,"text":245,"correct":22},"应选择走陆路",{"key":27,"text":247,"correct":22},"难以选择路线",{"key":30,"text":249,"correct":22},"可以随机选择路线",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":30,"analysis":33},386263,"在对某项目采购供应商的评价中，评价项有：技术能力、管理水平、企业资质等，假定满分为10分，技术能力权重为20%，三个评定人的技术能力打分分别为7分，8分，9分，那么该供应商的“技术能力”的单项综合分为（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"24",{"key":24,"text":257,"correct":22},"8",{"key":27,"text":259,"correct":22},"4.8",{"key":30,"text":261,"correct":32},"1.6",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},386264,"根据GB\u002FT 16260.1—2006《软件工程产品质量》，软件产品使用质量特性中的可靠性，是指与软件在规定的一段时间内和规定的条件下维持其性能水平的一组软件属性。（ ）不属于可靠性质量特性。",[266,268,270,272],{"key":20,"text":267,"correct":32},"安全性",{"key":24,"text":269,"correct":22},"成熟型",{"key":27,"text":271,"correct":22},"容错性",{"key":30,"text":273,"correct":22},"可恢复性",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},386265,"如果将盖房子比作购买云计算服务，购买商品房、购买地皮自己盖房子、入住酒店总统套房，分别对应（ ）服务。",[278,280,282,284],{"key":20,"text":279,"correct":32},"PAAS LAAS SAAS",{"key":24,"text":281,"correct":22},"LAAS PAAS SAAS",{"key":27,"text":283,"correct":22},"SAAS LAAS PAAS",{"key":30,"text":285,"correct":22},"LAAS SAAS LAAS",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},386266,"下图中的项目组织结构属于（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"项目型组织",{"key":24,"text":293,"correct":32},"职能型组织",{"key":27,"text":295,"correct":22},"弱矩阵型组织",{"key":30,"text":297,"correct":22},"强矩阵型组织",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},386267,"区块链2.0技术架构自上而下分为数据层、网络层、共识层、激励层、智能合约层，数字签名、非对称加密属于其中的（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":32},"数据层",{"key":24,"text":305,"correct":22},"网络层",{"key":27,"text":307,"correct":22},"共识层",{"key":30,"text":309,"correct":22},"激励层",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},386268,"信息系统项目管理的14要素中，（ ）和评估与验收管理是由建设单位重点实施的。",[314,316,318,320],{"key":20,"text":315,"correct":22},"人员管理",{"key":24,"text":317,"correct":32},"立项管理",{"key":27,"text":319,"correct":22},"沟通协调管理",{"key":30,"text":321,"correct":22},"评估与验收管理",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":30,"analysis":33},386269,"下列选项中属于工程费的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"招、投标费用",{"key":24,"text":329,"correct":22},"验收测试费",{"key":27,"text":331,"correct":22},"设计费用",{"key":30,"text":333,"correct":32},"企业管理费",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},386270,"某信息化工程建设过程中由于异常恶劣的气候条件，承建单位工期延误和费用增加，则停工期间承建单位可索赔（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"工期、成本和利润",{"key":24,"text":341,"correct":22},"工期、成本，不能索赔利润",{"key":27,"text":343,"correct":32},"工期，不能索赔成本和利润",{"key":30,"text":345,"correct":22},"成本，不能索赔工期和利润",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":30,"analysis":33},386271,"某项目因甲方不能提供实施环境，严重影响了项目的进度，为此项目组按下列流程提出索赔。图中各方指的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"①招标单位②承建单位③建设单位",{"key":24,"text":353,"correct":22},"①政府部门②建设单位③承建单位",{"key":27,"text":355,"correct":22},"①建设单位②承建单位③监理单位",{"key":30,"text":357,"correct":32},"①承建单位②建设单位③监理单位",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},386272,"以下关于信息系统工程项目描述错误的是（ ）",[362,364,366,368],{"key":20,"text":363,"correct":32},"劳动密集型",{"key":24,"text":365,"correct":22},"可视性差，在度量和检查方面难度较高",{"key":27,"text":367,"correct":22},"在实施过程中要不断地面对“变更”问题，特别是用户需求的变更",{"key":30,"text":369,"correct":22},"投资规模相对较小",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":27,"analysis":33},386273,"依据《国家电子政务工程建设项目档案管理暂行办法》，监理大纲报归档后保管期限是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"10年",{"key":24,"text":377,"correct":22},"20年",{"key":27,"text":379,"correct":32},"30年",{"key":30,"text":381,"correct":22},"永久",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},386274,"以下（ ）不属于十二金",[386,388,390,392],{"key":20,"text":387,"correct":32},"金防",{"key":24,"text":389,"correct":22},"金盾",{"key":27,"text":391,"correct":22},"金保",{"key":30,"text":393,"correct":22},"金质",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},386275,"下列（ ）不属于项目管理要素的主要内容",[398,400,401,403],{"key":20,"text":399,"correct":32},"法律、标准管理",{"key":24,"text":317,"correct":22},{"key":27,"text":402,"correct":22},"计划管理",{"key":30,"text":404,"correct":22},"合同管理",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":27,"analysis":33},386276,"某信息化项目到2019年6月1日的成本执行数据如下表，根据下表数据当该项目为非典型偏差时，完工估算（EA C）为（ ）元，此项目目前（请作答此空）。",[409,411,413,415],{"key":20,"text":410,"correct":22},"成本节约，进度落后",{"key":24,"text":412,"correct":22},"成本超支，进度超前",{"key":27,"text":414,"correct":32},"成本超支，进度落后",{"key":30,"text":416,"correct":22},"成本节约，进度超前",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":30,"analysis":33},386277,"某系统集成企业为做好项目风险管理，给给风险定义了3个参数：（1）风险严重性：指风险对项目造成的危害程度；（2）风险可能性：指风险发生的几率；（3）风险系数：是风险严重性和风险可能性的乘积。其中，对项目进度延误、费用超支的风险严重性等级和风险可能性等级如下表所示： 假定该企业将风险系数大于等于10的情况定义为红灯状态，需要优先处理，则下列（ ）的情况属于红灯状态。",[421,423,425,427],{"key":20,"text":422,"correct":22},"进度延误15%，费用超支15%，发生几率为0.5",{"key":24,"text":424,"correct":22},"进度延误15%，费用超支30%，发生几率为0.2",{"key":27,"text":426,"correct":22},"进度延误15%，费用超支25%，发生几率为0.3",{"key":30,"text":428,"correct":32},"进度延误25%，费用超支15%，发生几率为0.4",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":27,"analysis":33},386278,"在项目实施中间的某次周例会上，项目经理小王用下表向大家通报了目前的进度。根据这个表格，目前项目的进度是（ ）",[433,435,437,439],{"key":20,"text":434,"correct":22},"提前于计划7%",{"key":24,"text":436,"correct":22},"落后于计划18%",{"key":27,"text":438,"correct":32},"落后于计划7%",{"key":30,"text":440,"correct":22},"落后于计划7.5%",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},386279,"某公司希望举办一个展销会以扩大市场，选择北京、天津、上海、深圳作为候选会址。获利情况除了会址关系外，还与天气有关。天气可分为晴、多云、多雨三种。通过天气预报，估计三种天气情况可能发生的概率为0.25、0.50、0.25，其收益（单位：人民币万元）情况见下表。使用决策树进行决策的结果为（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":22},"北京",{"key":24,"text":448,"correct":32},"天津",{"key":27,"text":450,"correct":22},"上海",{"key":30,"text":452,"correct":22},"深圳",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},386280,"某信息化项目到2019年6月1日的成本执行数据如下表，根据下表数据当该项目为非典型偏差时，完工估算（EA C）为（请作答此空）元，此项目目前（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"174860",{"key":24,"text":460,"correct":32},"176840",{"key":27,"text":462,"correct":22},"176804",{"key":30,"text":464,"correct":22},"176480",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},386281,"过去几年小李完成了大量网卡驱动模块的开发，最快6天完成，最慢36天完成，平均21天完成。如今小李开发一个新网卡驱动模块，在21天到26天内完成的概率是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"68.3%",{"key":24,"text":472,"correct":32},"34.1%",{"key":27,"text":474,"correct":22},"58.2%",{"key":30,"text":476,"correct":22},"28.1%",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":27,"analysis":33},386282,"某软件工程项目各开发阶段工作量的比例如下表所示： 假设当前已处于编码阶段，3000行程序已完成了1200行，则可估算出该工程项目开发进度已完成的比例是（ ）",[481,483,485,487],{"key":20,"text":482,"correct":22},"43%",{"key":24,"text":484,"correct":22},"49%",{"key":27,"text":486,"correct":32},"57%",{"key":30,"text":488,"correct":22},"63%",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":24,"analysis":33},386283,"某企业要投产一种新产品，生产方案有四个：A新建全自动生产线；B新建半自动生产线；C购置旧生产设备；D外包加工生产。未来该产品的销售前景估计为很好、一般和较差三种、不同情况下该产品的收益值如下：（单位：百万元） 用后悔值（在同样的条件下，宣传方案所产生的收益损失值）的方案决策应该选（ ）方案。",[493,495,497,499],{"key":20,"text":494,"correct":22},"新建全自动生产线",{"key":24,"text":496,"correct":32},"新建半自动生产线",{"key":27,"text":498,"correct":22},"购置旧生产设备",{"key":30,"text":500,"correct":22},"外包加工生产",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":30,"analysis":33},386284,"监理单位把细则提供给承建单位，能为承建单位起到起到 （ ） 作用。",[505,507,509,511],{"key":20,"text":506,"correct":22},"工作联系单",{"key":24,"text":508,"correct":22},"通知书",{"key":27,"text":510,"correct":22},"体现监理专业水平",{"key":30,"text":512,"correct":32},"提醒与警示",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":27,"analysis":33},386285,"（ ）是“计算机系统内保护装置的总体，包括硬件、软件，固件和负责执行安全策略的组合体。",[517,519,521,523],{"key":20,"text":518,"correct":22},"TIB",{"key":24,"text":520,"correct":22},"HCB",{"key":27,"text":522,"correct":32},"TCB",{"key":30,"text":524,"correct":22},"FTP",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":27,"analysis":33},386286,"依据标准GB\u002FT 11457—2006《信息技术软件工程术语》，（ ）是忽略系统或部件的内部机制只集中于响应所选择的输入和执行条件产生的输出的一种测试，是有助于评价系统或部分与规定的功能需求遵循性的测试。",[529,531,533,535],{"key":20,"text":530,"correct":22},"结构测试",{"key":24,"text":532,"correct":22},"白盒测试",{"key":27,"text":534,"correct":32},"功能测试",{"key":30,"text":536,"correct":22},"性能测试",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},386287,"下列关于软件质量保证活动要素的叙述中，不正确的是（27）。",[541,543,545,547],{"key":20,"text":542,"correct":32},"质量保证人员不能是兼职的",{"key":24,"text":544,"correct":22},"软件开发必须严格按照软件开发规范进行",{"key":27,"text":546,"correct":22},"验证和确认软件质量所用的方法有评审、审查、审计、分析、演示、测试等",{"key":30,"text":548,"correct":22},"应在软件开发过程中及时记录与质量保证有关的活动",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":20,"analysis":33},386288,"依据GB\u002FT 11457—2006《信息技术软件工程术语》，（ ）是一种静态分析技术或评审过程，在此过程中，设计者或程序员引导开发组的成员通读已书写的设计或者代码，其他成员负责提出问题，并对有关技术风格、可能的错误、是否违背开发标准等方面进行评论。",[553,555,557,559],{"key":20,"text":554,"correct":32},"走查",{"key":24,"text":556,"correct":22},"审计",{"key":27,"text":558,"correct":22},"认证",{"key":30,"text":560,"correct":22},"鉴定",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":30,"analysis":33},386289,"以下关于综合布线的叙述中，正确的是：（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"综合布线系统只适用于企业、学校、团体，不适合家庭",{"key":24,"text":568,"correct":22},"垂直干线子系统只能用光纤介质传输",{"key":27,"text":570,"correct":22},"出于安全考虑，大型楼宇的设备间和管理间必须单独设置",{"key":30,"text":572,"correct":32},"楼层配线架不一定在每一楼层都要设置",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":20,"analysis":33},386290,"根据《中华人民共和国政府采购法》，（ ）应作为政府采购的主要方式。",[577,579,581,583],{"key":20,"text":578,"correct":32},"公开招标",{"key":24,"text":580,"correct":22},"邀请招标",{"key":27,"text":582,"correct":22},"竞争性谈判",{"key":30,"text":584,"correct":22},"询价",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":30,"analysis":33},386291,"根据GB\u002FT 11457—2006《软件工程术语》由某人、某小组或借助某种工具对源代码进行的独立的审查，以验证其是否符合软件设计文件和程序设计标准，称为（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":22},"桌面检查",{"key":24,"text":592,"correct":22},"代码评审",{"key":27,"text":594,"correct":22},"代码走查",{"key":30,"text":596,"correct":32},"代码审计",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":20,"analysis":33},386292,"“采用先进成熟的技术和设备，满足当前业务需求，兼顾未来的业务需求”体现了“（ ）”的机房工程设计原则。",[601,603,605,607],{"key":20,"text":602,"correct":32},"实用性和先进性",{"key":24,"text":604,"correct":22},"灵活性和可扩展性",{"key":27,"text":606,"correct":22},"经济性\u002F投资保护",{"key":30,"text":608,"correct":22},"可管理性",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":27,"analysis":33},386293,"甲乙两人分别独立开发出相同主题的阀门，但甲完成在先，乙完成在后。依据专利法规定，（ ）。",[613,615,617,619],{"key":20,"text":614,"correct":22},"甲享有专利申请权，乙不享有",{"key":24,"text":616,"correct":22},"甲不享有专利申请权，乙享有",{"key":27,"text":618,"correct":32},"甲、乙都享有专利申请权",{"key":30,"text":620,"correct":22},"甲、乙都不享有专利申请权",[622,626,629,632,635,638],{"id":623,"name":624,"category":7,"favorite":625},136,"法律职业试卷二(客观题 )",2,{"id":627,"name":628,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":630,"name":631,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":633,"name":634,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":636,"name":637,"category":7,"favorite":8},28,"安全工程师",{"id":639,"name":640,"category":7,"favorite":8},112,"安全生产法律知识"]