[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-167-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},167,"(中级) 信息系统监理师","职业资格",0,3,50,360,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,273,285,297,309,317,329,341,353,365,377,389,400,412,424,436,448,460,472,484,496,508,520,531,543,555,567,579,591,603],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},386093,1,"单选题","质量控制点的作用和意义有很多，其中质量控制点便于对（ ）的分解",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","阶段工作质量目标",false,{"key":24,"text":25,"correct":26},"B","项目工程总目标",true,{"key":28,"text":29,"correct":22},"C","项目施工范围",{"key":31,"text":32,"correct":22},"D","项目总进度","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},386094,"以下关于工程招标及准备阶段质量控制的要点及方法中，说法错误的是（ ）",[38,40,42,44],{"key":20,"text":39,"correct":22},"协助建设单位提出工程需求方案，确定工程的整体质量目标",{"key":24,"text":41,"correct":22},"协助招标公司和建设单位制定评标的评定标准",{"key":28,"text":43,"correct":22},"对招标过程进行监控，如招标过程是否存在不公正的现象等问题",{"key":31,"text":45,"correct":26},"负责建设单位与承建单位合同的拟定与审核工作",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},386095,"质量管理的阶段,大致经历了手工艺人时代、质量检验阶段、（ ）和全面质量管理四个阶段。",[50,52,54,56],{"key":20,"text":51,"correct":26},"统计质量控制阶段",{"key":24,"text":53,"correct":22},"零缺陷质量管理",{"key":28,"text":55,"correct":22},"过程质量管理",{"key":31,"text":57,"correct":22},"精益质量管理",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},386096,"建设单位和承建单位根据监理意见进行处理，处理结果由现场监理组进行确认，并报（ ）签发。",[62,64,66,68],{"key":20,"text":63,"correct":22},"专业监理工程师",{"key":24,"text":65,"correct":22},"项目经理",{"key":28,"text":67,"correct":26},"总监理工程师",{"key":31,"text":69,"correct":22},"总监理工程师代表",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},386097,"以下关于工程设计阶段质量控制的要点及方法中，说法错误的是（ ）",[74,76,78,80],{"key":20,"text":75,"correct":22},"了解建设单位建设需求和对信息系统安全性的要求，协助建设单位制定项目质量目标规划和安全目标规划。",{"key":24,"text":77,"correct":22},"对各种设计文件，提出设计质量标准",{"key":28,"text":79,"correct":22},"审查阶段性设计成果，并提出监理意见",{"key":31,"text":81,"correct":26},"进行设计过程跟踪，及时发现质量问题，并及时下达监理通知书，责令承建单位进行修改完善",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},386098,"在隐蔽工程实施过程中，监理单位一般采用（ ）方法",[86,88,90,92],{"key":20,"text":87,"correct":26},"旁站",{"key":24,"text":89,"correct":22},"抽查",{"key":28,"text":91,"correct":22},"测试",{"key":31,"text":93,"correct":22},"以上都不是",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},386099,"在工程验收阶段，以下（ ）不属于该阶段重点审查的资料",[98,100,102,104],{"key":20,"text":99,"correct":22},"承建单位与各方签订的信息系统工程建设合同",{"key":24,"text":101,"correct":22},"承建单位的设计、实施方案、竣工报告",{"key":28,"text":103,"correct":26},"承建单位出具的试运行报告",{"key":31,"text":105,"correct":22},"用户使用说明书",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},386100,"测试的主要目的不包括（ ）",[110,112,114,116],{"key":20,"text":111,"correct":22},"通过测试发现错误",{"key":24,"text":113,"correct":26},"通过错误杜绝错误",{"key":28,"text":115,"correct":22},"验证软件是否满足相关要求",{"key":31,"text":117,"correct":22},"为软件质量的评价提供依据",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},386101,"关于质量控制点的设置，描述错误的是（ ）",[122,124,126,128],{"key":20,"text":123,"correct":22},"选择的质量控制点应该突出重点",{"key":24,"text":125,"correct":22},"选择的质量控制点应该易于纠偏",{"key":28,"text":127,"correct":26},"保持控制点设置的稳定性和静态性",{"key":31,"text":129,"correct":22},"保持控制点设置的灵活性和动态性",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},386102,"对于工程中的关键性技术指标，以及有争议的质量问题，监理机构应要求承建单位出具（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"第三方测试机构的测试报告",{"key":24,"text":137,"correct":22},"承建方、建设方及监理方三方共同测试并出具测试报告",{"key":28,"text":139,"correct":22},"设计单位测试报告",{"key":31,"text":141,"correct":22},"专家组测试意见",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},386103,"下列空白处指的是（ ）",[146,148,150,152],{"key":20,"text":147,"correct":22},"可用性",{"key":24,"text":149,"correct":26},"可靠性",{"key":28,"text":151,"correct":22},"可持续性",{"key":31,"text":153,"correct":22},"可核实性",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},386104,"质量控制是指信息系统工程实施过程中，在对信息系统质量有重要影响的关键时段进行质量（ ）。在信息工程建设中，监理质量控制最关键的因素是（ ）。在进行控制点设置时，（请作答此空）不是设置质量控制点应遵守的一般原则。",[158,160,162,164],{"key":20,"text":159,"correct":26},"选择的质量控制点应该突出重点，质量控制点都应放置在工程项目建设活动中的关键时刻和关键部位，以利于监理工程师开展质量控制工作",{"key":24,"text":161,"correct":22},"选择的质量控制点应该易于纠偏，有利于监理工程师及时发现质量偏差，同时有利于承建单位控制管理人员及时制定纠偏措施",{"key":28,"text":163,"correct":22},"质量控制点设置要有利于参与工程建设的三方共同从事工程质量的控制活动",{"key":31,"text":165,"correct":22},"保持控制点设置的灵活性和动态性，质量控制点设置并不是一成不变的，必须根据工程进展的实际情况，对已设立的质量控制点应随时进行必要的调整或增减。",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},386105,"以下（ ）工作不适采用评审",[170,172,174,176],{"key":20,"text":171,"correct":26},"合同签订前期合同审核工作",{"key":24,"text":173,"correct":22},"建设单位的用户需求和招标方案",{"key":28,"text":175,"correct":22},"承建单位的质量控制体系和质量保证计划",{"key":31,"text":177,"correct":22},"承建单位有关应用软件开发的重要过程文档",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},386106,"信息系统建立过程中的（ ）是指在力求实现信息工程项目总目标的过程中，为满足信息工程项目总体质量要求所开展的有关的监督管理活动。",[182,184,186,188],{"key":20,"text":183,"correct":22},"质量改进",{"key":24,"text":185,"correct":22},"质量审计",{"key":28,"text":187,"correct":26},"质量控制",{"key":31,"text":189,"correct":22},"质量管理",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},386107,"代码审查属于（ ）技术",[194,196,198,200],{"key":20,"text":195,"correct":22},"黑盒测试",{"key":24,"text":197,"correct":22},"白盒测试",{"key":28,"text":199,"correct":22},"动态测试",{"key":31,"text":201,"correct":26},"静态测试",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},386108,"计划（Plan）、执行（Do）、（ ）和行动（Action），简称PDCA。",[206,208,210,212],{"key":20,"text":207,"correct":22},"测试（Check）",{"key":24,"text":209,"correct":26},"检查（Check）",{"key":28,"text":211,"correct":22},"变更（Check）",{"key":31,"text":213,"correct":22},"分析（Check）",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},386109,"进度控制的基本程序和主要措施不包括：",[218,220,222,224],{"key":20,"text":219,"correct":22},"组织措施",{"key":24,"text":221,"correct":22},"经济措施",{"key":28,"text":223,"correct":22},"合同措施",{"key":31,"text":225,"correct":26},"风险措施",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},386110,"信息系统工程进度控制的主要意义不包含（ ）",[230,232,234,236],{"key":20,"text":231,"correct":22},"有利于尽快发挥投资效益",{"key":24,"text":233,"correct":22},"有利于提高企业经济效益",{"key":28,"text":235,"correct":26},"开展进度控制易增加信息系统的投资风险",{"key":31,"text":237,"correct":22},"有利于降低信息系统工程项目的投资风险",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},386111,"以下（ ）不是信息系统工程项目进度控制的总目标",[242,244,246,248],{"key":20,"text":243,"correct":26},"项目越早完成越好",{"key":24,"text":245,"correct":22},"在计划规定的时间内完成",{"key":28,"text":247,"correct":22},"信息系统达到竣工验收、试运行及投入使用的计划时间",{"key":31,"text":249,"correct":22},"当进度出现偏差时应及时采取整改措施，并使项目回归正常轨道",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},386112,"（ ）又称箭线式网络图，它以箭线表示工作，以节点表示工作的开始或结束状及工作之间的连接点，以工作两端节点的编号代表一项工作。",[254,256,258,260],{"key":20,"text":255,"correct":22},"单代号网络图",{"key":24,"text":257,"correct":26},"双代号络图",{"key":28,"text":259,"correct":22},"进度计划",{"key":31,"text":261,"correct":22},"网络图",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},386113,"下列空白处应该是（ ）",[266,268,270,271],{"key":20,"text":267,"correct":22},"总监代表",{"key":24,"text":269,"correct":26},"总监",{"key":28,"text":65,"correct":22},{"key":31,"text":272,"correct":22},"监理工程师",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},386114,"下图是典型的（ ）",[277,279,281,283],{"key":20,"text":278,"correct":26},"甘特图",{"key":24,"text":280,"correct":22},"鱼刺图",{"key":28,"text":282,"correct":22},"帕累托图",{"key":31,"text":284,"correct":22},"时标网络图",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":28,"analysis":33},386115,"下图空白处应该是（ ）",[289,291,293,295],{"key":20,"text":290,"correct":22},"提出变更结论",{"key":24,"text":292,"correct":22},"提出真该措施",{"key":28,"text":294,"correct":26},"分析偏差原因",{"key":31,"text":296,"correct":22},"以上均不是",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":28,"analysis":33},386116,"下图是典型的“香蕉”曲线法其中曲线A表示的是（ ）",[301,303,305,307],{"key":20,"text":302,"correct":22},"最合理时间计划",{"key":24,"text":304,"correct":22},"最优时间计划",{"key":28,"text":306,"correct":26},"最早时间计划",{"key":31,"text":308,"correct":22},"最迟时间计划",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":311,"answer":20,"analysis":33},386117,[312,313,315,316],{"key":20,"text":255,"correct":26},{"key":24,"text":314,"correct":22},"双代号网络图",{"key":28,"text":278,"correct":22},{"key":31,"text":284,"correct":22},{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":20,"analysis":33},386118,"下图是RACI图，其中R代表的是（ ）",[321,323,325,327],{"key":20,"text":322,"correct":26},"对任务负责人",{"key":24,"text":324,"correct":22},"参与人物",{"key":28,"text":326,"correct":22},"提供意见",{"key":31,"text":328,"correct":22},"及时通知",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},386119,"在进行进度计划编制时，第一步是（ ）",[333,335,337,339],{"key":20,"text":334,"correct":26},"项目描述",{"key":24,"text":336,"correct":22},"项目分解",{"key":28,"text":338,"correct":22},"收集信息",{"key":31,"text":340,"correct":22},"召开会议",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},386120,"在进行工作时间估算时，通过估计工作执行乐观时间a、悲观时间c、正常时间b，对应于PERT网络期望时间t＝（a+4b+c）\u002F6。这是常用的（ ）",[345,347,349,351],{"key":20,"text":346,"correct":22},"单一时间估算",{"key":24,"text":348,"correct":26},"三点估算",{"key":28,"text":350,"correct":22},"自下而上估算",{"key":31,"text":352,"correct":22},"类比估算",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":31,"analysis":33},386121,"影响进度的主要因素不包含（ ）",[357,359,361,363],{"key":20,"text":358,"correct":22},"工程质量的影响",{"key":24,"text":360,"correct":22},"设计变更的影响",{"key":28,"text":362,"correct":22},"资源投入的影响",{"key":31,"text":364,"correct":26},"监理单位管理水平",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},386122,"项目描述表格的主要内容不包含（ ）",[369,371,373,375],{"key":20,"text":370,"correct":22},"项目名称",{"key":24,"text":372,"correct":22},"项目目标",{"key":28,"text":374,"correct":26},"项目主要参与单位",{"key":31,"text":376,"correct":22},"工作规范",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},386123,"产品导向型WBS优点不包含（ ）",[381,383,385,387],{"key":20,"text":382,"correct":26},"静态的",{"key":24,"text":384,"correct":22},"便于检查衡量",{"key":28,"text":386,"correct":22},"利于采购及分包",{"key":31,"text":388,"correct":22},"给予最终产品更多的关注",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},386124,"WBS指的是（ ）",[393,395,397,398],{"key":20,"text":394,"correct":26},"工作分解结构",{"key":24,"text":396,"correct":22},"风险列表",{"key":28,"text":259,"correct":22},{"key":31,"text":399,"correct":22},"成分曲线",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},386125,"以下关于变更的描述正确的是（ ）",[404,406,408,410],{"key":20,"text":405,"correct":22},"只有在成本超支、进度滞后等负面因素出现时，才能提出变更",{"key":24,"text":407,"correct":22},"变更实施是为了对目前项目不好的情况提出整改措施，因此变更均是积极的",{"key":28,"text":409,"correct":22},"信息系统工程本身的特点决定了项目实施过程中提出的变更较少",{"key":31,"text":411,"correct":26},"变更可以是积极的也可以是消极的",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":31,"analysis":33},386126,"下列（ ）情况发生时，总监理工程师不需要签发“项目部分暂停令”。",[416,418,420,422],{"key":20,"text":417,"correct":22},"应承建单位的要求，项目需要暂停实施时",{"key":24,"text":419,"correct":22},"由于项目质量问题，必须进行停工处理时",{"key":28,"text":421,"correct":22},"发生必须暂停实施的紧急事件时",{"key":31,"text":423,"correct":26},"部分隐蔽工程施工人员变动",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},386127,"承建单位（ ）后，才能继续实施。",[428,430,432,434],{"key":20,"text":429,"correct":22},"提交复工申请后",{"key":24,"text":431,"correct":26},"在接到同意复工的指令后",{"key":28,"text":433,"correct":22},"召开会议进行讨论",{"key":31,"text":435,"correct":22},"提出整改措施后",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},386128,"合同变更特征不包括（ ）",[440,442,444,446],{"key":20,"text":441,"correct":22},"项目合同的双方当事人必须协商一致",{"key":24,"text":443,"correct":22},"改变合同的内容与标的",{"key":28,"text":445,"correct":22},"合同变更的法律后果是将产生新的债权和债务关系",{"key":31,"text":447,"correct":26},"合同已经签订后即可具备法律效益，不能改变",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},386129,"关于变更控制的描述，不正确的是（ ）。",[452,454,456,458],{"key":20,"text":453,"correct":22},"变更申请单位向监理工程师提出变更要求，提交书面工程变更建议书",{"key":24,"text":455,"correct":22},"工程变更建议书应在预计可能变更的时间之前14天提出",{"key":28,"text":457,"correct":22},"变更的合理性应考虑是否会影响工作范围、成本、质量和时间",{"key":31,"text":459,"correct":26},"项目监理无权驳回变更申请",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},386130,"关于变更流程说法错误的是（ ）",[464,466,468,470],{"key":20,"text":465,"correct":22},"第一步，相关方向监理工程师提出变更请求，提交书面项目变更申请书。",{"key":24,"text":467,"correct":26},"第二步，进行变更分析时，主要分析项目变化对项目预算、进度、资源配置的影响和冲击。",{"key":28,"text":469,"correct":22},"第二步，监理单位首先明确界定项目变更的目标，根据收集的信息判断变更的合理性和必要性，如果合理，进行变更分析。",{"key":31,"text":471,"correct":22},"第四步，三方进行协商讨论，根据变更分析结果，确定最优变更方案。",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},386131,"以下关于变更控制基本原则说法正确的是（ ）",[476,478,480,482],{"key":20,"text":477,"correct":26},"当变更申请提出时，应及时做出反应",{"key":24,"text":479,"correct":22},"变更的确认应得到监理的认可，认可后应严格按照变更流程来执行变更",{"key":28,"text":481,"correct":22},"承建单位以及建设单位都有权提出变更，监理单位主要负责对变更进行审核，而不是提出变更",{"key":31,"text":483,"correct":22},"变更申请提交之前应做好变更合理性、正确性的分析工作",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},386132,"影响工程变更的因素有很多，以下说法错误的是（ ）",[488,490,492,494],{"key":20,"text":489,"correct":26},"项目实施过程中，项目外部环境等因素的变动对项目工程不会造成影响",{"key":24,"text":491,"correct":22},"项目总体设计，项目需求分析不够周密详细，有一定的错误或者遗漏",{"key":28,"text":493,"correct":22},"新技术的出现或者设计人员提出了新的设计方案或者新的实现手段",{"key":31,"text":495,"correct":22},"建设单位由于机构重组等原因造成业务流程的变化",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":28,"analysis":33},386133,"以下关于工期延期管理说法错误的是（ ）",[500,502,504,506],{"key":20,"text":501,"correct":22},"非承建单位的责任使项目不能按原定工期开工",{"key":24,"text":503,"correct":22},"项目工作量变化和设计变更",{"key":28,"text":505,"correct":26},"非承建单位原因需要延期的，应经过监理单位同意工期相应顺延的其他情况",{"key":31,"text":507,"correct":22},"国家和地区有关部门正式发布的不可抗力事件",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},386134,"项目合同的变更给另一方当事人造成损失的，除依法可以免责的以外，应由（ ）负责赔偿。",[512,514,516,518],{"key":20,"text":513,"correct":26},"责任方",{"key":24,"text":515,"correct":22},"建设方",{"key":28,"text":517,"correct":22},"承建方",{"key":31,"text":519,"correct":22},"监理方",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":28,"analysis":33},386135,"如项目暂停是由于承建单位原因，承建单位在具备复工条件时，应填写（ ）报项目监理部审批，由总监理工程师签发审批意见；",[524,526,528,530],{"key":20,"text":525,"correct":22},"整改计划",{"key":24,"text":527,"correct":22},"变更申请",{"key":28,"text":529,"correct":26},"复工申请",{"key":31,"text":296,"correct":22},{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},386137,"根据《中华人民共和国合同法》，以下叙述不正确的是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"当事人采用合同书形式订立合同的，自双方当事人签字或者盖章时合同成立",{"key":24,"text":538,"correct":26},"只有书面形式的合同才受法律的保护",{"key":28,"text":540,"correct":22},"当事人采用信件、数据电文等形式订立合同的，可以在合同成立之前签订确认书，签订确认书时合同成立",{"key":31,"text":542,"correct":22},"当事人采用合同书形式订立合同的，双方当事人签字或者盖章的地点为合同成立的地点。",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":28,"analysis":33},386138,"关于合同索赔的描述，不正确的是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"合同索赔的依据是国家有关的法律、法规和项目所在地的地方法规等",{"key":24,"text":550,"correct":22},"合同索赔的依据是本项目的合同文件、合同履行过程中与索赔事件有关的凭证等",{"key":28,"text":552,"correct":26},"索赔是建设单位向承建单位提出的索赔",{"key":31,"text":554,"correct":22},"索赔是合同管理的重要环节，是合同方利益的体现",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":31,"analysis":33},386139,"索赔是合同管理的重要环节，以下说法错误的是（ ）",[559,561,563,565],{"key":20,"text":560,"correct":22},"索赔必须以合同为依据",{"key":24,"text":562,"correct":22},"必须注意资料的积累",{"key":28,"text":564,"correct":22},"及时、合理地处理索赔",{"key":31,"text":566,"correct":26},"加强索赔的事中事后性",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},386140,"合同的管理包括合同签订管理、合同履行管理、合同变更管理、合同档案管理、（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":26},"合同违约索赔管理",{"key":24,"text":574,"correct":22},"合同补充协议管理",{"key":28,"text":576,"correct":22},"合同审核",{"key":31,"text":578,"correct":22},"外包合同管理",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":31,"analysis":33},386141,"以下说法错误的是（ ）",[583,585,587,589],{"key":20,"text":584,"correct":22},"总价合同又称固定价格合同。固定价格合同是指在合同中确定一个完成工程的总价，承建单位据此完成项目全部内容的合同。",{"key":24,"text":586,"correct":22},"单价合同是承建单位在投标时按照招标文件就分部分项工程所列出的工程量表确定各分部分项工程费用的合同类型。",{"key":28,"text":588,"correct":22},"成本加酬金合同，是业主单位向承建单位支付建设工程项目的实际成本，并按事先约定的某一种方式支付酬金的合同类型。",{"key":31,"text":590,"correct":26},"成本加酬金合同，是业主单位向承建单位支付建设工程项目的实际成本，并根据后期项目时期情况来进行支付酬金的合同类型。",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":24,"analysis":33},386142,"以下（ ）不属于合同的内容",[595,597,599,601],{"key":20,"text":596,"correct":22},"项目的质量要求",{"key":24,"text":598,"correct":26},"项目的进度安排",{"key":28,"text":600,"correct":22},"项目的变更约定",{"key":31,"text":602,"correct":22},"项目的违约责任",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":31,"analysis":33},386143,"针对合同争议进行调解，以下说法错误的是（ ）",[607,609,611,613],{"key":20,"text":608,"correct":22},"双方达成仲裁协议，向约定的仲裁委员会申请仲裁。",{"key":24,"text":610,"correct":22},"向有管辖权的人民法院起诉。",{"key":28,"text":612,"correct":22},"当发生合同争议时，若选择了仲裁就不能再进行诉讼，只能选其一",{"key":31,"text":614,"correct":26},"当发生合同争议时，仲裁、诉讼可同时进行，以便合同争议可以快速解决",[616,620,623,626,629,632],{"id":617,"name":618,"category":7,"favorite":619},136,"法律职业试卷二(客观题 )",2,{"id":621,"name":622,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":624,"name":625,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":627,"name":628,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":630,"name":631,"category":7,"favorite":8},28,"安全工程师",{"id":633,"name":634,"category":7,"favorite":8},112,"安全生产法律知识"]