[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-386331":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},386331,167,1,"单选题","critical path for a project is the series of activities that determine（ ）by which the projectcan be completed. 项目的关键路径是确定 项目可以完成的一系列活动 A.the earliest time 最早完成时间 B.the latest time 最迟完成的时间",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","the total time",true,{"key":16,"text":17,"correct":18},"B","总时间",false,{"key":20,"text":21,"correct":18},"C","the free time",{"key":23,"text":24,"correct":18},"D","自由时间 .","关键路径通常由一系列决定项目工期的活动组成，它们决定了整个项目的最早完成时间。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 信息系统监理师","职业资格",0]