[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-386242":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},386242,167,1,"单选题","（ ）Estimating current project costs by analogy with similar projects。 （ ）是以类似的项目进行类比估计当期项目的费用。 A.Top-down estimating 自上而下估算法 B.Parametric model method 参数模型法",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","Bottom-up estimation metho",true,{"key":16,"text":17,"correct":18},"B","从下向上的估计法",false,{"key":20,"text":21,"correct":18},"C","Computing Tool Aided Method",{"key":23,"text":24,"correct":18},"D","计算工具辅助的方法","“自上而下估算法”。这种方法的基本操作步骤是：（1）监理项目组的高层次管理人员收集以往类似项目的有关历史资料；（2）会同有关成本方面的专家对当前项目的总成本进行估算；（3）将估算结果按照项目工作分解结构图的层次结构传递给下层的项目监理人员，在此基础上，他们对自己所负责的工作和活动的成本进行估计；（4）继续向下一层监理人员传递估计信息。从步骤可以看出，自上而下估算法，是依据类似项目，进行估算当期项目的费用。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 信息系统监理师","职业资格",0]