[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-386132":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},386132,167,1,"单选题","影响工程变更的因素有很多，以下说法错误的是（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目实施过程中，项目外部环境等因素的变动对项目工程不会造成影响",true,{"key":16,"text":17,"correct":18},"B","项目总体设计，项目需求分析不够周密详细，有一定的错误或者遗漏",false,{"key":20,"text":21,"correct":18},"C","新技术的出现或者设计人员提出了新的设计方案或者新的实现手段",{"key":23,"text":24,"correct":18},"D","建设单位由于机构重组等原因造成业务流程的变化","影响工程变更的主要因素主要包括：项目外部环境发生变化。例如，政府政策的变化项目总体设计，项目需求分析不够周密详细，有一定的错误或者遗漏新技术的出现或者设计人员提出了新的设计方案或者新的实现手段建设单位由于机构重组等原因造成业务流程的变化",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 信息系统监理师","职业资格",0]