[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-386126":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},386126,167,1,"单选题","下列（ ）情况发生时，总监理工程师不需要签发“项目部分暂停令”。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","应承建单位的要求，项目需要暂停实施时",false,{"key":16,"text":17,"correct":14},"B","由于项目质量问题，必须进行停工处理时",{"key":19,"text":20,"correct":14},"C","发生必须暂停实施的紧急事件时",{"key":22,"text":23,"correct":24},"D","部分隐蔽工程施工人员变动",true,"在制定施工方案时，承建单位就应对施工人员、施工方法等进行充分考虑，应做好人力、物力应急计划。如果只是进行人员更换、变动，不至于要求总监签发工程暂停令。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 信息系统监理师","职业资格",0]