[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-386101":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},386101,167,1,"单选题","关于质量控制点的设置，描述错误的是（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","选择的质量控制点应该突出重点",false,{"key":16,"text":17,"correct":14},"B","选择的质量控制点应该易于纠偏",{"key":19,"text":20,"correct":21},"C","保持控制点设置的稳定性和静态性",true,{"key":23,"text":24,"correct":14},"D","保持控制点设置的灵活性和动态性","质量控制点的设置原则：选择的质量控制点应该突出重点选择的质量控制点应该易于纠偏质量控制点设置要有利于参与工程建设的三方共同从事工程质量的控制活动保持控制点设置的灵活性和动态性",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 信息系统监理师","职业资格",0]