[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-166-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},166,"(中级) 信息系统管理工程师","职业资格",0,2,50,637,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,234,246,254,265,277,289,301,313,325,337,349,361,373,385,397,409,421,433,441,453,465,477,488,500,512,524,535,547,559,571,583,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},385377,1,"单选题","从生命周期的观点来看，无论硬件或软件，大致可分为规划和设计、开发（外购）和测试、实施、运营和终止等阶段。从时间角度来看，前三个阶段仅占生命周期的20%，其余80%的时间基本上是在运营。因此，如果整个IT运作管理做得不好，就无法获得前期投资的收益，IT系统不能达到它所预期的效果。为了改变这种现象，必须（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","不断购置硬件、网络和系统软件",false,{"key":24,"text":25,"correct":22},"B","引入IT财务管理",{"key":27,"text":28,"correct":29},"C","引入IT服务理念",true,{"key":31,"text":32,"correct":22},"D","引入服务级别管理","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},385378,"软件分发管理是基础架构管理的重要组成部分，可以提高IT维护的自动化水平，实现企业内部软件使用标准化，减少维护IT资源的费用。下列选项中，（ ）不属于软件分发管理工作内容。",[38,40,42,44],{"key":20,"text":39,"correct":22},"软件部署",{"key":24,"text":41,"correct":29},"编码与测试",{"key":27,"text":43,"correct":22},"安全补丁分发",{"key":31,"text":45,"correct":22},"远程管理和控制",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},385379,"分布式环境中的管理系统一般具有跨平台管理、可扩展性和灵活性、（ ）和智能代理技术等优越特性。",[50,52,54,56],{"key":20,"text":51,"correct":22},"可量化管理",{"key":24,"text":53,"correct":29},"可视化管理",{"key":27,"text":55,"correct":22},"性能监视管理",{"key":31,"text":57,"correct":22},"安全管理",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},385380,"在做好人力资源规划的基础上，__（ ）__是IT部门人力资源管理更为重要的任务。",[62,64,66,68],{"key":20,"text":63,"correct":22},"建立考核以及激励的机制",{"key":24,"text":65,"correct":22},"保障企业各IT活动的人员配备",{"key":27,"text":67,"correct":22},"IT部门负责人须加强自身学习，保障本部门员工的必要专业培训工作",{"key":31,"text":69,"correct":29},"建设IT人员教育与培训体系以及为员工制定职业生涯发展规划，让员工与IT部门和企业共同成长",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},385381,"代码结构中设置检验位是为了保证__（ ）__",[74,76,78,80],{"key":20,"text":75,"correct":22},"计算机内部运算不出错",{"key":24,"text":77,"correct":22},"代码的合理性",{"key":27,"text":79,"correct":29},"代码输入的正确性",{"key":31,"text":81,"correct":22},"代码的稳定性",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},385382,"在实际运用IT服务过程中，出现问题是无法避免的，因此需要对问题进行调查和分析。问题分析方法主要有Kepner&Tregoe法、（ ）与流程图法。",[86,88,90,92],{"key":20,"text":87,"correct":29},"鱼骨图法、头脑风暴法",{"key":24,"text":89,"correct":22},"成本控制法、鱼骨图法",{"key":27,"text":91,"correct":22},"KPI法、头脑风暴法",{"key":31,"text":93,"correct":22},"头脑风暴法、成本控制法",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},385383,"结构化开发中，数据流图是__（ ）__阶段产生的成果。",[98,100,102,104],{"key":20,"text":99,"correct":22},"总体设计",{"key":24,"text":101,"correct":22},"程序编码",{"key":27,"text":103,"correct":22},"详细设计",{"key":31,"text":105,"correct":29},"需求分析",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},385384,"以下关于项目的说法中，不正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"项目具有明确的目标",{"key":24,"text":113,"correct":22},"项目有特定的委托人",{"key":27,"text":115,"correct":22},"项目的实施是一次性的",{"key":31,"text":117,"correct":29},"项目的结果是可逆转的",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},385385,"软件项目管理是保证软件项目成功的重要手段，其中（ ）要确定哪些工作是项目应该做的，哪些工作不应包含在项目中。",[122,124,126,128],{"key":20,"text":123,"correct":22},"进度管理",{"key":24,"text":125,"correct":22},"风险管理",{"key":27,"text":127,"correct":29},"范围管理",{"key":31,"text":129,"correct":22},"配置管理",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},385386,"美国项目管理协会（PMI）开发的项目管理知识体系中，把信息系统中的项目管理划分为（ ）知识领域。①项目范围管理、项目进度管理、项目采购管理②项目成本管理、项目质量管理③项目人力资源管理、项目沟通管理④项目风险管理、项目综合管理",[134,136,138,140],{"key":20,"text":135,"correct":22},"①、③、④",{"key":24,"text":137,"correct":22},"①、②、③",{"key":27,"text":139,"correct":22},"②、③、④",{"key":31,"text":141,"correct":29},"①、②、③、④",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},385387,"信息系统项目是智力密集、劳动密集型项目，受人力资源影响最大，项目成员的结构、责任心、能力和__（ ）__对信息系统项目的质量以及是否成功有决定性的影响。",[146,148,150,152],{"key":20,"text":147,"correct":22},"单一性",{"key":24,"text":149,"correct":29},"稳定性",{"key":27,"text":151,"correct":22},"复杂性",{"key":31,"text":153,"correct":22},"重复性",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},385388,"下面说法不是项目基本特征的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"项目具有一次性",{"key":24,"text":161,"correct":22},"项目需要确定的资源",{"key":27,"text":163,"correct":22},"项目有一个明确目标",{"key":31,"text":165,"correct":29},"项目组织采用矩阵式管理",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},385389,"在开发人员编写程序时，程序的开始要用统一的格式，包含程序名称、程序功能、调用和被调用的程序、程序设计人等信息，体现了信息系统文档管理的（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":29},"文档书写规范",{"key":24,"text":173,"correct":22},"图表编写规则",{"key":27,"text":175,"correct":22},"文档目录编写标准",{"key":31,"text":177,"correct":22},"文档管理制度",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},385390,"信息系统项目生命周期模型中的（ ）适用于需求明确或团队具备行业经验，并开发过类似产品的项目。",[182,184,186,188],{"key":20,"text":183,"correct":29},"瀑布模型",{"key":24,"text":185,"correct":22},"V模型",{"key":27,"text":187,"correct":22},"螺旋模型",{"key":31,"text":189,"correct":22},"迭代模型",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},385391,"以下不属于信息系统项目管理工具的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"MicrosofiPtoject",{"key":24,"text":197,"correct":29},"PHP",{"key":27,"text":199,"correct":22},"P3E",{"key":31,"text":201,"correct":22},"ClearQuest",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},385393,"以下①~⑥中属于项目管理知识领域的是（ ）。①项目范围管理②项目时间管理③项目成本管理④项目质量管理⑤项目风险管理⑥项目采购管理",[206,208,210,212],{"key":20,"text":207,"correct":22},"①②③",{"key":24,"text":209,"correct":22},"①②③④",{"key":27,"text":211,"correct":22},"①②③④⑤",{"key":31,"text":213,"correct":29},"①②③④⑤⑥",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},385394,"以下不属于项目成本管理的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"资源计划",{"key":24,"text":221,"correct":22},"成本预算",{"key":27,"text":223,"correct":29},"质量保证",{"key":31,"text":225,"correct":22},"成本控制",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},385395,"（ ）清楚地描述了测试各阶段和开发各阶段的对应关系。",[230,231,232,233],{"key":20,"text":183,"correct":22},{"key":24,"text":189,"correct":22},{"key":27,"text":185,"correct":29},{"key":31,"text":187,"correct":22},{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},385396,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，链接顶点的边表示包含的活动，变色数字表示活动的持续时间（天）。完成该项目的最少时间为（请作答此空）天。由于某种原因，现在需要同一个开发人员完成BC和B D，则完成该项目的最少时间为（ ）天。",[238,240,242,244],{"key":20,"text":239,"correct":22},"11",{"key":24,"text":241,"correct":29},"18",{"key":27,"text":243,"correct":22},"20",{"key":31,"text":245,"correct":22},"21",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":27,"analysis":33},385397,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，链接顶点的边表示包含的活动，变色数字表示活动的持续时间（天）。完成该项目的最少时间为（ ）天。由于某种原因，现在需要同一个开发人员完成BC和B D，则完成该项目的最少时间为（请作答此空）天。",[250,251,252,253],{"key":20,"text":239,"correct":22},{"key":24,"text":241,"correct":22},{"key":27,"text":243,"correct":29},{"key":31,"text":245,"correct":22},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":31,"analysis":33},385398,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，边上的数字表示活动的持续时间（天），则完成该项目的最少时间为，（请作答此空）天。活动FG的松驰时间为（ ）天。",[258,259,261,263],{"key":20,"text":243,"correct":22},{"key":24,"text":260,"correct":22},"37",{"key":27,"text":262,"correct":22},"38",{"key":31,"text":264,"correct":29},"46",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":31,"analysis":33},385399,"风险管理根据风险评估的结果，从__（ ）__三个层面财务相应的安全控制措施。",[269,271,273,275],{"key":20,"text":270,"correct":22},"管理、组织与技术",{"key":24,"text":272,"correct":22},"策略、组织与技术",{"key":27,"text":274,"correct":22},"策略、管理与技术",{"key":31,"text":276,"correct":29},"管理、技术与运行",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":27,"analysis":33},385400,"应用软件开发项目执行过程中允许对需求进行适当修改，并对这种变更进行严格控制，充分体现了项目的（ ）特点。",[281,283,285,287],{"key":20,"text":282,"correct":22},"临时性",{"key":24,"text":284,"correct":22},"独特性",{"key":27,"text":286,"correct":29},"渐进明细",{"key":31,"text":288,"correct":22},"无形性",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":20,"analysis":33},385401,"关于项目招投标的说法，不正确的是（ ）。",[293,295,297,299],{"key":20,"text":294,"correct":29},"中标人确定后，招标人应当视情况向中标人发出中标通知书，将中标结果通知所有未中标的投标人",{"key":24,"text":296,"correct":22},"依法必须进行招标的项目。招标人应当自收到评标报告之日起3日内公示中标候选人",{"key":27,"text":298,"correct":22},"招标人在招标文件中要求投标人提交投标保证金的，投标保证金有效期应当与投标有效期一致",{"key":31,"text":300,"correct":22},"投标人少于3个的，不得开标；招标人应当重新招标",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":31,"analysis":33},385402,"信息系统项目的风险管理不包括（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":22},"风险识别",{"key":24,"text":308,"correct":22},"风险定性分析",{"key":27,"text":310,"correct":22},"风险响应计划",{"key":31,"text":312,"correct":29},"风险预警",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":24,"analysis":33},385404,"信息资源管理（IRM）工作层上最重要的角色是（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":22},"企业领导",{"key":24,"text":320,"correct":29},"数据管理员",{"key":27,"text":322,"correct":22},"数据处理人员",{"key":31,"text":324,"correct":22},"项目组组长",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":24,"analysis":33},385405,"一般来说，高层管理提出的决策问题与基层管理提出的决策问题相比，在结构化程度上__（ ）__",[329,331,333,335],{"key":20,"text":330,"correct":22},"高层管理提出的决策问题高于基层管理提出的决策问题",{"key":24,"text":332,"correct":29},"高层管理提出的决策问题低于基层管理提出的决策问题",{"key":27,"text":334,"correct":22},"两者提出的决策问题没有太大差别",{"key":31,"text":336,"correct":22},"高层管理部存在非结构化问题",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":31,"analysis":33},385406,"以下关于信息系统项目管理的说法中，不正确的是（ ）。",[341,343,345,347],{"key":20,"text":342,"correct":22},"项目管理需要专门的组织",{"key":24,"text":344,"correct":22},"项目管理具有创造性",{"key":27,"text":346,"correct":22},"项目负责人在管理中起重要作用",{"key":31,"text":348,"correct":29},"项目管理工作相对简单",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":31,"analysis":33},385407,"（ ）是类元之间的语义关系，其中的一个类元指定了由另一个类元保证执行的契约。",[353,355,357,359],{"key":20,"text":354,"correct":22},"依赖关系",{"key":24,"text":356,"correct":22},"关联关系",{"key":27,"text":358,"correct":22},"泛化关系",{"key":31,"text":360,"correct":29},"实现关系",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},385408,"确定存储信息的数据模型和所用数据库管理系统，应在（ ）。",[365,367,369,371],{"key":20,"text":366,"correct":22},"系统规划阶段",{"key":24,"text":368,"correct":29},"系统设计阶段",{"key":27,"text":370,"correct":22},"系统分析阶段",{"key":31,"text":372,"correct":22},"系统实施阶段",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},385409,"在决定管理信息系统应用项目之前，首先要做好系统开发的（ ）。",[377,379,381,383],{"key":20,"text":378,"correct":22},"详细调查工作",{"key":24,"text":380,"correct":29},"可行性分析",{"key":27,"text":382,"correct":22},"逻辑设计",{"key":31,"text":384,"correct":22},"物理设计",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":20,"analysis":33},385410,"企业信息资源管理不是把资源整合起来就行了，而是需要一个有效的信息资源管理体系，其中最为关键的是（ ）。",[389,391,393,395],{"key":20,"text":390,"correct":29},"从事信息资源管理的人才队伍建设",{"key":24,"text":392,"correct":22},"有效、强大的市场分析",{"key":27,"text":394,"correct":22},"准确地把握用户需求",{"key":31,"text":396,"correct":22},"信息资源的标准和规范",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":24,"analysis":33},385412,"软件开发过程中，常采用甘特（Gantt）图描述进度安排。甘特图以（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":22},"时间为横坐标、人员为纵坐标",{"key":24,"text":404,"correct":29},"时间为横坐标、任务为纵坐标",{"key":27,"text":406,"correct":22},"任务为横坐标、人员为纵坐标",{"key":31,"text":408,"correct":22},"人数为横坐标、时间为纵坐标",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},385413,"某企业通过对风险进行了识别和评估后，采用买保险来（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"避免风险",{"key":24,"text":416,"correct":22},"降低风险",{"key":27,"text":418,"correct":22},"接受风险",{"key":31,"text":420,"correct":29},"转嫁风险",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":27,"analysis":33},385414,"建立系统平台、培训管理人员及基础数据的准备等工作所属阶段为（ ）。",[425,427,429,431],{"key":20,"text":426,"correct":22},"系统分析",{"key":24,"text":428,"correct":22},"系统设计",{"key":27,"text":430,"correct":29},"系统实施",{"key":31,"text":432,"correct":22},"系统维护",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":31,"analysis":33},385415,"美国项目管理协会（PMI）开发的项目管理知识体系中，把信息系统中的项目管理划分为__（ ）__知识领域。①项目范围管理、项目进度管理、项目采购管理②项目成本管理、项目质量管理③项目人力资源管理、项目沟通管理④项目风险管理、项目综合管理",[437,438,439,440],{"key":20,"text":135,"correct":22},{"key":24,"text":137,"correct":22},{"key":27,"text":139,"correct":22},{"key":31,"text":141,"correct":29},{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},385416,"以下选项中，（ ）不属于项目人力资源管理。",[445,447,449,451],{"key":20,"text":446,"correct":22},"团队建设",{"key":24,"text":448,"correct":29},"工资发放",{"key":27,"text":450,"correct":22},"人员获得",{"key":31,"text":452,"correct":22},"组织计划",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":27,"analysis":33},385417,"关于项目招投标的描述，不正确的是：（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"招标人采用公开招标，应当发布招标公告",{"key":24,"text":460,"correct":22},"两个或两个以上法人或者其他组织可以组成一个联合体共同投标",{"key":27,"text":462,"correct":29},"招标人在招标文件中要求投标人提交投标保证金的，投标保证金有效期应长于投标有效期",{"key":31,"text":464,"correct":22},"评标委员会名单在中标结果确定前需保密",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},385418,"某工程由8个活动组成，其各活动情况如下表所示，该工程关键路径为（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"ABCEGI",{"key":24,"text":472,"correct":29},"ABCFHI",{"key":27,"text":474,"correct":22},"ABDHI",{"key":31,"text":476,"correct":22},"ABDI",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":27,"analysis":33},385419,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，边上的数字表示活动的持续时间（天），则完成该项目的最少时间为，（ ）天。活动FG的松驰时间为（请作答此空）天。",[481,483,485,486],{"key":20,"text":482,"correct":22},"9",{"key":24,"text":484,"correct":22},"10",{"key":27,"text":241,"correct":29},{"key":31,"text":487,"correct":22},"26",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},385420,"成本分类是指根据成本核算和成本管理的不同要求，将成本分成不同的类别。其中，项目团对差旅费、工资属于（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":29},"直接成本",{"key":24,"text":495,"correct":22},"沉没成本",{"key":27,"text":497,"correct":22},"固定成本",{"key":31,"text":499,"correct":22},"机会成本",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":27,"analysis":33},385421,"关于项目团队管理，不正确的是：（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"项目团队管理用于跟踪个人和团队的绩效，解决问题和协调变更",{"key":24,"text":507,"correct":22},"项目成员的工作风格差异是冲突的来源之一",{"key":27,"text":509,"correct":29},"在一个项目团队环境下，项目经理不应公开处理冲突",{"key":31,"text":511,"correct":22},"合作、强制、妥协、求同存异等是解决冲突的方法",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":27,"analysis":33},385422,"关于我国工业化和信息化的深度融合，不正确的是（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"工业化是信息化的基础，两者并举互动，共同发展",{"key":24,"text":519,"correct":22},"工业化为信息化的发展带来旺盛的市场需求",{"key":27,"text":521,"correct":29},"信息化是当务之急，可以减缓工业化，集中实现信息化",{"key":31,"text":523,"correct":22},"要抓住网络革命的机遇，通过信息化促进工业化",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},385423,"以下关于项目的说法中，不正确的是（ ）",[528,529,531,533],{"key":20,"text":111,"correct":22},{"key":24,"text":530,"correct":29},"项目的组织结构是封闭的",{"key":27,"text":532,"correct":22},"项目的生命期有限",{"key":31,"text":534,"correct":22},"项目具有不确定性",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":31,"analysis":33},385424,"以下关于进度管理工具甘特图的叙述中，不正确的是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"能清晰地表达每个任务的开始时间、结束时间和持续时间",{"key":24,"text":542,"correct":22},"能清晰地表达任务之间的并行关系",{"key":27,"text":544,"correct":22},"不能清晰地确定任务之间的依赖关系",{"key":31,"text":546,"correct":29},"能清晰地确定影响进度的关键任务",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},385426,"以下关于信息系统项目的说法中，不正确的是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":29},"信息系统项目的目标明确，任务边界清晰",{"key":24,"text":554,"correct":22},"信息系统开发过程中客户需求会随项目进展而变化",{"key":27,"text":556,"correct":22},"信息系统项目是智力密集、劳动密集型项目",{"key":31,"text":558,"correct":22},"项目成员结构、责任心和能力对信息系统项目的质量有决定性影响",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":31,"analysis":33},385427,"DDOS（Distributed Denial of Service）攻击的目的是（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"窃取账户",{"key":24,"text":566,"correct":22},"远程控制其他计算机",{"key":27,"text":568,"correct":22},"篡改网络上传输的信息",{"key":31,"text":570,"correct":29},"影响网络提供正常的服务",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":27,"analysis":33},385428,"与HTTP相比，HTTPS协议对传输的内容进行加密，更加安全。HTTPS基于（请作答此空）安全协议，其默认端口是（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":22},"RSA",{"key":24,"text":578,"correct":22},"DES",{"key":27,"text":580,"correct":29},"SSL",{"key":31,"text":582,"correct":22},"SSH",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":31,"analysis":33},385429,"计算机病毒的特征不包括（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":22},"传染性",{"key":24,"text":590,"correct":22},"触发性",{"key":27,"text":592,"correct":22},"隐蔽性",{"key":31,"text":594,"correct":29},"自毁性",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":24,"analysis":33},385430,"DES是一种（ ）加密算法，其密钥长度为56位，3DES是基于DES的加密方式，对明文进行3次DES操作，以提高加密强度，其密钥长度是（请作答此空）位",[599,601,603,605],{"key":20,"text":600,"correct":22},"56",{"key":24,"text":602,"correct":29},"112",{"key":27,"text":604,"correct":22},"128",{"key":31,"text":606,"correct":22},"168",[608,611,614,617,620,623],{"id":609,"name":610,"category":7,"favorite":9},136,"法律职业试卷二(客观题 )",{"id":612,"name":613,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":615,"name":616,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":618,"name":619,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":621,"name":622,"category":7,"favorite":8},28,"安全工程师",{"id":624,"name":625,"category":7,"favorite":8},112,"安全生产法律知识"]