[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-385395":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},385395,166,1,"单选题","（ ）清楚地描述了测试各阶段和开发各阶段的对应关系。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","瀑布模型",false,{"key":16,"text":17,"correct":14},"B","迭代模型",{"key":19,"text":20,"correct":21},"C","V模型",true,{"key":23,"text":24,"correct":14},"D","螺旋模型","V模型的左边下降的是开发过程各阶段，与此相对应的是右边上升的部分，即各测试过程的各个阶段。在不同的组织中对测试阶段的命名可能有所不同。在模型图中的开发阶段一侧，先从定义业务需求、需求确认或测试计划开始，然后要把这些需求转换到概要设计、概要设计的验证及测试计划，从概要设计进一步分解到详细设计、详细设计的验证及测试计划，最后进行开发，得到程序代码和代码测试计划。接着就是测试执行阶段一侧，执行先从单元测试开始，然后是集成测试、系统测试和验收测试。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 信息系统管理工程师","职业资格",0]