[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":598},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,9,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,212,224,236,248,257,267,279,291,301,313,325,337,349,361,373,385,397,409,420,428,437,447,459,470,481,493,505,516,528,540,552,564,576,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},384326,1,"单选题","（） 是承建方项目立项工作的第一步，其目的在于选择投资机会、鉴别投资方向。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","项目识别",true,{"key":24,"text":25,"correct":26},"B","项目论证",false,{"key":28,"text":29,"correct":26},"C","项目评估",{"key":31,"text":32,"correct":26},"D","投标","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},384327,"项目建议书是项目可行性研究的依据。 （ ） 一般不属于项目建议书的内容。",[38,40,42,44],{"key":20,"text":39,"correct":22},"设备选型",{"key":24,"text":41,"correct":26},"建设背景和必需的条件",{"key":28,"text":43,"correct":26},"市场规模预测",{"key":31,"text":45,"correct":26},"产品方案",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},384328,"项目论证是指对拟实施项目技术上的先进性、适用性，经济上的合理性、盈利性，实施上的可能性、风险可控性进行全面科学的综合分析，为项目决策提供客观依据的一种技术经济研究活动。以下关于项目论证的叙述，错误的是",[50,52,54,56],{"key":20,"text":51,"correct":26},"项目论证的作用之一是作为筹措资金、向银行贷款的依据",{"key":24,"text":53,"correct":26},"项目论证的内容之一是国民经济评价，通常运用影子价格、影子汇率、影子工资等工具或参数",{"key":28,"text":55,"correct":26},"数据资料是项目论证的支柱",{"key":31,"text":57,"correct":22},"项目财务评价是从项目的宏观角度判断项目或不同方案在财务上的可行性的技术经济活动",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},384329,"在利用招标方式选定项目承建方过程中，下列做法错误的是 （ ） 。",[62,64,66,68],{"key":20,"text":63,"correct":26},"中标人应最大限度地满足招标文件中规定的各项综合评价标准",{"key":24,"text":65,"correct":26},"招标人可以授权评标委员会直接确定中标人",{"key":28,"text":67,"correct":26},"中标人确定以后，招标人应向中标人发出中标通知书",{"key":31,"text":69,"correct":22},"招标人和中标人应当自中标通知书发出之日起15日内，订立书面合同",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},384330,"以下不属于项目可行性研究内容的是 （ ） 。",[74,76,78,80],{"key":20,"text":75,"correct":22},"项目的详细管理计划",{"key":24,"text":77,"correct":26},"项目的风险因素及其对策",{"key":28,"text":79,"correct":26},"项目的社会影响性分析",{"key":31,"text":81,"correct":26},"项目的财务盈利能力评价",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},384331,"某信息系统集成项目激励需要为项目采购硬件设备，那么项目经理需要在 （ ） 中对该采购物品进行描述。",[86,88,90,92],{"key":20,"text":87,"correct":26},"建议邀请书",{"key":24,"text":89,"correct":26},"合同",{"key":28,"text":91,"correct":26},"合同范围说明书",{"key":31,"text":93,"correct":22},"项目工作说明书",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},384332,"某地方政府策划开展一项大型电子政务建设项目，项目建设方在可行性研究的基础上开展项目评估，以下做法不正确的是 （ ） 。",[98,100,102,104],{"key":20,"text":99,"correct":22},"项目建设方的相关领导和业界专家，根据国家颁布的政策、法规、方法、参数和条例等，进行项目评估",{"key":24,"text":101,"correct":26},"从项目、国民经济、社会角度出发，对拟建项目建设的必要性、建设条件、生产条件、产品市场需求、工程技术、经济效益和社会效益等进行评价、分析和论证，进而判断其是否可行",{"key":28,"text":103,"correct":26},"项目评估按照成立评估小组、制定评估计划、开展调查研究、分析与评估、编写评估报告的程序开展",{"key":31,"text":105,"correct":26},"评估工作采用费用效益分析法，比较为项目所支出的社会费用和项目对社会所提供的效益，评估项目建成后将对社会做出的贡献程度",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},384333,"乙公司参加一个网络项目的投标，为增加中标的可能性，乙公司决定将招标文件中的一些次要项目（约占总金额的3%）作为可选项目，没有计算到投标总价中，而是另作为一张可选价格表，由招标方选择是否需要，评标时，评委未计算可选价格部分，这样乙公司因报价低而中标。洽谈合同时，甲方提出乙方所说的可选项目是必需的，在招标文件中已明确说明，要求乙方免费完成，乙方以投标文件中有说明为由不同意免费，该项目最可能的结果是 （ ）",[110,112,114,116],{"key":20,"text":111,"correct":26},"甲方追加经费",{"key":24,"text":113,"correct":22},"重新招标",{"key":28,"text":115,"correct":26},"甲方不追加经费，相应部分取消",{"key":31,"text":117,"correct":26},"重新确定中标方",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},384334,"项目建议书应该包括的核心内容可不包括 （） 。",[122,124,126,128],{"key":20,"text":123,"correct":26},"项目的必要性",{"key":24,"text":125,"correct":26},"项目建设的必需条件",{"key":28,"text":127,"correct":22},"项目技术方案",{"key":31,"text":129,"correct":26},"项目的市场预测",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},384335,"某招标文件包括：招标项目的技术要求、投标人员资格审查标准、投标报价要求、评标标准。该招标文件还缺少（）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"评标组构成",{"key":24,"text":137,"correct":22},"拟签订合同的主要条款",{"key":28,"text":139,"correct":26},"特定的生产供应者",{"key":31,"text":141,"correct":26},"是否要求投标人组成联合体共同投标",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},384336,"可行性研究主要从 （ ） 等方面进行研究。",[146,148,150,152],{"key":20,"text":147,"correct":22},"技术可行性，经济可行性，操作可行性",{"key":24,"text":149,"correct":26},"技术可行性，经济可行性，系统可行性",{"key":28,"text":151,"correct":26},"经济可行性，系统可行性，操作可行性",{"key":31,"text":153,"correct":26},"经济可行性，系统可行性，时间可行性",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},384337,"建设方在进行项目评估的时候，根据项目的类型不同，所采用的评估方法也不同。如果使用总量评估法，其难点是()",[158,160,162,164],{"key":20,"text":159,"correct":26},"如何准确确定新增投入资金的经济效果",{"key":24,"text":161,"correct":22},"确定原有固定资产重估值",{"key":28,"text":163,"correct":26},"评价追加投资的经济效果",{"key":31,"text":165,"correct":26},"确定原有固定资产对项目的影响",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},384338,"承建方在进行项目论证时，论证的内容不包括（）",[170,172,174,176],{"key":20,"text":171,"correct":26},"承建方技术可行性分析",{"key":24,"text":173,"correct":26},"承建方人力及其他资源配置能力可行性分析",{"key":28,"text":175,"correct":26},"项目财务可行性分析",{"key":31,"text":177,"correct":22},"项目国民经济评价分析",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},384339,"项目论证是确定项目是否实施的依据，实施便利不属于项目建设方项目论证的原则。()不属于项目建设方项目论证的内容。",[182,184,186,188],{"key":20,"text":183,"correct":22},"招标文件的编制",{"key":24,"text":185,"correct":26},"项目组织设置的合理性",{"key":28,"text":187,"correct":26},"资金筹措的依据",{"key":31,"text":189,"correct":26},"项目的工艺技术",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},384340,"（）不属于项目建设方项目论证的原则。",[194,196,198,200],{"key":20,"text":195,"correct":26},"加强科学的预测工作",{"key":24,"text":197,"correct":26},"微观经济效果与宏观经济效果相结合",{"key":28,"text":199,"correct":26},"近期经济效果与远期经济效率相结合",{"key":31,"text":201,"correct":22},"科学的实施方案设计",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},384341,"项目承建方的项目论证需要从五个方面展开，其中不包括 （ ） 。",[206,207,208,210],{"key":20,"text":171,"correct":26},{"key":24,"text":173,"correct":26},{"key":28,"text":209,"correct":22},"承建方综合能力分析",{"key":31,"text":211,"correct":26},"项目财务可行性分析和项目风险分析",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},384342,"项目可行性研究的目的是对拟建设的项目从技术、经济、工程等会方面进行调查研究和分析比较，提出是否投资和如何建设的相关意见，形成《可行性研究报告》。为项目决策提供依据。较完整的项目可行性研究的步骤依次是（）",[216,218,220,222],{"key":20,"text":217,"correct":22},"立项申请、初步可行性研究、详细可行性研究、项目论证、项目评估。",{"key":24,"text":219,"correct":26},"立项申请、项目论证、项目评估、初步可行性研究、详细可行性研究。",{"key":28,"text":221,"correct":26},"项目建议书的编制、项目论证、项目评估、可行性研究",{"key":31,"text":223,"correct":26},"项目建议书的编制、项目论证、项目评估、可行性研究报告的编制、提交及审批",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":28,"analysis":33},384343,"某项目的立项负责人编制了一份某软件开发项目的详细可行性 研究报告, 目录如下:①概述 ②需求确定 ③现有资源 ④技术方案⑤进度计划 ⑥项目组织 ⑦效益分析 ⑧协作方式 ⑨结论。该报告中 欠缺的必要内容是( )",[228,230,232,234],{"key":20,"text":229,"correct":26},"应用方案",{"key":24,"text":231,"correct":26},"质量计划",{"key":28,"text":233,"correct":22},"投资估算",{"key":31,"text":235,"correct":26},"项目评估原则",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":28,"analysis":33},384344,"某系统集成商准备去投标一个政府网站开发项目，该系统集成商 在项目招投标阶段的工作依次是( )。 ①组建评标小组 ②编制投标文件中 ③参写开标过程 ④研读招标公 告 ⑤提交投标文件",[240,242,244,246],{"key":20,"text":241,"correct":26},"①②③④⑤",{"key":24,"text":243,"correct":26},"⑤②④③",{"key":28,"text":245,"correct":22},"④②⑤③",{"key":31,"text":247,"correct":26},"①④⑤②③",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":31,"analysis":33},384345,"承建方在进行项目论证时，论证的内容不包括 （ ） 。",[252,254,255,256],{"key":20,"text":253,"correct":26},"承建方技术的可行性分析",{"key":24,"text":173,"correct":26},{"key":28,"text":175,"correct":26},{"key":31,"text":177,"correct":22},{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":31,"analysis":33},384346,"下列选项中，不属于项目建议书核心内容的是（）。",[261,262,263,265],{"key":20,"text":123,"correct":26},{"key":24,"text":129,"correct":26},{"key":28,"text":264,"correct":26},"产品方案或服务的市场预测",{"key":31,"text":266,"correct":22},"风险因素及对策",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":28,"analysis":33},384347,"某公司承担了一项系统集成项目，正在开发项目适用的软件系统，但是需要从其他公司购买一些硬件设备。该公司的转包合同负责人应当首先准备一份 （ ） 。",[271,273,275,277],{"key":20,"text":272,"correct":26},"项目章程",{"key":24,"text":274,"correct":26},"项目范围说明书",{"key":28,"text":276,"correct":22},"工作说明书",{"key":31,"text":278,"correct":26},"外包合同",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":31,"analysis":33},384348,"项目详细可行性分析有一种方法，将有项目时的成本（效益）与无项目时的成本（效益）进行比较，求得两者差额。这种分析方法称之为（） 。",[283,285,287,289],{"key":20,"text":284,"correct":26},"经济评价法",{"key":24,"text":286,"correct":26},"市场预测法",{"key":28,"text":288,"correct":26},"投资估算法",{"key":31,"text":290,"correct":22},"有无比较法",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":31,"analysis":33},384349,"某工程人员在项目建议书中提到该项目符合国家产业政策和投资方向，符合地方计划发展规划。这部分内容对（）进行了论述。",[295,296,297,299],{"key":20,"text":123,"correct":26},{"key":24,"text":129,"correct":26},{"key":28,"text":298,"correct":26},"项目的盈利预期",{"key":31,"text":300,"correct":22},"项目建设必需的条件",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":28,"analysis":33},384350,"以下关于投标文件送达的叙述，（）是错误的。",[305,307,309,311],{"key":20,"text":306,"correct":26},"投标人必须按照招标文件规定的地点、在规定的时间内送达投标文件",{"key":24,"text":308,"correct":26},"投递投标书的方式最好是直接送达或委托代理人送达，以便获得招标机构已收到投标书的回执",{"key":28,"text":310,"correct":22},"如果以邮寄方式送达的，投标人应保证投标文件能够在截止日期之前投递即可",{"key":31,"text":312,"correct":26},"招标人收到标书以后应当签收，在开标前不得开启",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":28,"analysis":33},384351,"下列说法不正确的是（）。",[317,319,321,323],{"key":20,"text":318,"correct":26},"招标投标法规定招标方式分为公开招标和邀请招标两类",{"key":24,"text":320,"correct":26},"只有不属于法规规定必须招标的项目才可以采用直接委托方式",{"key":28,"text":322,"correct":22},"建设行政主管部门派人参加开标、评标，定标的活动，监督招标按法定程序选择中标人；所派人员可作为评标委员会的成员，但不得以任何形式影响或干涉招标人依法选择中标人的活动",{"key":31,"text":324,"correct":26},"比较而言公开招标的评标工作量较大，所需招标时间长，费用高",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":20,"analysis":33},384352,"项目承建方在投标前一般也需要进行项目论证，主要是从技术可行性、人力及其他资源可行性、财务可行性、（）。以及对其他参与竞争投标方情况分析等方面进行论证。",[329,331,333,335],{"key":20,"text":330,"correct":22},"项目风险分析",{"key":24,"text":332,"correct":26},"项目的社会影响分析",{"key":28,"text":334,"correct":26},"项目的国民经济分析",{"key":31,"text":336,"correct":26},"项目的运行环境分析",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":20,"analysis":33},384353,"某单位为加强项目管理，计划在 2013 年建设一个项目管理系统，但企业领导对该系统没有提出具体要求。 如果钱工对比了自主开发和外购的成本、时间差异，该行为属于 （ ） 。",[341,343,345,347],{"key":20,"text":342,"correct":22},"项目的财务评价",{"key":24,"text":344,"correct":26},"项目的总量评估",{"key":28,"text":346,"correct":26},"项目的技术方案评估",{"key":31,"text":348,"correct":26},"项目的国民经济评价",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":20,"analysis":33},384354,"状态会议的目的是（ ）",[353,355,357,359],{"key":20,"text":354,"correct":22},"交换项目信息",{"key":24,"text":356,"correct":26},"让团队成员汇报正在执行的工作",{"key":28,"text":358,"correct":26},"签发工作授权",{"key":31,"text":360,"correct":26},"确认团队提交的成本的准确性",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":31,"analysis":33},384355,"项目初步可行性研究关注的一般问题为 （ ） 。",[365,367,369,371],{"key":20,"text":366,"correct":26},"合作方式",{"key":24,"text":368,"correct":26},"项目进度安排",{"key":28,"text":370,"correct":26},"技术合作计划",{"key":31,"text":372,"correct":22},"投资与成本估算",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},384356,"项目工作说明书是对项目提供的产品、成果或服务的描述，其内容一般不包括（ ） 。",[377,379,381,383],{"key":20,"text":378,"correct":26},"服务人员",{"key":24,"text":380,"correct":22},"技术方案选择",{"key":28,"text":382,"correct":26},"验收标准",{"key":31,"text":384,"correct":26},"收费及付款方式",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":31,"analysis":33},384357,"某企业信息化建设过程中，决策层要对实施计划方案进行择优和取舍，为保证决策的科学性，其主要决策依据是()",[389,391,393,395],{"key":20,"text":390,"correct":26},"需求分析",{"key":24,"text":392,"correct":26},"项目建议书",{"key":28,"text":394,"correct":26},"可行性研究报告",{"key":31,"text":396,"correct":22},"项目评估报告",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":24,"analysis":33},384358,"小王作为某项目的项目经理,决定采用投标人会议的方式选择卖 方。以下做法中,正确的是：( )。",[401,403,405,407],{"key":20,"text":402,"correct":26},"限制参会者提问的次数，防止少数人问太多的问题",{"key":24,"text":404,"correct":22},"防止参会者私下提问",{"key":28,"text":406,"correct":26},"小王不需要参加投标人会议,只需采购管理员参加即可",{"key":31,"text":408,"correct":26},"设法获得每个参会者的机密信息",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},384359,"投标人会议是在 （ ） 过程中采用的一种方法。",[413,415,417,419],{"key":20,"text":414,"correct":26},"开标",{"key":24,"text":416,"correct":22},"询价",{"key":28,"text":418,"correct":26},"评标",{"key":31,"text":32,"correct":26},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":20,"analysis":33},384360,"项目建议书是项目可行性研究的依据，()一般不属于项目建议书的内容。",[424,425,426,427],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":26},{"key":28,"text":43,"correct":26},{"key":31,"text":45,"correct":26},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":28,"analysis":33},384361,"()是承建方项目立项的第一步，其目的在于选择投资机会、鉴别投资方向。",[432,433,434,435],{"key":20,"text":25,"correct":26},{"key":24,"text":29,"correct":26},{"key":28,"text":21,"correct":22},{"key":31,"text":436,"correct":26},"项目可行性分析",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},384362,"项目承建方在准备投标时，要基于自身情况对准备投标的项目进行论证，其中论证的内容可不包括（）。",[441,443,444,446],{"key":20,"text":442,"correct":22},"建设方需求的合理性分析",{"key":24,"text":330,"correct":26},{"key":28,"text":445,"correct":26},"其他投标者情况分析",{"key":31,"text":171,"correct":26},{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":31,"analysis":33},384363,"项目章程发布的目标一般不包括 （ ）",[451,453,455,457],{"key":20,"text":452,"correct":26},"使项目与组织的日常经营联系起来",{"key":24,"text":454,"correct":26},"进一步确定客户的商业需求，以及对客户需求的理解",{"key":28,"text":456,"correct":26},"为项目经理使用组织资源进行项目活动进行授权",{"key":31,"text":458,"correct":22},"确认项目团队成员的具体任务分工",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":31,"analysis":33},384364,"项目经理张工带领团队编制项目管理计划，（ ）不属于编制项目管理计划过程的依据。",[463,464,466,468],{"key":20,"text":272,"correct":26},{"key":24,"text":465,"correct":26},"事业环境因素",{"key":28,"text":467,"correct":26},"组织过程资产",{"key":31,"text":469,"correct":22},"工作分解结构",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},384365,"攻克要塞团队正在启动一个新的课程管理项目，任命刘某为项目负责人，并抽调各部门骨干组成项目团队。刘某认为各部门骨干，仍然会以部门利益为重，会对项目经理的安排置若罔闻，因此希望公司高层发布一份（） 。",[474,476,478,479],{"key":20,"text":475,"correct":26},"人力资源管理计划",{"key":24,"text":477,"correct":26},"项目管理计划",{"key":28,"text":272,"correct":22},{"key":31,"text":480,"correct":26},"沟通管理计划",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":31,"analysis":33},384366,"发布项目章程，标志着项目的正式启动。以下围绕项目章程的叙述中， （ ） 是不正确的。",[485,487,489,491],{"key":20,"text":486,"correct":26},"制定项目章程的工具和技术包括专家判断",{"key":24,"text":488,"correct":26},"项目章程要为项目经理提供授权，方便其使用组织资源进行项目活动",{"key":28,"text":490,"correct":26},"项目章程应当由项目发起人发布",{"key":31,"text":492,"correct":22},"项目经理应在制定项目章程后再任命",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},384367,"整体变更控制过程实际上是对 （） 的变更进行标识、文档化、批准或拒绝，并控制的过程。",[497,499,501,503],{"key":20,"text":498,"correct":26},"详细的WBS计划",{"key":24,"text":500,"correct":22},"项目基准",{"key":28,"text":502,"correct":26},"项目预算",{"key":31,"text":504,"correct":26},"明确的项目组织结构",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":20,"analysis":33},384368,"( )不属于项目章程的内容。",[509,510,512,514],{"key":20,"text":93,"correct":22},{"key":24,"text":511,"correct":26},"项目的主要风险",{"key":28,"text":513,"correct":26},"里程碑进度计划",{"key":31,"text":515,"correct":26},"可测量的项目目标和相关的成功标准",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":20,"analysis":33},384369,"项目章程的作用中,不包括:( )。",[520,522,524,526],{"key":20,"text":521,"correct":22},"为项目人员绩效考核提供依据",{"key":24,"text":523,"correct":26},"确定项目经理,规定项目经理的权力",{"key":28,"text":525,"correct":26},"规定项目的总体目标",{"key":31,"text":527,"correct":26},"正式确认项目的存在",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},384370,"小王正在负责为一家水厂开发MIS系统，虽然他没有管理类似项目的经验，但其团队的一名成员做过类似的项目。该成员的这些经历为准确估算项目的成本做出了贡献，这一点对实现赢利很有帮助。上述情况表明 （ ） 。",[532,534,536,538],{"key":20,"text":533,"correct":26},"专业成本建议总是需要的",{"key":24,"text":535,"correct":22},"团队里每个项目干系人都可能具有对制订项目管理计划有用的技能和知识",{"key":28,"text":537,"correct":26},"参数模型应该与专家的判断一起用，作为一次性付款合同理想的成本估计方法",{"key":31,"text":539,"correct":26},"一个人要提供精确的信息，并不一定要知道当地的环境等情况",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":20,"analysis":33},384371,"在项目计划阶段，项目计划方法论是用来指导项目团队制定项目计划的一种结构化方法。()属于方法论的一部分",[544,546,548,550],{"key":20,"text":545,"correct":22},"标准格式和模板",{"key":24,"text":547,"correct":26},"上层管理者的介入",{"key":28,"text":549,"correct":26},"职能工作的授权",{"key":31,"text":551,"correct":26},"项目干系人的技能",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":31,"analysis":33},384372,"在进行项目整体变更控制过程中，首先要受理变更申请，接下来 （ ） 。",[556,558,560,562],{"key":20,"text":557,"correct":26},"接受或拒绝变更",{"key":24,"text":559,"correct":26},"执行变更",{"key":28,"text":561,"correct":26},"进行变更结果追踪与审核",{"key":31,"text":563,"correct":22},"进行变更的整体影响分析",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":28,"analysis":33},384373,"以下关于项目章程的叙述中， （ ） 是正确的。",[568,570,572,574],{"key":20,"text":569,"correct":26},"项目章程应当由项目经理主持发布",{"key":24,"text":571,"correct":26},"项目章程中应明确客户的详细需求，不能直接引用合同或工作说明书中的内容",{"key":28,"text":573,"correct":22},"项目章程中可以给出概要的里程进度计划，详细的进度计划可在项目计划阶段再进行制定",{"key":31,"text":575,"correct":26},"项目经理应由公司专门发布文件进行任命，不应写入项目章程",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":28,"analysis":33},384374,"攻克要塞团队需要升级师资管理系统，并任命老徐为项目经理。老徐在编制项目管理计划时，应 （） 。",[580,582,584,586],{"key":20,"text":581,"correct":26},"尽量简化编写项目管理计划",{"key":24,"text":583,"correct":26},"尽量详细编写项目管理计划",{"key":28,"text":585,"correct":22},"先编写粗略的项目管理计划，之后不断细化",{"key":31,"text":587,"correct":26},"制定的项目管理计划能贯穿项目始终，而不变化",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":20,"analysis":33},384375,"（） 是正式批准一个项目的文档，或者是批准现行项目是否进入下一阶段的文档",[592,593,595,597],{"key":20,"text":272,"correct":22},{"key":24,"text":594,"correct":26},"项目合同",{"key":28,"text":596,"correct":26},"项目启动文档",{"key":31,"text":93,"correct":26},[599,603,606,609,612,615],{"id":600,"name":601,"category":7,"favorite":602},136,"法律职业试卷二(客观题 )",2,{"id":604,"name":605,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":607,"name":608,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":610,"name":611,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":613,"name":614,"category":7,"favorite":8},28,"安全工程师",{"id":616,"name":617,"category":7,"favorite":8},112,"安全生产法律知识"]