[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,6,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,213,225,237,249,261,273,285,297,309,321,333,345,357,369,379,391,403,415,427,439,451,462,474,486,497,509,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},384176,1,"单选题","需要进行发布信息的时候，可以采用的信息传递方式是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","征询和讨论",false,{"key":24,"text":25,"correct":26},"B","推销和叙述",true,{"key":28,"text":29,"correct":22},"C","征询和叙述",{"key":31,"text":32,"correct":22},"D","讨论和推销","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},384177,"合同索赔是合同管理的一项重要内容，合同索赔流程的正确步骤是（ ）1.发出索赔通知书2.监理工程师答复3.提交索赔材料4.索赔认可5.提交索赔报告",[38,40,42,44],{"key":20,"text":39,"correct":22},"12354",{"key":24,"text":41,"correct":22},"21354",{"key":28,"text":43,"correct":26},"13245",{"key":31,"text":45,"correct":22},"32145",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},384178,"甲乙双方订立合同，规定甲应予2007年8月1日交货，乙应予同年8月7日付款，月底，甲发现乙财产状况恶化，已没有支付货款的能力，并有确切证据，甲提出终止合同，但乙未允。基于上述情况，甲于8月1日未按约定交货，依照合同法的原则。下列关于甲行为的论述中，正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"甲必须按合同约定交货，但可以要求乙提供相应的担保",{"key":24,"text":53,"correct":26},"甲有权不按合同约定交货，除非乙提供了相应的担保",{"key":28,"text":55,"correct":22},"甲必须按合同约定交货，但可以仅先交付部分货物",{"key":31,"text":57,"correct":22},"甲应按合同约定交货，如乙不支付货款可追究其违约责任",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},384179,"某通信设备采购项目，签订合同后进入了合同履行阶段，以下（ ）做法是不合理的",[62,64,66,68],{"key":20,"text":63,"correct":22},"合同履行过程中发现处于支付的通信设备的质量及验收要求约定不明确，双方进行商议后以补充协议进行了规定",{"key":24,"text":65,"correct":22},"由于采购方不具备接收通信设备的条件，要求供货方延迟货物的交付，到了实际交付时，由于该通信设备的价格涨价，供货方要求变更合同价格",{"key":28,"text":67,"correct":26},"通信设备在运输至采购方的过程中，遇到了连续的暴雨天气无法按时交付，采购方认为合同中没有对应的免责条款，对供货方进行经济索赔",{"key":31,"text":69,"correct":22},"合同双方在履行过程中产生了纠纷，双方无法协调一致，因此向仲裁机构提出了仲裁申请。",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},384180,"按照信息系统范围划分的合同分类不包括（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"总承包合同",{"key":24,"text":77,"correct":22},"单项工程承包合同",{"key":28,"text":79,"correct":22},"分包合同",{"key":31,"text":81,"correct":26},"总分包合同",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},384181,"合同内容是当事人订立合同时的各项合同条款。合同的主要内容包括（ ）。①当事人各自的权利、义务②项目费用及工程款的支付方式③项目变更约定④违约责任⑤保密约定",[86,88,90,92],{"key":20,"text":87,"correct":22},"①②④",{"key":24,"text":89,"correct":26},"①②③④⑤",{"key":28,"text":91,"correct":22},"①②③⑤",{"key":31,"text":93,"correct":22},"②③④",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},384182,"下列不属于有效合同的特点的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"签订合同的当事人应当具有相应民事权利能力和民事行为能力",{"key":24,"text":101,"correct":26},"合同双方签名在当事人授权的情况下可以代签",{"key":28,"text":103,"correct":22},"意思表示真实",{"key":31,"text":105,"correct":22},"不违反法律或社会公共利益",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},384183,"某电信企业要建设一个CRM系统（包括呼叫中心和客服中心），系统集成一级资质企业甲和系统集成二级资质企业乙参与该系统建设。关于合同的签订，下面说法中，（ ）是正确的。",[110,112,114,116],{"key":20,"text":111,"correct":26},"如电信企业和乙签订CRM建设总包合同，则乙和甲就呼叫中心的建设只能签订分包合同",{"key":24,"text":113,"correct":22},"如电信企业和乙签订客服中心建设总包合同，则电信企业和甲就CRM的建设只能签订总价合同",{"key":28,"text":115,"correct":22},"如电信企业和乙签订客服中心建设单项承包合同，则电信企业和甲就CRM的建设只能签订单项承包合同",{"key":31,"text":117,"correct":22},"如果电信企业和甲签订CRM建设总价合同，则甲和乙就呼叫中心的建设只能签订单价合同",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},384184,"按照我国建设部、财政部下达的通用条款，下列关于索赔的说法错误的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"索赔必须以合同为依据",{"key":24,"text":125,"correct":22},"索赔必须注意资料的积累",{"key":28,"text":127,"correct":26},"索赔是一种惩罚行为",{"key":31,"text":129,"correct":22},"索赔处理要及时、合理",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},384185,"下列不属于合同索赔依据的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"国家有关法律如《合同法》、行政法规和地方法规。",{"key":24,"text":137,"correct":22},"国家、部门和地方有关信息系统工程的标准、规范和文件。",{"key":28,"text":139,"correct":26},"合同一方或双方存在违约行为和事实。",{"key":31,"text":141,"correct":22},"本项目的实施合同文件，包括招标文件、合同文件及附件。",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},384186,"签订信息系统工程项目合同时有需要注意事项。下列选项中（ ）在合同签订时不要考虑。",[146,148,150,152],{"key":20,"text":147,"correct":22},"当事人的法律资格",{"key":24,"text":149,"correct":22},"验收标准",{"key":28,"text":151,"correct":26},"项目管理计划",{"key":31,"text":153,"correct":22},"技术支持服务",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},384187,"项目发生索赔事件后，一般先由（ ）依据合同进行调解",[158,160,162,164],{"key":20,"text":159,"correct":22},"政府行政主管部门",{"key":24,"text":161,"correct":26},"监理工程师",{"key":28,"text":163,"correct":22},"仲裁委员会",{"key":31,"text":165,"correct":22},"项目经理",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},384188,"能够使建设单位在评标时易于报价最低的承包商，易于进行支付计算的合同是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"工料合同",{"key":24,"text":173,"correct":22},"成本补偿合同",{"key":28,"text":175,"correct":26},"总价合同",{"key":31,"text":177,"correct":22},"分部分项合同",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},384189,"在合同谈判前，要制定切合实际的谈判目标，要抓住实质问题，要营造一个平等协商的氛围，这些工作在合同管理中属于（ ）管理。",[182,184,186,188],{"key":20,"text":183,"correct":26},"合同签订",{"key":24,"text":185,"correct":22},"合同履行",{"key":28,"text":187,"correct":22},"合同变更",{"key":31,"text":189,"correct":22},"合同档案",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},384190,"某公司按总价合同方式约定订购3000米高规格的铜缆，由于建设单位原因，工期暂停了半个月，待恢复施工后，承建单位以近期铜价上涨为理由，要求建设单位赔偿购买电缆增加的费用，并要求适当延长工期，以下说法中，（ ）是正确的。",[194,196,198,200],{"key":20,"text":195,"correct":22},"建设单位应该赔偿承建单位采购电缆增加的费用",{"key":24,"text":197,"correct":22},"监理单位应该保护承建单位的合法利益，因此应该支持承建单位的索赔要求",{"key":28,"text":199,"correct":22},"索赔是合同双方利益的体现，可以使项目造价更趋于合理",{"key":31,"text":201,"correct":26},"铜价上涨是承建单位应承担的项目风险，不应该要求赔偿费用",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},384191,"下面关于索赔的说法中，不正确的是（ ）。",[206,208,210,211],{"key":20,"text":207,"correct":22},"按照索赔的目的进行划分，索赔可以分为工期索赔和费用索赔",{"key":24,"text":209,"correct":26},"项目发生索赔事件后，应先由监理工程师调解，若调解不成，则须由政府建设主管机构进行调解或仲载后，方可向所在地人民法院起诉",{"key":28,"text":123,"correct":22},{"key":31,"text":212,"correct":22},"索赔的重要前提条件是合同一方或双方存在违约行为和事实，并且由此造成损失，责任应由对方承担",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},384192,"下列不属于合同管理的作用的是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":26},"合同保证了承建方的实际工作满足合同要求的过程。",{"key":24,"text":220,"correct":22},"合同确定了信息系统实施和管理的主要目标，是合同双方在工程中各个经济活动的依据。",{"key":28,"text":222,"correct":22},"合同规定了双方的经济关系，包括实施过程中的经济责任、利益和权利。",{"key":31,"text":224,"correct":22},"合同是监理的基本依据，利用合同可以对工程进度、质量和成本实施管理和控制。",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":20,"analysis":33},384193,"索赔是合同管理中经常会碰到的问题，以下关于索赔管理的描述中，（ ）是正确的。",[229,231,233,235],{"key":20,"text":230,"correct":26},"一方或双方存在违约行为和事实是合同索赔的前提",{"key":24,"text":232,"correct":22},"凡是遇到客观原因造成的损失，承包商都可以申请费用补偿",{"key":28,"text":234,"correct":22},"索赔是对对方违约行为的一种惩罚",{"key":31,"text":236,"correct":22},"承建方应该将索赔通知书直接递交建设方，监理方不参与索赔管理",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},384194,"合同类型的选择取决于风险的程度或者项目经理面临的不确定性。从买方的角度来看，适宜的低风险合同类型是（ ）",[241,243,245,247],{"key":20,"text":242,"correct":26},"固定价格合同",{"key":24,"text":244,"correct":22},"固定酬金合同",{"key":28,"text":246,"correct":22},"成本加固定酬金合同",{"key":31,"text":248,"correct":22},"成本加成本比例合同",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},384195,"下列关于项目合同谈判与签订有关法律法规错误的是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"在确定中标人前，招标人不得与投标人就投标价格、投标方案等实质性内容进行谈判。",{"key":24,"text":256,"correct":26},"招标人和中标人应当自中标通知书发出之日起十五日内，按照招标文件和中标人的投标文件订立书面合同。",{"key":28,"text":258,"correct":22},"依法必须进行招标的项目，招标人违反本法规定，与投保人就投标价格、投标方案等实质性内容进行谈判的，给予警告，对单位直接负责的主管人员和其他直接责任人员依法给与处分。",{"key":31,"text":260,"correct":22},"关于约束招投标的法律文件是《中华人民共和国招标投标法》。",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":31,"analysis":33},384196,"下列关于项目合同签订的注意事项错误的是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"当事人订立合同，应当具有相应的民事权利能力和民事行为能力。",{"key":24,"text":268,"correct":22},"质量验收标准是项目合同签订的一个关键指标。",{"key":28,"text":270,"correct":22},"当事人在订立合同过程中知悉的商业秘密，无论合同是否成立，不得泄露或者不正当地使用。",{"key":31,"text":272,"correct":26},"合同生效后，当事人就质量、价款或报酬、履行地点等内容没有约定或者约定不明确的，不可以补充协议。",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":28,"analysis":33},384197,"违约责任的承担方式不包括（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"继续履行",{"key":24,"text":280,"correct":22},"采取补救措施",{"key":28,"text":282,"correct":26},"按照合同走法律途径",{"key":31,"text":284,"correct":22},"赔偿损失",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":28,"analysis":33},384198,"小王为本公司草拟了一份计算机设备采购合同，其中写到“乙方需按通常的行业标准提供技术支持服务”。经理审阅后要求小王修改，原因是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"文字表达不通顺",{"key":24,"text":292,"correct":22},"格式不符合国家或行业标准的要求",{"key":28,"text":294,"correct":26},"对合同标的描述不够清晰、准确",{"key":31,"text":296,"correct":22},"术语使用不当",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":31,"analysis":33},384199,"以下不能用于成本补偿合同的是（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":22},"需立即开展工作的项目",{"key":24,"text":304,"correct":22},"对项目内容及技术经济指标未确定的项目",{"key":28,"text":306,"correct":22},"风险大的项目",{"key":31,"text":308,"correct":26},"工程量不太大且能精确计算、工期较短、技术不太复杂、风险不大的项目",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},384200,"在招标段，项目小组的任务是（ ）",[313,315,317,319],{"key":20,"text":314,"correct":22},"进行自制或购买决策",{"key":24,"text":316,"correct":26},"准备购文件",{"key":28,"text":318,"correct":22},"规定进度表参数，包括交付日期",{"key":31,"text":320,"correct":22},"为招标制定有关规定和图表",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},384201,"以下关于招投标的说法，错误的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"招标人设有标底的，标底必须保密",{"key":24,"text":328,"correct":22},"依法必须进行招标的项目，自招标文件开始发出之日起至投标人提交投标文件截止之日止，最短不得少于二十日",{"key":28,"text":330,"correct":26},"国家重点项目和省、自治区、直辖市人民政府确定的地方重点项目不适宜公开招标的，经相关部门批准，可以不进行招标",{"key":31,"text":332,"correct":22},"招标人具有编制招标文件和组织评标能力的，可以自行办理招标事宜",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":28,"analysis":33},384202,"某地政府采取询价方式采购网络设备，（ ）是符合招投标法要求的。",[337,339,341,343],{"key":20,"text":338,"correct":22},"询价小组由采购人的代表和有关专家共8人组成",{"key":24,"text":340,"correct":22},"被询价的A供应商提供第一次报价后，发现报价有误，调整后提交了二次报价",{"key":28,"text":342,"correct":26},"询价小组根据采购需求，从符合资格条件的供应商名单中确定三家供应商，并向其发出询价通知书让其报价",{"key":31,"text":344,"correct":22},"采购人根据符合采购需求、质量和服务相等且报价最低的原则确定成交供应商，最后将结果通知成交供应商",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},384203,"下列关于招投标法的说法错误的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"明确了招投标过程中设计的各方的法律责任的是《中华人民共和国招标投标法》",{"key":24,"text":352,"correct":26},"投标弄虚作假情节最严重的处罚是依法承担赔偿责任，不会构成犯罪",{"key":28,"text":354,"correct":22},"投标人相互串通投标或者与招标人串通投标的，投标无效",{"key":31,"text":356,"correct":22},"投标人以他人名义投标或者以其他方式弄虚作假，骗取中标的，中标无效",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":20,"analysis":33},384204,"某项目经理要求采购管理员从外面供货商那里采购硬件设备时，需要准备一个（ ）以描述采购设备的相关质量技术指标、验收标准和付款方式与期限等内容。",[361,363,365,367],{"key":20,"text":362,"correct":26},"工作说明书",{"key":24,"text":364,"correct":22},"合同范围说明",{"key":28,"text":366,"correct":22},"项目章程",{"key":31,"text":368,"correct":22},"合同",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":20,"analysis":33},384205,"某项目在启动阶段难以确定所需要的人员和资源，需要在实施过程中动态增加较多人员、专家和外部资源。在为该项目制订采购计划时需要确定采购合同类型，最适合该项目的合同类型是（ ）。",[373,375,376,377],{"key":20,"text":374,"correct":26},"时间和材料合同",{"key":24,"text":246,"correct":22},{"key":28,"text":173,"correct":22},{"key":31,"text":378,"correct":22},"固定总价合同",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},384206,"下列关于招标代理机构的说法错误的是（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"招标代理机构独立于政府和企业之外",{"key":24,"text":386,"correct":22},"招标代理机构属于中介服务组织",{"key":28,"text":388,"correct":22},"招标代理机构的招标代理资格需经国家招标投标主管机关的严格认证",{"key":31,"text":390,"correct":26},"组织编制、解释招标文件属于招标代理机构的权利",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},384207,"采购是项目管理工作的重要组成部分。以下关于采购的叙述中，（ ）是不正确的。",[395,397,399,401],{"key":20,"text":396,"correct":22},"采购管理计划是评估卖方的衡量指标",{"key":24,"text":398,"correct":26},"采购工作说明书不是来自于项目范围基准",{"key":28,"text":400,"correct":22},"采购工作说明书描述采购产品的细节",{"key":31,"text":402,"correct":22},"采购管理计划确定采用的合同类型",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},384208,"不属于IT项目采购对象的是（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"工程",{"key":24,"text":410,"correct":22},"产品\u002F货物",{"key":28,"text":412,"correct":26},"技术",{"key":31,"text":414,"correct":22},"服务",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},384209,"卖方的工作绩效数据不包括（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"满足质量标准的程度",{"key":24,"text":422,"correct":22},"已发生或已承诺的成本",{"key":28,"text":424,"correct":26},"可交付成果信息",{"key":31,"text":426,"correct":22},"已付讫的卖方发票的情况",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":28,"analysis":33},384210,"下列不属于结束采购的工具与技术的是（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"采购审计",{"key":24,"text":434,"correct":22},"采购谈判",{"key":28,"text":436,"correct":26},"采购交易",{"key":31,"text":438,"correct":22},"记录管理系统",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":20,"analysis":33},384211,"某系统集成一级企业年项目合同额近3亿元。采购部门要面临从交换机到固定螺丝及相关服务的大量采购任务，下面的采购措施中，不可取的是（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":26},"为防止采购人员可能出现经济问题，所有产品都按照统一规则、统一方法进行采购",{"key":24,"text":446,"correct":22},"按照重要程度将产品分为A类、B类、C类，分别制定采购规则，A类产品要通过招标，C类产品可简化采购手续",{"key":28,"text":448,"correct":22},"无论采购产品还是服务，都要建立对供应商的评价制度",{"key":31,"text":450,"correct":22},"建立和维护合格供应商名录来缩小采购选择的范围",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":28,"analysis":33},384212,"在采购规划过程中，需要考虑组织过程资产等一系列因素，以下（ ）不属于采购规划时需要考虑的",[455,456,458,460],{"key":20,"text":151,"correct":22},{"key":24,"text":457,"correct":22},"风险登记册",{"key":28,"text":459,"correct":26},"采购工作说明书",{"key":31,"text":461,"correct":22},"干系人登记册",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},384213,"关于投标说法错误的是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"投标人应当按照招标文件的要求编制投标文件",{"key":24,"text":469,"correct":22},"投标人应当在招标文件要求提交投标文件的截止时间前，将投标文件送达投标地点",{"key":28,"text":471,"correct":26},"投标人在招标文件要求提交投标文件的截止时间前，可以补充、修改或者撤回已提交的投标文件，并可以以任何形式通知投标人",{"key":31,"text":473,"correct":22},"两个以上法人或者其他组织可以组成一个联合体，以一个投标人的身份共同投标",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":28,"analysis":33},384214,"下列围绕采购供应商选择的做法中，（ ）是不恰当的",[478,480,482,484],{"key":20,"text":479,"correct":22},"采购部门根据历年供应商的供货情况建立了一个供应商数据库，根据数据库选择合格供应商",{"key":24,"text":481,"correct":22},"首先进行供应商调查，满足标准要求后可纳入合格供应商名单",{"key":28,"text":483,"correct":26},"为保持采购的公开透明，采购均采取招标形式选择合格供应商",{"key":31,"text":485,"correct":22},"把采购物品分为3个等级，最低一级供应企业可以没通过ISO9001认证",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},384215,"项目采购是一项复杂的工作，编制详细可行的项目采购计划有助于项目成功。（ ）属于编制项目采购计划所必须考虑的内容，",[490,491,493,495],{"key":20,"text":362,"correct":22},{"key":24,"text":492,"correct":26},"项目范围说明书",{"key":28,"text":494,"correct":22},"自制\u002F外购决定",{"key":31,"text":496,"correct":22},"合同收尾规程",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":28,"analysis":33},384216,"以下关于政府采购的说法，不正确的是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"为在中国境外使用而进行采购的，可以不采购本国货物、工程和服务",{"key":24,"text":504,"correct":22},"两个以上的自然人、法人或者其他组织也可以组成一个联合体，以一个供应商的身份共同参与政府采购",{"key":28,"text":506,"correct":26},"招标后没有供应商或者没有合格标的或者重新招标未能成立的，可以采用单一来源采购方式采购",{"key":31,"text":508,"correct":22},"公开招标应作为政府的采购方式",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":31,"analysis":33},384217,"项目工作说明书是对项目所需要提供的产品、成果或服务的描述。其内容一般不包括（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"业务要求",{"key":24,"text":516,"correct":22},"产品范围描述",{"key":28,"text":518,"correct":22},"项目目标",{"key":31,"text":520,"correct":26},"技术可行性分析",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":31,"analysis":33},384218,"根据我国政府采购法，采购人与中标成交供应商应当在中标通知书发出之日起（ ）日内按照采购文件确定的事项签订政府采购合同。",[525,527,529,531],{"key":20,"text":526,"correct":22},"7",{"key":24,"text":528,"correct":22},"10",{"key":28,"text":530,"correct":22},"20",{"key":31,"text":532,"correct":26},"30",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},384219,"下列关于实施采购的说法错误的是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"采购文件来自潜在卖方，是他们的报价建议书。",{"key":24,"text":540,"correct":22},"供方选择标准可包括供方能力、交付日期、产品成本、生命周期成本、技术专长，以及拟使用的方法等。",{"key":28,"text":542,"correct":22},"每一个卖方或者供方，在买书询价过程中都会提供建议书。",{"key":31,"text":544,"correct":26},"采购工作说明书是采购过程中的一个关键文件，一旦确定则不能修改。",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},384220,"信息系统文档的管理主要体现在文档书写规范、图表编号规则、文档目录编写标准和（ ）等几个方面。",[549,551,553,555],{"key":20,"text":550,"correct":22},"文档管理方法",{"key":24,"text":552,"correct":26},"文档管理制度",{"key":28,"text":554,"correct":22},"监理文档规范",{"key":31,"text":556,"correct":22},"文档使用权限控制",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},384221,"下列关于信息发布和交付说法错误的是（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"选择存储介质使再生差错或损坏降至最低限度，确保存储配置项的完整性。",{"key":24,"text":564,"correct":26},"复制是用拷贝方式制造软件的阶段之一。",{"key":28,"text":566,"correct":22},"打包应确保按批准的规程制备交付的介质。",{"key":31,"text":568,"correct":22},"供方应按合同中的规定交付产品或服务。",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},384222,"配置管理计划是对如何开展项目配置管理工作的规划，是配置管理过程的基础，应该形成文件并在整个项目生命周期内处于（ ）状态。",[573,575,577,579],{"key":20,"text":574,"correct":26},"受控状态",{"key":24,"text":576,"correct":22},"等待状态",{"key":28,"text":578,"correct":22},"控制状态",{"key":31,"text":580,"correct":22},"监控状态",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":31,"analysis":33},384223,"以下不属于配置状态报告应该包括的内容的是（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"每个受控配置项的标识和状态",{"key":24,"text":588,"correct":22},"每个变更申请的状态和已批准的修改的实施状态",{"key":28,"text":590,"correct":22},"每个基线的当前和过去版本的状态以及各版本的比较",{"key":31,"text":592,"correct":26},"配置状态报告应着重反应当前基线配置的状态。",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":20,"analysis":33},384224,"下列不属于配置库类型的是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":26},"工具库",{"key":24,"text":600,"correct":22},"开发库",{"key":28,"text":602,"correct":22},"受控库",{"key":31,"text":604,"correct":22},"产品库",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":28,"analysis":33},384225,"配置审计包括功能配置审计和物理配置审计，以下不属于功能配置审计验证内容的是（ ）。",[609,611,613,615],{"key":20,"text":610,"correct":22},"配置项的开发已圆满完成。",{"key":24,"text":612,"correct":22},"配置项已达到配置标识中规定的性能和功能特征。",{"key":28,"text":614,"correct":26},"配置项中是否包含了所有必需的项目。",{"key":31,"text":616,"correct":22},"配置项的操作和支持文档已完成并且是符合要求的。",[618,622,625,628,631,634],{"id":619,"name":620,"category":7,"favorite":621},136,"法律职业试卷二(客观题 )",2,{"id":623,"name":624,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":626,"name":627,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":629,"name":630,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":632,"name":633,"category":7,"favorite":8},28,"安全工程师",{"id":635,"name":636,"category":7,"favorite":8},112,"安全生产法律知识"]