[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,5,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,188,200,212,224,236,248,260,272,284,296,308,320,332,344,356,368,380,392,404,415,427,439,451,463,475,487,499,511,523,535,547,559,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},384124,1,"单选题","质量控制输入中工作绩效数据不包括（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","实际技术性能",false,{"key":24,"text":25,"correct":22},"B","实际进度绩效",{"key":27,"text":28,"correct":29},"C","实际质量绩效",true,{"key":31,"text":32,"correct":22},"D","实际成本绩效","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},384125,"质量似乎是你们公司的追求。首先，公司通过了ISO9000认证。现在执行总裁想赢得MalcolmBaldrige奖。每个项目都有一份与机构的远景目标一致的质量综述。对所有项目提供内部和外部的质量保证以便（ ）",[38,40,42,44],{"key":20,"text":39,"correct":29},"确保项目满足相关的质量标准",{"key":24,"text":41,"correct":22},"监控特定的项目结果以确定它们是否符合相关的质量标准",{"key":27,"text":43,"correct":22},"找出排除不满意结果产生过程的方法",{"key":31,"text":45,"correct":22},"检查以排除过程中的错误",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},384126,"规划质量管理的过程中可以用到多种工具和技术。（ ）是一种统计方法，用来识别那些因素会对正在生产的产品或正在开发的流程的特定变量产生影响。",[50,52,54,56],{"key":20,"text":51,"correct":22},"成本效益分析法",{"key":24,"text":53,"correct":22},"质量成本法",{"key":27,"text":55,"correct":22},"标杆对照",{"key":31,"text":57,"correct":29},"实验设计",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},384127,"应用Paretol图可以（ ）",[62,64,66,68],{"key":20,"text":63,"correct":29},"将精力集中到最关键的因素上",{"key":24,"text":65,"correct":22},"量化风险",{"key":27,"text":67,"correct":22},"帮助预测未来的问题",{"key":31,"text":69,"correct":22},"改进风险管理",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},384128,"（ ）技术是确定为了完成项目工作所需的资源和技能水平的最佳方法。",[74,76,78,80],{"key":20,"text":75,"correct":22},"预测",{"key":24,"text":77,"correct":22},"挣值",{"key":27,"text":79,"correct":29},"专家判断",{"key":31,"text":81,"correct":22},"帕累托图",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},384129,"在某操作系统中，47%的错误是由该系统4%的程序模块产生的，该现象是（ ）特征。",[86,88,90,92],{"key":20,"text":87,"correct":22},"蒙特卡洛",{"key":24,"text":89,"correct":22},"大数定律",{"key":27,"text":91,"correct":29},"帕累托定律",{"key":31,"text":93,"correct":22},"PDPC",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},384130,"关于质量控制的作用说法正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":29},"识别过程低效或产品质量低劣的原因，建议并采取相应措施消除这些原因。",{"key":24,"text":101,"correct":22},"确认项目的可交付成果及工作满足主要干系人的既定需求，但不足以进行最终验收。",{"key":27,"text":103,"correct":22},"可以实现工作绩效数据、组织过程资产的管理。",{"key":31,"text":105,"correct":22},"质量控制测量数据、核实可交付成果和项目管理计划更新。",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},384131,"以下关于编制项目人力资源计划的有关说法错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"通过编制项目人力资源计划过程，确定项目的角色、职责以及汇报关系，并编制人员配备管理计划。",{"key":24,"text":113,"correct":22},"任务、职责和汇报关系可以分配到个人或团体。",{"key":27,"text":115,"correct":29},"在所有项目中，编制项目人力资源计划过程主要作为项目最初阶段的一部分。",{"key":31,"text":117,"correct":22},"项目要有备选人员。",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},384132,"在某软件开发项目中，项目经理发现年轻开发人员流动的流失较为严重，导致项目进行中花费大量时间进行招聘、任务交接和善后处理。下列选项中无法改善人员流失状况的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"通过了解项目团员的感情，预测其行动，了解其后顾之忧，并尽力帮助他们解决问题",{"key":24,"text":125,"correct":29},"为了项目的完成，考虑到有限的人力资源，将该项目分包，在时限内完成项目",{"key":27,"text":127,"correct":22},"拨出专门团队建设经费，并鼓励团队内非正式的沟通和活动",{"key":31,"text":129,"correct":22},"建立培训和知识共享机制，使得所有的团队成员都可以学习到新的知识以及能够互相帮助",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},384133,"（ ）不能作为编制人力资源计划的工具。",[134,136,138,140],{"key":20,"text":135,"correct":22},"层次结构图",{"key":24,"text":137,"correct":22},"责任分配矩阵",{"key":27,"text":139,"correct":22},"文本格式的角色描述",{"key":31,"text":141,"correct":29},"团队成员的通讯录",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},384134,"组建团队是指获得人力资源的过程，项目管理团队应确保所选择的人力资源可以达到项目的要求。在此要求下，组建项目团队需要的输入应包括（ ）。①角色和责任②资源日历③项目的组织结构图④环境和组织因素⑤项目人员分配",[146,148,150,152],{"key":20,"text":147,"correct":22},"①②③",{"key":24,"text":149,"correct":29},"①③④",{"key":27,"text":151,"correct":22},"②③⑤",{"key":31,"text":153,"correct":22},"③④⑤",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},384135,"虽然项目具有独特性，但考虑到当前进行的项目和去年已完工的一个项目类似，为了加快人力资源计划的编制，项目经理小王采用了这个类似项目的任务或职责定义、汇报关系、组织架构图和职位描述。小王在人力资源计划的编制过程中采用了（ ）方法。",[158,160,162,164],{"key":20,"text":159,"correct":22},"组织结构图和职位描述",{"key":24,"text":161,"correct":29},"人力资源模板",{"key":27,"text":163,"correct":22},"非正式的人际网络",{"key":31,"text":165,"correct":22},"活动资源估算",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},384136,"在冲突管理中，经常要集合多方观点和意见，得出一个多数人接受和承诺的冲突解决方案。这种冲突管理的方法被称为（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":29},"合作",{"key":24,"text":173,"correct":22},"强制",{"key":27,"text":175,"correct":22},"妥协",{"key":31,"text":177,"correct":22},"回避",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},384137,"可使用多种形式描述项目的角色和职责，最常用的有三种，不包括（ ）。",[182,184,185,186],{"key":20,"text":183,"correct":29},"分配矩阵",{"key":24,"text":135,"correct":22},{"key":27,"text":137,"correct":22},{"key":31,"text":187,"correct":22},"文本格式",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":27,"analysis":33},384138,"项目经理在选择团队建设具体活动时，可考虑专门的活动或个人行为，活动的首要目的是提高团队绩效。（ ）不属于团队建设活动。",[192,194,196,198],{"key":20,"text":193,"correct":22},"为平息冲突制定规则",{"key":24,"text":195,"correct":22},"项目经理在网上为团队成员组建一个工作群",{"key":27,"text":197,"correct":29},"定期召开会议，评价团队绩效",{"key":31,"text":199,"correct":22},"集中办公",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},384140,"下列不属于组建项目团队应该考虑的因素是（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"项目经理或项目管理团队应该进行有效协商或谈判，并影响那些能为项目提供所需人力资源的人员。",{"key":24,"text":207,"correct":22},"不能获得项目所需的人力资源，可能影响项目进度、预算、客户满意度、质量和风险。",{"key":27,"text":209,"correct":22},"如因制约因素无法获得所需人力资源，在不违背法律、规章、强制性规定或其他具体标准的前提下，项目经理或项目团队可能不得不使用替代资源。",{"key":31,"text":211,"correct":29},"项目管理小组必须保证所用的人员能符合项目的要求。",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},384141,"绩效报告是指搜集所有基准数据并向项目干系人提供项目绩效信息，为了项目绩效报告，首先要收集材料，这些材料不包括（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"被评价项目资料的清单",{"key":24,"text":219,"correct":29},"项目绩效预测",{"key":27,"text":221,"correct":22},"调查问卷",{"key":31,"text":223,"correct":22},"征询函",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":31,"analysis":33},384142,"一家公司为了满足员工社会交往的需要会经常组织一些聚会和社会活动,还为没有住房的员工提供抵押贷款,这些激励员工的理论基础是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"期望理论",{"key":24,"text":231,"correct":22},"X理论和Y理论",{"key":27,"text":233,"correct":22},"赫茨伯格的双因素理论",{"key":31,"text":235,"correct":29},"马斯洛需要层次理论",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},384143,"对团队成员的激励永远是困扰项目经理的一个问题，对于高创新要求的项目团队来说，利用（ ）相对会更加有效。",[240,242,244,246],{"key":20,"text":241,"correct":29},"赋予更大的责任和权力",{"key":24,"text":243,"correct":22},"大幅增加薪酬",{"key":27,"text":245,"correct":22},"给予必要的关心和照顾",{"key":31,"text":247,"correct":22},"给予更高的社会地位",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},384144,"以下关于优秀团队需要经历的阶段正确的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":29},"形成阶段、震荡阶段、规范阶段、发挥阶段、结束阶段",{"key":24,"text":255,"correct":22},"形成阶段、震荡阶段、发挥阶段、规范阶段、结束阶段",{"key":27,"text":257,"correct":22},"形成阶段、震荡阶段、规范阶段、上进阶段、结束阶段",{"key":31,"text":259,"correct":22},"形成阶段、震荡阶段、上进阶段、规范阶段、结束阶段",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":27,"analysis":33},384145,"项目人力资源管理就是有效地发挥每一个参与项目人员的作用，把合适的人组成一个战斗力超强的团队的过程。在这个过程中涉及的一些概念说法错误的是（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"动机促使人从事某种活动的念头，是促使人做某种活动的一种心理驱动。",{"key":24,"text":267,"correct":22},"组织结构图用图形表示项目汇总关系。",{"key":27,"text":269,"correct":29},"把分内工作做好就是一个员工的责任。",{"key":31,"text":271,"correct":22},"任务或责任分配矩阵是用来表示需要完成的工作由哪个团队成员负责的矩阵。",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},384146,"项目人力资源管理的过程不包括（ ）",[276,278,280,282],{"key":20,"text":277,"correct":29},"选定项目成员",{"key":24,"text":279,"correct":22},"组建项目团队",{"key":27,"text":281,"correct":22},"建设项目团队",{"key":31,"text":283,"correct":22},"管理项目团队",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},384147,"项目人力资源管理包括人力资源管理计划、组建项目团队、建设项目团队与管理项目团队的各个过程，其作用不包括（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"充分发挥参与项目的个人的作用",{"key":24,"text":291,"correct":22},"充分发挥所有与项目有关的人员，即项目负责人、客户、为项目做出贡献的个人及其他人员的作用。",{"key":27,"text":293,"correct":22},"要求充分发挥项目团队的作用。",{"key":31,"text":295,"correct":29},"完全承担了相应的角色和责任的人员",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},384148,"人员配备管理计划描述何时以及怎样满足人力资源需求。关于人员配备管理计划的叙述中，（ ）是正确的。",[300,302,304,306],{"key":20,"text":301,"correct":29},"制定人员配备管理计划可采用工作分解结构、组织分解结构和资源分解结构等描述工具",{"key":24,"text":303,"correct":22},"项目人力资源计划可以是正式或非正式的，但人员配备管理计划是不能省略的正式计划",{"key":27,"text":305,"correct":22},"人员配备管理计划通常制订人员需求和人力资源时间安排，不涉及人员培训和奖惩措施",{"key":31,"text":307,"correct":22},"项目人力资源计划是项目人员配备管理计划的一个分计划",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},384149,"关于项目管理环境中的冲突管理的叙述中，（ ）是正确的。",[312,314,316,318],{"key":20,"text":313,"correct":22},"通过建立团队基本规则及实施可行的项目管理经验，冲突是可以避免的",{"key":24,"text":315,"correct":22},"解决冲突最理想方法是求同存异",{"key":27,"text":317,"correct":22},"冲突管理的最终目的是消除意见分歧",{"key":31,"text":319,"correct":29},"不管冲突对项目的影响是正面的还是负面的，项目里都有责任处理它",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},384150,"项目经理管理项目团队有时需要解决冲突，（ ）属于解决冲突的范畴。",[324,326,328,330],{"key":20,"text":325,"correct":29},"强制、妥协、撤退",{"key":24,"text":327,"correct":22},"强制、求同存异、观察",{"key":27,"text":329,"correct":22},"妥协、求同存异、增加权威",{"key":31,"text":331,"correct":22},"妥协、撤退、预防",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":27,"analysis":33},384151,"在组建项目团队时，人力资源要满足项目要求。以下说法，（ ）是不妥当的。",[336,338,340,342],{"key":20,"text":337,"correct":22},"对关键岗位要有技能标准，人员达标后方可聘用",{"key":24,"text":339,"correct":22},"与技能标准有差距的员工进行培训，合格后可聘用",{"key":27,"text":341,"correct":29},"只要项目经理对团队成员认可就可以",{"key":31,"text":343,"correct":22},"在组建团队时要考虑能力、经验、兴趣、成本等人员因素",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},384152,"成功的项目团队的特点不包括（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":22},"团队的目标明确，成员清楚自己的工作对目标的贡献。",{"key":24,"text":351,"correct":22},"有成文或习惯的工作流程和方法，而且流程简明有效。",{"key":27,"text":353,"correct":22},"项目经理对团队成员有明确的考核和评价标准，工作结果公正公开、赏罚分明。",{"key":31,"text":355,"correct":29},"一个成员工作必须依赖于另一个成员的结果，善于总结和学习。",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},384153,"获取人力资源的依据不包括（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"项目人力资源计划",{"key":24,"text":363,"correct":29},"项目执行计划",{"key":27,"text":365,"correct":22},"事业环境因素",{"key":31,"text":367,"correct":22},"组织过程资产",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":27,"analysis":33},384154,"下列不属于沟通渠道的是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"文字",{"key":24,"text":375,"correct":22},"语言",{"key":27,"text":377,"correct":29},"比划",{"key":31,"text":379,"correct":22},"混合",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},384155,"（ ）不是管理干系人的输入",[384,386,388,390],{"key":20,"text":385,"correct":29},"问题日志",{"key":24,"text":387,"correct":22},"干系人管理计划",{"key":27,"text":389,"correct":22},"变更日志",{"key":31,"text":391,"correct":22},"沟通管理计划",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},384156,"你正在组织项目沟通协调会，参加会议的人数为12人，沟通渠道有（ ）条。",[396,398,400,402],{"key":20,"text":397,"correct":29},"66",{"key":24,"text":399,"correct":22},"72",{"key":27,"text":401,"correct":22},"96",{"key":31,"text":403,"correct":22},"132",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":20,"analysis":33},384157,"以下（ ）不是控制沟通的技术和方法。",[408,410,412,414],{"key":20,"text":409,"correct":29},"业务数据分析",{"key":24,"text":411,"correct":22},"项目例会",{"key":27,"text":413,"correct":22},"信息管理系统",{"key":31,"text":79,"correct":22},{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":27,"analysis":33},384158,"（ ）不是识别干系人的输入。",[419,421,423,425],{"key":20,"text":420,"correct":22},"项目章程",{"key":24,"text":422,"correct":22},"采购文件",{"key":27,"text":424,"correct":29},"干系人登记手册",{"key":31,"text":426,"correct":22},"环境因素",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":20,"analysis":33},384159,"沟通管理计划的编制是确定（ ）的过程，即明确谁需要何种信息，何时需要以及如何向他们传递。",[431,433,435,437],{"key":20,"text":432,"correct":29},"干系人信息与沟通需求",{"key":24,"text":434,"correct":22},"沟通方式与信息发布",{"key":27,"text":436,"correct":22},"干系人提供的绩效信息",{"key":31,"text":438,"correct":22},"干系人管理与经验教训总结",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":27,"analysis":33},384160,"项目经理80%甚至更多的时间都用于进行项目沟通工作。在项目的沟通管理计划中可以不包括（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"传达信息所需的技术或方法",{"key":24,"text":446,"correct":22},"沟通频率",{"key":27,"text":448,"correct":29},"干系人登记册",{"key":31,"text":450,"correct":22},"对要发布信息的描述",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},384161,"管理干系人参与，不属于常用的沟通方法的是（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"交互式沟通",{"key":24,"text":458,"correct":22},"推式沟通",{"key":27,"text":460,"correct":22},"拉式沟通",{"key":31,"text":462,"correct":29},"被动沟通",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":27,"analysis":33},384162,"下列关于管理沟通的说法错误的是（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"项目经理要根据实际情况在不同的阶段选择适合的沟通渠道。",{"key":24,"text":470,"correct":22},"在不同的项目实施阶段要选择不同的信息传递方式。",{"key":27,"text":472,"correct":29},"传统的如纸质文件管理系统方式尽量减少使用。",{"key":31,"text":474,"correct":22},"项目经理按照计划要求，定期或不定期的要进行手机和发布信息。",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},384163,"（ ）是项目干系人管理的主要目的。",[479,481,483,485],{"key":20,"text":480,"correct":22},"识别项目的所有潜在用户来确保完成项目总体设计",{"key":24,"text":482,"correct":22},"避免项目干系人提出不一致的要求",{"key":27,"text":484,"correct":22},"通过制订对项目干系人调查表来关注对项目的评价",{"key":31,"text":486,"correct":29},"避免项目干系人在项目管理中出现严重分歧",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":27,"analysis":33},384164,"在某企业承建的一个信息系统集成项目中，建设方注重交付时间和质量，承建方公司老总注重项目利润，质量监控部经理注重项目的质量，人力资源部经理注重项目人力使用效率。下列围绕项目干系人管理的叙述错误的是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"各项目干系人的目标可能是相互矛盾的",{"key":24,"text":494,"correct":22},"在项目不同阶段，干系人的要求要有不同的优先级别",{"key":27,"text":496,"correct":29},"重点考虑客户要求，人力资源部经理意见可忽略",{"key":31,"text":498,"correct":22},"当质量、进度、成本目标发生矛盾时，项目经理要进行平衡",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},384165,"下列不属于控制沟通输出中变更请求的是（ ）。",[503,505,507,509],{"key":20,"text":504,"correct":22},"新的或者更新的成本估算、活动排序、进度、资源需求和风险应对方案",{"key":24,"text":506,"correct":29},"调整项目管理计划",{"key":27,"text":508,"correct":22},"纠正措施",{"key":31,"text":510,"correct":22},"预防措施",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":31,"analysis":33},384166,"下列关于沟通基本技能说法错误的是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"有效利用多种手段，尽最大可能帮助自己理解信息内容。",{"key":24,"text":518,"correct":22},"强大的人格魅力和信用，能够帮助其他人树立信息。",{"key":27,"text":520,"correct":22},"不回避问题，尽量了解事实真相。",{"key":31,"text":522,"correct":29},"设定沟通目标，但尽量减少跟踪等手段确定是否达到沟通目标。",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":27,"analysis":33},384167,"某项目的现状是：已经按照沟通计划发布了项目信息；一些项目可交付成果发生了变更；这些变更时按照变更控制计划做出的；一位干系人在得知以前曾经公布过的项目可交付成果变更时，感觉十分惊讶；其余干系人都收到了变更通知的消息。针对这种情况，项目经理应该（）",[527,529,531,533],{"key":20,"text":528,"correct":22},"告诉干系人信息公布的日期",{"key":24,"text":530,"correct":22},"审核沟通计划，确定为什么干系人不理解自己的职责",{"key":27,"text":532,"correct":29},"对沟通计划进行审核，如需要，对沟通计划进行修改",{"key":31,"text":534,"correct":22},"在下次项目工作会议上说明该问题，以便其他干系人不会遗忘公布的变更信",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},384168,"与他人会谈以达成一致或者共识的过程被称为（ ）",[539,541,543,545],{"key":20,"text":540,"correct":22},"双赢",{"key":24,"text":542,"correct":29},"谈判",{"key":27,"text":544,"correct":22},"争取同意",{"key":31,"text":546,"correct":22},"对抗",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},384169,"头脑风暴属于4种沟通方式中的（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":29},"参与讨论方式",{"key":24,"text":554,"correct":22},"征询方式",{"key":27,"text":556,"correct":22},"推销方式",{"key":31,"text":558,"correct":22},"叙述方式",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},384170,"在进行沟通过程中，要根据沟通目标、参与者的特点选择合适的沟通方式。以下不属于沟通方式的是（ ）。",[563,565,566,567],{"key":20,"text":564,"correct":29},"被动接受方式",{"key":24,"text":554,"correct":22},{"key":27,"text":556,"correct":22},{"key":31,"text":558,"correct":22},{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},384171,"币值波动、政治动荡、中央和地方政府之间的竞争，以及不同利益集团之间的冲突可能会干扰国际项目的管理。管理国际项目的项目经理应该意识到跨文化环境的主要影响因素，并特别重视（ ）",[572,574,576,578],{"key":20,"text":573,"correct":22},"建立绩效报告制度",{"key":24,"text":575,"correct":29},"建立沟通管理系统",{"key":27,"text":577,"correct":22},"建立和执行生产进度表以方便信息分配，避免在定期会面之间出现情况的变化",{"key":31,"text":579,"correct":22},"通过翻译服务起草正式的项目报告",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":24,"analysis":33},384173,"下面关于项目干系人管理的说法中，不正确的是（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"项目干系人管理就是对项目的沟通进行管理，以满足信息需要者的需求并解决项目干系人之间的问题",{"key":24,"text":587,"correct":29},"项目干系人管理应由项目经理之外的职能经理负责",{"key":27,"text":589,"correct":22},"面对面的会议是最有效的沟通和解决干系人之间问题的方法",{"key":31,"text":591,"correct":22},"项目干系人也可以是项目团队成员之外参与项目的人员、其三大职责是参与、审查和反馈",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":27,"analysis":33},384174,"项目沟通管理涉及到项目管理的诸多内容。一般而言，（ ）不属于项目沟通管理计划的主要内容。",[596,598,600,602],{"key":20,"text":597,"correct":22},"项目干系人沟通需求",{"key":24,"text":599,"correct":22},"传递信息的技术和方法",{"key":27,"text":601,"correct":29},"项目会议频率",{"key":31,"text":603,"correct":22},"通用词语表",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":20,"analysis":33},384175,"项目经理编制了一份项目沟通计划。其主要内容包括项目干系人要求、发布信息的描述、传达信息所需的技术方法和沟通频次。这份计划中还欠缺的最主要内容是（ ）。",[608,610,612,614],{"key":20,"text":609,"correct":29},"信息接收的个人和组织",{"key":24,"text":611,"correct":22},"沟通计划检查要求",{"key":27,"text":613,"correct":22},"沟通备忘录",{"key":31,"text":615,"correct":22},"干系人分析",[617,621,624,627,630,633],{"id":618,"name":619,"category":7,"favorite":620},136,"法律职业试卷二(客观题 )",2,{"id":622,"name":623,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":625,"name":626,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":628,"name":629,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":631,"name":632,"category":7,"favorite":8},28,"安全工程师",{"id":634,"name":635,"category":7,"favorite":8},112,"安全生产法律知识"]