[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,4,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,225,237,249,261,273,285,297,308,320,332,344,356,368,380,392,404,416,428,440,452,464,475,487,499,511,523,535,547,559,571,583,595,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},384074,1,"单选题","项目进度表至少包括每项计划活动的计划开始日期与计划完成日期，常见的做法是用一种或多种格式的图形表示。在下面的图表中，常用于表示项目进度表的是（ ）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","横道图",true,{"key":24,"text":25,"correct":26},"B","排列图",false,{"key":28,"text":29,"correct":26},"C","鱼骨图",{"key":31,"text":32,"correct":26},"D","趋势图","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},384075,"一个新测试中心将在两年内建成。项目发起人和项目经理已经确定并且高层次估算已经开始。预计该项目可以在预算内按进度计划完成。唯一的难点是获得完成工作所需的具有正确专门技能的人力资源。在这种情况下，项目经理应建立（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"风险分析",{"key":24,"text":41,"correct":26},"责任分配矩阵",{"key":28,"text":43,"correct":26},"责任图",{"key":31,"text":45,"correct":22},"受资源限制的进度计划",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},384076,"前导图和箭线图都是网络图。它们之间的主要差别是：（ ）",[50,52,54,56],{"key":20,"text":51,"correct":26},"箭线图在活动期间与PERT图合并",{"key":24,"text":53,"correct":22},"前导图将活动作为节点",{"key":28,"text":55,"correct":26},"箭线图不能指明关键路径",{"key":31,"text":57,"correct":26},"前导图将浮动时间作为活动历时的一部分",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},384077,"在进度控制中使用假设情景分析的目的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"评审各种情景，使进度与计划保持一致",{"key":24,"text":65,"correct":26},"记录请求的变更",{"key":28,"text":67,"correct":26},"针对何时应更新进度基准，提供额外详情",{"key":31,"text":69,"correct":26},"更新活动属性",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},384078,"关于项目进度管理中的活动历时估算的叙述，（ ）是正确的。",[74,76,78,80],{"key":20,"text":75,"correct":26},"活动历时估算应给出尽量准确的结果，不应给出变化范围，例如. 2周±2天",{"key":24,"text":77,"correct":26},"多方案分析法是一种常用的活动历时估算方法",{"key":28,"text":79,"correct":22},"常用的活动历时估算方法包括类比估算、参数估算、三点估算法和后备分析法",{"key":31,"text":81,"correct":26},"类比估算法也称为自下而上估算法，常用于项目早期的活动历时估算",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},384079,"下面不属于排列活动顺序的工具的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"前导图法",{"key":24,"text":89,"correct":26},"箭线图法",{"key":28,"text":91,"correct":22},"明确相互关系",{"key":31,"text":93,"correct":26},"提前量与滞后量",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},384080,"估算活动资源的工具与技术包括专家判断、备选方案分析、发布的估算数据、项目管理软件，还包括（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"结构分层估算",{"key":24,"text":101,"correct":26},"逐层汇总估算",{"key":28,"text":103,"correct":26},"自上而下估算",{"key":31,"text":105,"correct":22},"自下而上估算",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},384081,"排列活动顺序的输入包括进度管理计划、活动清单、活动属性、里程碑清单、事业环境因素，其中下列不属于事业环境因素的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"组织文化或结构",{"key":24,"text":113,"correct":26},"政府或行业标准",{"key":28,"text":115,"correct":26},"进度规划工具",{"key":31,"text":117,"correct":26},"公司的工作授权系统",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},384082,"某项目经理在对项目历时进行估算时，认为正常情况下完成项目需要42天，同时也分析了影响项目工期的因素，认为最快可以在35天内完成工作，而在最不利的条件下则需要55天完成任务。采用三点估算得到的工期是（ ）天。",[122,124,126,128],{"key":20,"text":123,"correct":26},"42",{"key":24,"text":125,"correct":22},"43",{"key":28,"text":127,"correct":26},"44",{"key":31,"text":129,"correct":26},"55",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},384083,"定义活动的输出包括活动清单、活动属性、里程碑清单，以下说法错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"活动清单是一份包含项目所需的全部活动的综合清单。",{"key":24,"text":137,"correct":22},"活动属性不可用于编制进度计划，这不包括在内。",{"key":28,"text":139,"correct":26},"活动属性是活动清单中的活动描述的扩展。",{"key":31,"text":141,"correct":26},"里程碑是项目中的重要时刻或事件。",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},384084,"某大型项目进行到两年时，使用挣值法所需的三个中间变量的数值分别是：计划值PV为400万元，实际成本AC为200万元，挣值EV为100万元。基于该项目的成本偏差，下列描述中正确的是（ ）；基于该项目的成本绩效指数，下列描述中正确的是成本绩效指数小于1，且实际发生的成本是预算成本的2倍。",[146,148,150,152],{"key":20,"text":147,"correct":22},"项目成本偏差为负，且项目处于超支状态",{"key":24,"text":149,"correct":26},"项目成本偏差为正，且项目处于超支状态",{"key":28,"text":151,"correct":26},"项目成本偏差为负，且项目处于成本节约状态",{"key":31,"text":153,"correct":26},"项目成本偏差为正，且项目处于成本节约状态",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},384085,"在（ ）情况下，可使用储备金。",[158,160,162,164],{"key":20,"text":159,"correct":26},"需要添加额外资金以弥补初始预算",{"key":24,"text":161,"correct":26},"当协商劳动合同时，潜在劳动力价格会发生波动",{"key":28,"text":163,"correct":22},"确定发生了预计的问题但没有估计完全",{"key":31,"text":165,"correct":26},"当客户要求项目高质量完成时",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},384086,"自下而上估算方法是指估算单个工作包或细节最详细的活动的成本，然后将这些详细的成本汇总到更高层级估算的方法，下面关于该方法的描述中（ ）是错误的。",[170,172,174,176],{"key":20,"text":171,"correct":26},"其精确性取决于估算对象的规模和复杂程度",{"key":24,"text":173,"correct":26},"便于报告和跟踪",{"key":28,"text":175,"correct":22},"适于对项目情况了解较少时采用",{"key":31,"text":177,"correct":26},"该估算方法的准确性通常高于其他估算方法",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},384087,"项目估算容易被忽略的主要因素不包括（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"非直接成本",{"key":24,"text":185,"correct":26},"学习曲线",{"key":28,"text":187,"correct":26},"项目完成的时限",{"key":31,"text":189,"correct":22},"质量体系",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},384088,"项目进行到某阶段时，项目经理进行了绩效分析，计算出CPI值为0.91。这表示（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"项目的每91元人民币投资中可创造相当于100元的价值",{"key":24,"text":197,"correct":26},"当项目完成时将会花费投资额的91％",{"key":28,"text":199,"correct":26},"项目仅进展到计划进度的91％",{"key":31,"text":201,"correct":22},"项目的每100元人民币投资中只创造相当于91元的价值",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},384089,"以下各项中，不能作为项目成本预算工具或技术的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"参数估算",{"key":24,"text":209,"correct":26},"资金限制平衡",{"key":28,"text":211,"correct":22},"挣值分析",{"key":31,"text":213,"correct":26},"准备金分析",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},384090,"在进行项目成本估算时，可以使用多种技术和工具，其中（ ）相对于其他估算技术来说，成本较低，耗时较少，但准确性也较低。",[218,220,222,223],{"key":20,"text":219,"correct":26},"专家判断",{"key":24,"text":221,"correct":22},"类比估算",{"key":28,"text":207,"correct":26},{"key":31,"text":224,"correct":26},"三点估算",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},384091,"将项目总成本分摊到项目工作分解结构的各个工作包，分解应按照（ ），根据占用资源数量多少而设置不同的分解权重。",[229,231,233,235],{"key":20,"text":230,"correct":26},"自下向上",{"key":24,"text":232,"correct":26},"分部分项",{"key":28,"text":234,"correct":22},"自顶向下",{"key":31,"text":236,"correct":26},"由多到少",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":31,"analysis":33},384092,"每次项目投标，都需要向招标方交纳一定比例的押金，由此产生的费用属于（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":26},"固定成本",{"key":24,"text":244,"correct":26},"直接成本",{"key":28,"text":246,"correct":26},"机会成本",{"key":31,"text":248,"correct":22},"间接成本",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},384093,"项目成本预算应遵循的原则不包括（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":26},"要以项目需求为基础",{"key":24,"text":256,"correct":22},"项目质量和进度不能同时兼顾",{"key":28,"text":258,"correct":26},"要切实可行",{"key":31,"text":260,"correct":26},"应当留有弹性",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":31,"analysis":33},384094,"在项目管理中，采取（ ）方法，对项目进度计划实施进行全过程监督和控制是经济和合理的。",[265,267,269,271],{"key":20,"text":266,"correct":26},"会议评审和MONTE CARLO分析",{"key":24,"text":268,"correct":26},"项目月报和旁站",{"key":28,"text":270,"correct":26},"进度报告和旁站",{"key":31,"text":272,"correct":22},"挣值管理和会议评审",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":28,"analysis":33},384095,"在进行挣值管理时，如果实际进度点位于PV曲线的左侧，则该点与PV曲线的垂直距离表示实际进度比计划进度（ ）",[277,279,281,283],{"key":20,"text":278,"correct":26},"超前的时间",{"key":24,"text":280,"correct":26},"拖后的时间",{"key":28,"text":282,"correct":22},"超额完成的任务量",{"key":31,"text":284,"correct":26},"拖欠的任务量",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},384096,"（ ）is aproject mangement technique for measuring project performance and proress.it has the ability to combine measurements of the project management triangle;scope.time and costs.",[289,291,293,295],{"key":20,"text":290,"correct":26},"Critica path method（CPM）",{"key":24,"text":292,"correct":22},"Earned value mangagemengt（EVM）",{"key":28,"text":294,"correct":26},"Net present value method（NPVM）",{"key":31,"text":296,"correct":26},"Expert judgment method（EJM）",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},384097,"下面不属于成本类型的是（ ）。",[301,303,305,306],{"key":20,"text":302,"correct":22},"生产成本",{"key":24,"text":304,"correct":26},"可变成本",{"key":28,"text":246,"correct":26},{"key":31,"text":307,"correct":26},"沉没成本",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":28,"analysis":33},384098,"小李所负责的项目已经完成了20%。最近一次的挣值分析结果显示，成本绩效指数（CPI）为0.67，进度绩效指数（SPI）为0.87。在这种情况下，小李应该（ ）",[312,314,316,318],{"key":20,"text":313,"correct":26},"实施额外的资源计划编制，增加资源，并且在需要的时候进行超时工作，完成已预算好的工作量",{"key":24,"text":315,"correct":26},"为进度重新设定基准，然后使用蒙特卡罗分析",{"key":28,"text":317,"correct":22},"实施风险应对审计以帮助控制风险",{"key":31,"text":319,"correct":26},"更新风险的识别、定性风险分析和定量风险分析",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},384099,"（ ）不属于成本管理过程。",[324,326,328,330],{"key":20,"text":325,"correct":26},"资源计划过程",{"key":24,"text":327,"correct":26},"成本估计过程",{"key":28,"text":329,"correct":26},"成本预算过程",{"key":31,"text":331,"correct":22},"合同评审过程",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":20,"analysis":33},384100,"项目管理计划应整合其他规划过程的所有子计划和基准，一经确定即成为项目的基准。在项目管理中通常将（ ）合并为一个绩效测量基准，这些基准可应用于挣值测量从而判断项目的整体绩效。",[336,338,340,342],{"key":20,"text":337,"correct":22},"范围基准、成本基准、进度基准",{"key":24,"text":339,"correct":26},"质量基准、成本基准、范围基准",{"key":28,"text":341,"correct":26},"质量基准、进度基准、范围基准",{"key":31,"text":343,"correct":26},"质量基准、进度基准、成本基准",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":28,"analysis":33},384101,"（ ）不属于项目成本预算的输入。",[348,350,352,354],{"key":20,"text":349,"correct":26},"项目范围说明书",{"key":24,"text":351,"correct":26},"工作分解结构",{"key":28,"text":353,"correct":22},"项目资金需求",{"key":31,"text":355,"correct":26},"项目进度计划",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":31,"analysis":33},384102,"关于挣值规则，不正确的是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":26},"需要规定用于绩效测量的挣值管理规则。",{"key":24,"text":363,"correct":26},"定义WBS中用于绩效测量的控制账户",{"key":28,"text":365,"correct":26},"确定拟用的挣值测量技术",{"key":31,"text":367,"correct":22},"通常用于偏离基准计划的百分数来表示",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},384103,"甲公司生产急需5000个零件，承包给乙工厂进行加工，每个零件的加工费预算为20元，计划2周（每周工作5天）完成。甲公司负责人在开工后第9天早上到乙工厂检查进度，发现己完成加工3600个零件，支付款项81000元。经计算（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":26},"该项目的费用偏差为-18000元",{"key":24,"text":375,"correct":26},"该项目的进度偏差-18000元",{"key":28,"text":377,"correct":26},"该项目的CPI为0.80",{"key":31,"text":379,"correct":22},"该项目的SPI为0.90",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":28,"analysis":33},384104,"下面关于项目成本预算及作用正确的是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":26},"成本预算不能确定衡量项目绩效情况的总体成本基准",{"key":24,"text":387,"correct":26},"项目范围说明书没有提供汇总预算",{"key":28,"text":389,"correct":22},"成本预算是在项目成本估算基础上的",{"key":31,"text":391,"correct":26},"成本预算是将未批准的项目总的估算成本进行分摊",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":31,"analysis":33},384105,"下列关于成本预算输出错误的是（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":26},"A. WBS各组件的CV、SV、CPI、SOI、TCPI、VAC值，都需要记录下来，并传达给干系人。",{"key":24,"text":399,"correct":26},"无论是计算得出的EA还是自下而上估算的EAC值，都需要记录下来传达给干系人。",{"key":28,"text":401,"correct":26},"变更请求需经过实施整体变更控制的审查和处理。",{"key":31,"text":403,"correct":22},"项目管理计划中可能需要更新的内容包括成本基准和成本计划。",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":28,"analysis":33},384106,"项目计划工期为4年，预算总成本为800万元。在项目的实施过程中，通过对成本的核算和有关成本与进度的记录得知，开工后第2年末实际成本发生额为200万元，所完成工作的计划预算成本额为100万元。与项目预算成本比较可知：当工期过半时，项目的计划成本发生额应该为400万元。此时如果不采取任何纠正措施，照此速度发展下去，那么到开工后第4年末项目会出现（ ）万元的成本超支。",[408,410,412,414],{"key":20,"text":409,"correct":26},"50",{"key":24,"text":411,"correct":26},"100",{"key":28,"text":413,"correct":22},"200",{"key":31,"text":415,"correct":26},"400",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},384107,"项目成本预算的特征不包括（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"精确性",{"key":24,"text":423,"correct":26},"计划性",{"key":28,"text":425,"correct":26},"约束性",{"key":31,"text":427,"correct":26},"控制性",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},384108,"以下不属于项目成本失控原因的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":26},"对工程项目认识不足",{"key":24,"text":435,"correct":22},"人员配备不齐",{"key":28,"text":437,"correct":26},"方法问题",{"key":31,"text":439,"correct":26},"项目成本管理的过程",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},384109,"一个项目经理和他的团队正在使用鱼骨图（Ishikawa图）讨论所发现的一个重大质量问题的原因，这属于质量管理中的（ ）",[444,446,448,450],{"key":20,"text":445,"correct":26},"质量计划编制",{"key":24,"text":447,"correct":26},"质量工具",{"key":28,"text":449,"correct":26},"质量保证",{"key":31,"text":451,"correct":22},"质量控制",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},384110,"制定质量管理计划的主要依据是质量方针、项目范围说明书、产品描述以及（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":26},"质量检查表",{"key":24,"text":459,"correct":26},"过程改进计划",{"key":28,"text":461,"correct":22},"质量标准与规则",{"key":31,"text":463,"correct":26},"需求变更请求",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":31,"analysis":33},384111,"确定使用于项目的质量标准并决定如何满足这些标准是（ ）过程的主要功能。",[468,470,471,473],{"key":20,"text":469,"correct":26},"质量目标",{"key":24,"text":449,"correct":26},{"key":28,"text":472,"correct":26},"质量方针",{"key":31,"text":474,"correct":22},"质量计划",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},384112,"（ ）可以作为项目质量控制中问题识别和问题分析的工具。",[479,481,483,485],{"key":20,"text":480,"correct":26},"帕累托分析",{"key":24,"text":482,"correct":26},"直方图",{"key":28,"text":484,"correct":26},"核对表",{"key":31,"text":486,"correct":22},"因果分析",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":31,"analysis":33},384113,"下列关于规划质量管理输出说法错误的是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":26},"规划质量管理输出包含. 质量管理计划、过程改进计划。",{"key":24,"text":494,"correct":26},"质量管理计划可以是正式的，也可以是非正式的。",{"key":28,"text":496,"correct":26},"过程改进计划是项目管理计划的子计划或组成部分。",{"key":31,"text":498,"correct":22},"质量测量指标专用于描述项目或产品属性，以及控制质量过程将如何对属性进行测量。通过测量，得到大约数值。",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":31,"analysis":33},384114,"关于实施质量保证输入的说法错误的是（ ）。",[503,505,507,509],{"key":20,"text":504,"correct":26},"质量管理计划描述了项目质量保证和持续过程改进的方法。",{"key":24,"text":506,"correct":26},"项目的质量保证活动应该支持并符合执行组织的过程改进计划。",{"key":28,"text":508,"correct":26},"质量测量指标提供了应该被测量的属性和允许的偏差。",{"key":31,"text":510,"correct":22},"项目文件不会影响质量保证工作，应该放在配置管理系统内监控。",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},384115,"质量控制测量结果是对质量控制活动的（ ）的书面记录。应该以规划质量管理过程所确定的格式加以记录。",[515,517,519,521],{"key":20,"text":516,"correct":22},"结果",{"key":24,"text":518,"correct":26},"过程",{"key":28,"text":520,"correct":26},"方式",{"key":31,"text":522,"correct":26},"对象",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":28,"analysis":33},384116,"项目质量管理过程的作用是（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":26},"为了梳理清楚整个过程的输入、工具与技术。",{"key":24,"text":530,"correct":26},"为了描述清楚本过程的数据流向图。",{"key":28,"text":532,"correct":22},"为整个项目中如何管理和确认质量提供了指南和方向。",{"key":31,"text":534,"correct":26},"识别项目及其可交付成果的质量要求和标准。",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},384117,"实施质量保证输出包括变更请求、项目管理计划更新、项目文件更新、组织过程资产更新，下列不属于项目管理计划更新的是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":26},"质量管理计划",{"key":24,"text":542,"correct":22},"成员管理计划",{"key":28,"text":544,"correct":26},"进度管理计划",{"key":31,"text":546,"correct":26},"成本管理计划",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},384118,"下列关于质量审计的说法错误的是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"质量审计可确认未批准的变更请求的实施情况。",{"key":24,"text":554,"correct":26},"质量审计可以是事先安排，也可以随机进行。",{"key":28,"text":556,"correct":26},"质量审计的目标之一是识别全部正在实施的良好及最佳实践。",{"key":31,"text":558,"correct":26},"质量审计是对具体质量管理活动的结构性评审。",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":28,"analysis":33},384119,"ISO9000标准提供（ ）",[563,565,567,569],{"key":20,"text":564,"correct":26},"关于如何生产产品的描述",{"key":24,"text":566,"correct":26},"执行质量系统的细节",{"key":28,"text":568,"correct":22},"质量系统的框架",{"key":31,"text":570,"correct":26},"保证客户得到好产品所必须的最大化需求",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":31,"analysis":33},384120,"（ ）是编制质量规划的首要工作。",[575,577,579,581],{"key":20,"text":576,"correct":26},"需找影响质量的因素",{"key":24,"text":578,"correct":26},"研究项目产品说明书",{"key":28,"text":580,"correct":26},"确定质量度量指标",{"key":31,"text":582,"correct":22},"识别相关质量标准",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":31,"analysis":33},384121,"在项目质量计划编制过程常用的工具和技术中（ ）是将实际实施过程中或计划之中的项目做法同其他类似项目的实际做法进行比较，改善与调高项目的质量。",[587,589,591,593],{"key":20,"text":588,"correct":26},"成本\u002F效益分析",{"key":24,"text":590,"correct":26},"实验设计",{"key":28,"text":592,"correct":26},"质量成本",{"key":31,"text":594,"correct":22},"基准分析",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":20,"analysis":33},384122,"项目质量管理由（ ）组成，是项目管理的重要组成部分，包括确定质量政策、目标与职责的各过程和活动，从而使项目满足其预定的需求。",[599,600,602,604],{"key":20,"text":518,"correct":22},{"key":24,"text":601,"correct":26},"活动",{"key":28,"text":603,"correct":26},"需求",{"key":31,"text":605,"correct":26},"质量",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":28,"analysis":33},384123,"某公司的质量目标是每千行代码缺陷数不大于2.5个，项目组为确保目标的达成，并对软件开发项目组5个代码编写人员各自的质量进行趋势分析，适合使用的质量工具是（ ）.",[610,612,614,616],{"key":20,"text":611,"correct":26},"散点图",{"key":24,"text":613,"correct":26},"矩阵图",{"key":28,"text":615,"correct":22},"控制图",{"key":31,"text":617,"correct":26},"亲和图",[619,623,626,629,632,635],{"id":620,"name":621,"category":7,"favorite":622},136,"法律职业试卷二(客观题 )",2,{"id":624,"name":625,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":627,"name":628,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":630,"name":631,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":633,"name":634,"category":7,"favorite":8},28,"安全工程师",{"id":636,"name":637,"category":7,"favorite":8},112,"安全生产法律知识"]