[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,3,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,381,393,405,416,428,440,452,464,476,486,498,510,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},384024,1,"单选题","结束项目或阶段的输出包括最终产品、服务或输出移交和组织过程资产更新，下列不属于组织过程资产更新的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","项目档案",false,{"key":24,"text":25,"correct":26},"B","项目审计",true,{"key":28,"text":29,"correct":22},"C","项目或阶段收尾文件",{"key":31,"text":32,"correct":22},"D","历史信息","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},384025,"以下关于实施整体变更控制的输出的说法错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"全部变更请求的处理结果，只有批准，才能在变更日志中更新。",{"key":24,"text":41,"correct":22},"变更日志用来记录项目过程中出现的变更。",{"key":28,"text":43,"correct":22},"项目管理计划中可能需要更新的内容至少包括. 各个子计划、受制于正式变更控制过程的基准等。",{"key":31,"text":45,"correct":22},"作为实施整体变更控制过程的结果，可能需要更新的项目文件包括. 受制于项目正式变更控制过程的所有文件。",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},384026,"项目章程发布的目标一般不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"使项目与组织的日常经营联系起来",{"key":24,"text":53,"correct":22},"进一步确定客户的商业需求，以及对客户需求的理解",{"key":28,"text":55,"correct":22},"为项目经理使用组织资源进行项目活动进行授权",{"key":31,"text":57,"correct":26},"确认项目团队成员的具体任务分工",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},384027,"关于监控项目工作说法错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"监控项目工作输入包括项目管理计划、进度预测、成本预测、确认的变更、工作绩效信息。",{"key":24,"text":65,"correct":22},"监控项目工作工具与技术包括分析技术、项目管理信息系统、会议。",{"key":28,"text":67,"correct":22},"监控项目工作的输出包括变更请求、工作绩效报告、项目管理计划更新、项目文件更新。",{"key":31,"text":69,"correct":26},"分析技术只包括分组方法和预测方法。",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},384028,"（ ）不属于项目监控的工作内容。",[74,76,78,80],{"key":20,"text":75,"correct":22},"随时收集干系人需求",{"key":24,"text":77,"correct":26},"分析项目风险",{"key":28,"text":79,"correct":22},"测量项目绩效",{"key":31,"text":81,"correct":22},"分发绩效信息",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},384029,"（ ）指的是为确保项目工作的未来绩效符合项目管理计划进行的有目的的活动。",[86,88,90,92],{"key":20,"text":87,"correct":22},"纠正措施",{"key":24,"text":89,"correct":26},"预防措施",{"key":28,"text":91,"correct":22},"缺陷补救",{"key":31,"text":93,"correct":22},"功能完善",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},384030,"项目章程的主要内容包括（ ）①项目目的或批准项目的理由②项目的主要风险③项目的总体预算④项目总体里程碑进度计划⑤项目范围说明书⑥项目成本基准",[98,100,102,104],{"key":20,"text":99,"correct":22},"①②③⑥",{"key":24,"text":101,"correct":26},"①②③④",{"key":28,"text":103,"correct":22},"①③④⑤",{"key":31,"text":105,"correct":22},"①④⑤⑥",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},384031,"以下关于项目管理计划编制的理解中，正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"项目经理应组织并主要参与项目管理计划的编制，但不应独立编制",{"key":24,"text":113,"correct":22},"项目管理计划的编制不能采用迭代的方法",{"key":28,"text":115,"correct":22},"让项目干系人参与项目计划的编制，增加了沟通成本，应尽量避免",{"key":31,"text":117,"correct":22},"项目管理计划不能是概括的，应该是详细、具体的",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},384032,"某项目经理正在为一个新产品开发项目制订项目管理计划，他应该遵循的基本原则中不包括（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"逐步精确细化",{"key":24,"text":125,"correct":26},"技术工作与管理工作相分离",{"key":28,"text":127,"correct":22},"各干系人参与",{"key":31,"text":129,"correct":22},"对相关人员与资源统一组织及管理",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},384033,"项目收尾是项目管理的重要环节，为了指导收尾涉及的所有管理活动和安排相应资源，项目经理应制定（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"合同收尾规程",{"key":24,"text":137,"correct":26},"管理收尾规程",{"key":28,"text":139,"correct":22},"产品收尾计划",{"key":31,"text":141,"correct":22},"项目验收计划",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},384034,"引导技术是指团队领导者诱发团队成员积极参与活动的方法，来帮助团队和个人完成相关项目活动，（ ）一般不作为引导技术在项目中应用",[146,148,150,152],{"key":20,"text":147,"correct":26},"专家判断",{"key":24,"text":149,"correct":22},"头脑风暴",{"key":28,"text":151,"correct":22},"冲突处理",{"key":31,"text":153,"correct":22},"会议管理",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},384035,"整合者是项目经理承担的重要角色之一，作为整合者，其主要工作不包括（ ）",[158,160,162,164],{"key":20,"text":159,"correct":22},"通过与项目干系人主动、全面的沟通，来了解他们对项目的需求",{"key":24,"text":161,"correct":22},"在相互竞争的众多干系人之间寻找平衡点",{"key":28,"text":163,"correct":22},"通过认真，细致的协调，来达到各种需求间的整合与平衡",{"key":31,"text":165,"correct":26},"将不同厂商的产品、技术进行整合",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},384036,"关于项目管理计划的说法错误的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"项目管理计划包括每个特定项目管理过程的实施程度。",{"key":24,"text":173,"correct":26},"项目管理计划中与项目经理进行沟通的要求和技术。",{"key":28,"text":175,"correct":22},"项目管理计划可以是概括的或详细的，可以包含一个或多个辅助计划。",{"key":31,"text":177,"correct":22},"项目管理计划是用于管理项目的主要文件之一，同时使用其他项目文件。",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},384037,"工作进度进展、资源使用情况属于管理项目工作输出的哪项内容（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"可交付成果",{"key":24,"text":185,"correct":26},"工作绩效数据",{"key":28,"text":187,"correct":22},"变更请求",{"key":31,"text":189,"correct":22},"项目文件更新",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},384038,"关于项目章程的作用说法错误的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"确定项目经理，规定项目经理的权力。",{"key":24,"text":197,"correct":26},"确定项目，给项目成员分配合理工作。",{"key":28,"text":199,"correct":22},"规定项目的总体目标，包括范围、时间、成本和质量等。",{"key":31,"text":201,"correct":22},"通过叙述启动项目的理由，把项目与执行组织的日常经营运作及战略计划等联系起来。",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},384039,"不能作为检验WBS是否定义完全，项目的所有任务是否都被完全分解的依据是（ ）",[206,208,210,212],{"key":20,"text":207,"correct":22},"是否明确定义了每个任务的开始和结束",{"key":24,"text":209,"correct":22},"是否每个任务都有一个可交付的成果",{"key":28,"text":211,"correct":22},"是否容易估算成本",{"key":31,"text":213,"correct":26},"是否明确了变更申请",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},384040,"通常把被批准的详细的项目范围说明书和与之相关的（ ）作为项目的范围基准，并在整个项目的生命期内对之进行监控、核实和确认。",[218,220,222,224],{"key":20,"text":219,"correct":22},"产品需求",{"key":24,"text":221,"correct":22},"项目管理计划",{"key":28,"text":223,"correct":26},"WBS以及WBS字典",{"key":31,"text":225,"correct":22},"合同",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},384041,"项目范围管理过程包括：范围计划、（ ）、创建WBS、范围确认、范围控制5个主要过程。",[230,232,234,236],{"key":20,"text":231,"correct":22},"需求管理",{"key":24,"text":233,"correct":26},"范围定义",{"key":28,"text":235,"correct":22},"范围变更",{"key":31,"text":237,"correct":22},"编制范围说明书",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},384042,"详细的项目范围说明书是指导项目成功实施的关键文件。（ ）不应该属于范围定义的输入。",[242,244,246,248],{"key":20,"text":243,"correct":22},"项目章程",{"key":24,"text":245,"correct":22},"项目范围管理计划",{"key":28,"text":247,"correct":26},"批准的变更申请",{"key":31,"text":249,"correct":22},"项目合同文本",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},384043,"在项目范围确认时，经常会使用群体决策技术，在以下群体决策技术中（ ）是根据群体中超过50%人员的意见作出决策。",[254,256,258,260],{"key":20,"text":255,"correct":22},"一致同意原则",{"key":24,"text":257,"correct":26},"大多数原则",{"key":28,"text":259,"correct":22},"相对数原则",{"key":31,"text":261,"correct":22},"独裁原则",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},384044,"以下对需求文件内容说法错误的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"业务需求、干系人需求、解决方案需求",{"key":24,"text":269,"correct":22},"业务需求、干系人需求、项目需求",{"key":28,"text":271,"correct":26},"干系人需求、安全需求、过渡需求",{"key":31,"text":273,"correct":22},"干系人需求、项目需求、过渡需求",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},384045,"不属于确认项目范围对项目管理重要性的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"清楚了项目的工作具体范围和具体工作内容，为提高成本、时间和资源估算的准确性提供了基础。",{"key":24,"text":281,"correct":22},"项目范围既然是确定要完成哪些具体的工作，项目范围基准是确定项目进度测量和控制的基准。",{"key":28,"text":283,"correct":26},"项目范围管理在项目范围不清楚的情况下，成本和质量也可以进行核算。",{"key":31,"text":285,"correct":22},"项目范围的确定就是确定了项目的具体工作任务，有助于清楚的责任划分和责任分配。",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},384046,"一般而言，项目的范围确定后，项目的三个基本目标是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":26},"时间、成本、质量标准",{"key":24,"text":293,"correct":22},"时间、功能、成本",{"key":28,"text":295,"correct":22},"成本、功能、质量标准",{"key":31,"text":297,"correct":22},"时间、功能、质量标准",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":28,"analysis":33},384047,"在系统建设后期，建设方考虑到系统运维管理问题，希望增加8课时的IT服务管理方面的知识培训，承建方依此要求进行了范围变更。在对范围变更进行验证时，验证准则是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"学员签到表",{"key":24,"text":305,"correct":22},"安排一次考试，以测验分数",{"key":28,"text":307,"correct":26},"新批准的培训工作方案",{"key":31,"text":309,"correct":22},"培训范围变更请求",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},384048,"以下不属于项目范围管理主要过程的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"编制范围管理计划过程，对如何定义、确认和控制项目范围的过程进行描述",{"key":24,"text":317,"correct":22},"创建工作分解结构",{"key":28,"text":319,"correct":26},"工作监督",{"key":31,"text":321,"correct":22},"范围控制",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},384049,"以下关于创建工作分解结构（WBS）的叙述中，（ ）是不准确的。",[326,328,330,332],{"key":20,"text":327,"correct":22},"当前较常用的工作分解结构表示形式主要有分级的树型结构和列表",{"key":24,"text":329,"correct":26},"WBS最低层次的工作单元是工作包，业内一般把1个人1周能干完的工作称为一个工作包",{"key":28,"text":331,"correct":22},"创建WBS的输入包括详细的项目范围说明书、项目管理计划、组织过程资产",{"key":31,"text":333,"correct":22},"创建WBS的输出包括WBS和WBS字典、范围基准、更新的项目管理计划",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},384050,"以下关于工程项目范围确认与质量控制的表述中，正确的是（ ）",[338,340,342,344],{"key":20,"text":339,"correct":26},"范围确认是有关工作结果的可接受问题，质量控制是有关工作结果是否满足质量需求的问题",{"key":24,"text":341,"correct":22},"范围确认与质量控制相同",{"key":28,"text":343,"correct":22},"质量控制通常是在范围确认之前进行，这2个过程是串行执行的",{"key":31,"text":345,"correct":22},"范围确认的输入包含项目分解结构字典，质量控制输入不包含项目分解结构字典",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":28,"analysis":33},384051,"以下关于项目范围和产品范围的叙述中，不正确的是：（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"项目范围是为了获得具有规定特性和功能的产品、服务和结果，而必须完成的项目工作",{"key":24,"text":353,"correct":22},"产品范围是表示产品、服务和结果的特性和功能",{"key":28,"text":355,"correct":26},"项目范围是否完成以产品要求作为衡量标准",{"key":31,"text":357,"correct":22},"项目的目标是项目范围管理计划编制的一个基本依据",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},384052,"某项目工期为一年，项目经理对负责项目工作分解结构编制的小张提出了如下要求或建议，其中（ ）是不妥当的。",[362,364,366,368],{"key":20,"text":363,"correct":26},"应该在2周内把全年工作都分解到具体工作包",{"key":24,"text":365,"correct":22},"可根据项目生命周期的阶段进行第一层分解，而把可交付物安排在第二层",{"key":28,"text":367,"correct":22},"可考虑以一个人80小时能完成的工作作为一个工作包",{"key":31,"text":369,"correct":22},"可采用树形结构和列表形式相结合的方式进行分解",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":28,"analysis":33},384053,"下面不属于项目范围确认的输入的是（ ）。",[374,375,377,379],{"key":20,"text":221,"correct":22},{"key":24,"text":376,"correct":22},"需求文件、需求跟踪矩阵",{"key":28,"text":378,"correct":26},"工作绩效信息",{"key":31,"text":380,"correct":22},"核实的可交付成果",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":31,"analysis":33},384054,"关于项目范围控制说法错误的是（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"范围控制是监督项目和产品的范围状态，管理范围基准变更的过程。",{"key":24,"text":388,"correct":22},"范围控制过程应该与其他控制过程协调开展。",{"key":28,"text":390,"correct":22},"范围控制的作用是在整个项目期间保持对范围基准的维护。",{"key":31,"text":392,"correct":26},"范围控制的好的话，变更是可以避免的。",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":31,"analysis":33},384055,"以下关于项目范围控制与用户需求变更的联系说法错误的是（ ）。",[397,399,401,403],{"key":20,"text":398,"correct":22},"用户的需求变更必须控制在可控范围之内。",{"key":24,"text":400,"correct":22},"如果项目团队缺乏明确的需求变更管理控制及范围管理控制，非常容易导致项目的失控。",{"key":28,"text":402,"correct":22},"需求基线定义了项目的范围。",{"key":31,"text":404,"correct":26},"需求基线是固定的，不需要根据少量需求变更而改变。",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":24,"analysis":33},384056,"以下不属于范围定义的输入的是（ ）。",[409,411,413,414],{"key":20,"text":410,"correct":22},"范围管理计划",{"key":24,"text":412,"correct":26},"项目需求",{"key":28,"text":243,"correct":22},{"key":31,"text":415,"correct":22},"需求文件",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},384057,"（ ）描述了项目范围的形成过程。",[420,422,424,426],{"key":20,"text":421,"correct":26},"它在项目的早期被描述出来并随着项目的进展而更加详细",{"key":24,"text":423,"correct":22},"它是在项目章程中被定义并且随着项目的进展进行必要的变更",{"key":28,"text":425,"correct":22},"在项目早期，项目范围包含某些特定的功能和其他功能，并且随着项目的进展添加更详细的特征",{"key":31,"text":427,"correct":22},"它是在项目的早期被描述出来并随着范围的蔓延而更加详细",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},384058,"范围控制的目的是监控项目的状态，如“项目的工作范围状态和产品范围状态”，范围控制不涉及（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"影响导致范围变更的因素",{"key":24,"text":435,"correct":22},"确保所有被请求的变更按照项目整体变更控制过程处理",{"key":28,"text":437,"correct":22},"范围变更发生时管理实际的变更",{"key":31,"text":439,"correct":26},"确定范围变更是否已经发生",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},384059,"关于项目管理计划的输入、输出，下面说法错误的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"依据项目管理计划中已批准的子计划来创建范围管理计划，会对用于规划和管理项目范围的方法产生影响。",{"key":24,"text":447,"correct":22},"项目章程提供了高层级的项目描述和产品特征。",{"key":28,"text":449,"correct":22},"范围管理计划是制订项目管理计划过程和其他范围管理过程的主要依据。",{"key":31,"text":451,"correct":26},"根据项目要求，范围管理计划必须是正式的，非常详细的。",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},384060,"以下不属于范围管理计划管理过程的是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":26},"规划、跟踪和报告各种需求活动",{"key":24,"text":459,"correct":22},"制定详细项目范围说明书",{"key":28,"text":461,"correct":22},"维护和批准工作分解结构（WBS）",{"key":31,"text":463,"correct":22},"正式验收已完成的项目可交付成果",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":31,"analysis":33},384061,"范围核实是指（ ）",[468,470,472,474],{"key":20,"text":469,"correct":22},"改善成本和进度的精确性，特别是对于应用革新技术的项目",{"key":24,"text":471,"correct":22},"是一个项目交给客户前的最后活动",{"key":28,"text":473,"correct":22},"记录项目曾承诺要具有的产品或服务的特征",{"key":31,"text":475,"correct":26},"与质量控制不同，范围核实所关心的是接受而不是纠正工作结果",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},384062,"在项目实施过程中，项目经理通过项目周报中的项目进度分析图表发现机房施工进度有延期风险。项目经理立即组织相关人员进行分析，下达了关于改进措施的书面指令。该指令属于（ ）。",[480,482,484,485],{"key":20,"text":481,"correct":22},"检查措施",{"key":24,"text":483,"correct":22},"缺陷补救措施",{"key":28,"text":89,"correct":26},{"key":31,"text":87,"correct":22},{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},384063,"以下关于关键路径法的叙述，（ ）是不正确的。",[490,492,494,496],{"key":20,"text":491,"correct":22},"如果关键路径中的一个活动延迟，将会影响整个项目计划",{"key":24,"text":493,"correct":26},"关键路径包括所有项目进度控制点",{"key":28,"text":495,"correct":22},"如果有两个或两个以上的路径长度一样，就有可能存在多个关键路径",{"key":31,"text":497,"correct":22},"关键路径可随项目的进展而改变",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":28,"analysis":33},384064,"以下关于规划项目进度管理的输入说法错误的是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"项目管理计划中用于制定进度管理计划的信息包括范围基准和其他信息。",{"key":24,"text":505,"correct":22},"项目章程中规定的总体里程碑进度计划和项目审批要求，都会影响项目的进度管理。",{"key":28,"text":507,"correct":26},"会影响规划进度管理过程的组织过程资产不包括历史信息。",{"key":31,"text":509,"correct":22},"会影响规划进度管理过程事业环境因素包括组织中的工作授权系统。",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},384065,"项目经理对某软件开发流程中的“概要设计”活动进行历时估算时，参考了以往相关项目活动情况，他采用的是（ ）方法",[514,515,517,519],{"key":20,"text":147,"correct":22},{"key":24,"text":516,"correct":26},"类比估算",{"key":28,"text":518,"correct":22},"参数估算",{"key":31,"text":520,"correct":22},"三点估算",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},384066,"关于控制进度的输入说法错误的是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"进度基准用于判断是否需要进行变更、采取纠正措施或采取预防措施。",{"key":24,"text":528,"correct":26},"关于项目进展情况的信息是项目日历。",{"key":28,"text":530,"correct":22},"在控制进度过程中需要对进度数据进行审查和更新。",{"key":31,"text":532,"correct":22},"会影响控制进度过程的组织过程资产包括进度控制工具、可用的监督和报告方法。",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},384067,"关于估算活动持续时间的输入说法错误的是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"估算的活动资源需求会对活动持续时间产生影响。",{"key":24,"text":540,"correct":22},"资源日历中的资源可用性、资源类型和资源性质，都会影响活动的持续时间。",{"key":28,"text":542,"correct":22},"在估算活动持续时间时，需要考虑项目范围说明书中所列的假设条件和制约因素。",{"key":31,"text":544,"correct":26},"风险登记册只提供风险清单，不会对风险分析和应对规划提供结果。",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":28,"analysis":33},384068,"活动排序的工具和技术有多种，工具和技术的选取由若干因素决定。如果项目经理决定在进度计划编制中使用标准化的项目进度网络图，这可能因为（ ）",[549,551,553,555],{"key":20,"text":550,"correct":22},"该项目非常独特，在不同的阶段需要专门的网络图",{"key":24,"text":552,"correct":22},"在现有网络上具有可以获取的资源管理软件",{"key":28,"text":554,"correct":26},"在项目中包含几个相同或几乎相同的可交付成果",{"key":31,"text":556,"correct":22},"项目中存在多条关键路径",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":31,"analysis":33},384069,"关于定义活动的输入错误的是（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"项目进度管理计划中规定了管理项目工作所需的细致程度。",{"key":24,"text":564,"correct":22},"在定义活动时，需明确考虑范围基准中的WBS、可交付成果、制约因素和假设条件。",{"key":28,"text":566,"correct":22},"能够影响定义活动过程的组织过程资产包括标准化的流程。",{"key":31,"text":568,"correct":26},"会影响定义活动过程的事业环境因素不包括项目管理信息系统。",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":31,"analysis":33},384070,"某项目经理正在进行活动资源估算，他可以采用的方法或技术中不包括（ ）",[573,575,577,579],{"key":20,"text":574,"correct":22},"己有案例的估算数据",{"key":24,"text":576,"correct":22},"项目管理软件",{"key":28,"text":578,"correct":22},"多方案分析",{"key":31,"text":580,"correct":26},"储备分析",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":28,"analysis":33},384071,"活动资源估算的输出不包括（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"资源分解结构",{"key":24,"text":588,"correct":22},"请求的变更",{"key":28,"text":590,"correct":26},"项目进度网络图",{"key":31,"text":592,"correct":22},"资源日历",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":20,"analysis":33},384072,"三点估算中，PERT使用的3种估算值有最乐观时间、最悲观时间和（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":26},"最可能时间",{"key":24,"text":600,"correct":22},"最长时间",{"key":28,"text":602,"correct":22},"最短时间",{"key":31,"text":604,"correct":22},"最保守时间",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":28,"analysis":33},384073,"在下面的项目网络图中（时间单位为天），活动B的自由时差和总时差分别为0、1，如果活动A的实际开始时间是5月1日早8时，在不延误项目工期的情况下，活动B最晚应在（ ）前结束。",[609,611,613,615],{"key":20,"text":610,"correct":22},"5月5日早8时",{"key":24,"text":612,"correct":22},"5月6日早8时",{"key":28,"text":614,"correct":26},"5月7日早8时",{"key":31,"text":616,"correct":22},"5月8日早8时",[618,622,625,628,631,634],{"id":619,"name":620,"category":7,"favorite":621},136,"法律职业试卷二(客观题 )",2,{"id":623,"name":624,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":626,"name":627,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":629,"name":630,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":632,"name":633,"category":7,"favorite":8},28,"安全工程师",{"id":635,"name":636,"category":7,"favorite":8},112,"安全生产法律知识"]