[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":566},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,28,50,1397,[13,34,46,58,70,82,94,106,118,130,140,152,164,176,188,200,212,224,236,248,260,272,284,296,308,320,329,341,353,365,377,389,401,410,422,434,446,458,470,478,490,502,514,522,531,543,555],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},385279,1,"单选题","项目目标包括成果性目标和( )目标，后者也叫管理性目标。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","建设性",false,{"key":24,"text":25,"correct":26},"B","约束性",true,{"key":28,"text":29,"correct":22},"C","指导性",{"key":31,"text":32,"correct":22},"D","原则性","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},385280,"在几种不同类型的软件维护中，通常情况下（）所占的工作量最大",[38,40,42,44],{"key":20,"text":39,"correct":22},"更正性维护",{"key":24,"text":41,"correct":22},"适应性维护",{"key":28,"text":43,"correct":26},"完善性维护",{"key":31,"text":45,"correct":22},"预防性维护",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},385281,"某公司计划开发一个新的集成系统，该系统需求不明确，事先不能明确定义需求，需要先做原型来进行逐次确认和交付，该系统的生命周期模型宜采用( )",[50,52,54,56],{"key":20,"text":51,"correct":22},"瀑布模型",{"key":24,"text":53,"correct":22},"V 模型",{"key":28,"text":55,"correct":26},"原型化模型",{"key":31,"text":57,"correct":22},"迭代模型",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},385282,"某单位有很多项目机会但没有足够的资源来完成所有的项目，这就需要项目经理领导团队来建立一个筛选和确定项目优先级的方法。在建立项目筛选模型的众多准则中，此时最重要的准则是待开发的系统 （ ） 。",[62,64,66,68],{"key":20,"text":63,"correct":22},"功能强大",{"key":24,"text":65,"correct":22},"容易使用",{"key":28,"text":67,"correct":26},"容易实现",{"key":31,"text":69,"correct":22},"成本低廉",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},385283,"项目具有临时性、独特性与渐进明细的特点,其中渐进明细性指( )",[74,76,78,80],{"key":20,"text":75,"correct":22},"项目的工期短",{"key":24,"text":77,"correct":22},"每个项目都有明确的开始与结束时间",{"key":28,"text":79,"correct":26},"项目的成果性目标是逐步完成的",{"key":31,"text":81,"correct":22},"项目经理可以随时取消项目",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},385284,"在( )组织结构中,项目没有独立的项目团队,项目经理在调用与项目相关的资源时必需要向职能经理汇报。",[86,88,90,92],{"key":20,"text":87,"correct":26},"职能型",{"key":24,"text":89,"correct":22},"平衡矩阵型",{"key":28,"text":91,"correct":22},"强矩阵型",{"key":31,"text":93,"correct":22},"项目型",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},385285,"在一个信息系统项目的V形生命周期模型中，系统测试是针对 （ ） 阶段做出的。",[98,100,102,104],{"key":20,"text":99,"correct":22},"需求分析",{"key":24,"text":101,"correct":26},"概要设计",{"key":28,"text":103,"correct":22},"详细设计",{"key":31,"text":105,"correct":22},"编码",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},385286,"项目管理过程中,( ）不完全属于规划过程组。",[110,112,114,116],{"key":20,"text":111,"correct":22},"规划范围管理、规划进度管理、规划成本管理",{"key":24,"text":113,"correct":22},"收集需求、范围定义、定义活动",{"key":28,"text":115,"correct":22},"规划质量管理、规划质量管理、规划人力资源管理",{"key":31,"text":117,"correct":26},"风险识别、规划风险应对、实施采购",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},385287,"（）拟订、编制和修订一个项目或项目阶段的工作目标、任务、工作计划方案、资源供应计划、成本预算、计划应急措施等工作。",[122,124,126,128],{"key":20,"text":123,"correct":22},"启动过程组",{"key":24,"text":125,"correct":26},"计划过程组",{"key":28,"text":127,"correct":22},"执行过程组",{"key":31,"text":129,"correct":22},"控制过程组",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},385288,"RUP模型是一种过程方法，它属于（）的一种。",[134,135,137,139],{"key":20,"text":51,"correct":22},{"key":24,"text":136,"correct":22},"V模型",{"key":28,"text":138,"correct":22},"螺旋模型",{"key":31,"text":57,"correct":26},{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},385289,"系统集成项目通过验收测试的主要标准为 （ ） 。",[144,146,148,150],{"key":20,"text":145,"correct":22},"所有测试项均未残留各等级的错误",{"key":24,"text":147,"correct":26},"需求文档定义的功能全部实现，非功能指标达到目标要求",{"key":28,"text":149,"correct":22},"立项文档、需求文档、设计文档与系统的实现和编码达到一致",{"key":31,"text":151,"correct":22},"系统通过单元测试和集成测试",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":28,"analysis":33},385290,"下列关于系统集成资质证书的叙述，正确的是 （ ） 。",[156,158,160,162],{"key":20,"text":157,"correct":22},"所有资质证书都由工业和信息化部审批",{"key":24,"text":159,"correct":22},"系统集成一、二级资质证书由部级评审机构审批，三、四级由地方评审机构审批",{"key":28,"text":161,"correct":26},"系统集成一、二级资质证书由工业和信息化部审批，三、四级由地方信息产业主管部门审批，报工业和信息化部备案",{"key":31,"text":163,"correct":22},"系统集成一、二级资质证书由工业和信息化部和部级评审机构审批，三、四级由地方信息产业主管部门和地方评审机构审批",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},385291,"信息系统集成资质等级评定条件主要从综合条件、业绩、管理能力、技术实力和人才实力5个方面进行描述。以下各项指标中，最能体现企业对系统集成项目实施和管理能力的指标是 （ ） 。",[168,170,172,174],{"key":20,"text":169,"correct":26},"项目经理数量",{"key":24,"text":171,"correct":22},"注册资金数目",{"key":28,"text":173,"correct":22},"近三年完成的系统集成项目总值",{"key":31,"text":175,"correct":22},"年平均研发经费总额",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},385292,"某项目经理正在为一个新产品开发项目制订项目管理计划，他应该遵循的基本原则中不包括()",[180,182,184,186],{"key":20,"text":181,"correct":22},"逐步精确细化",{"key":24,"text":183,"correct":26},"技术工作与管理工作相分离",{"key":28,"text":185,"correct":22},"各干系人参与",{"key":31,"text":187,"correct":22},"对相关人员与资源统一组织及管理",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":28,"analysis":33},385293,"在 中，项目经理的权力最小。",[192,194,196,198],{"key":20,"text":193,"correct":22},"强矩阵型组织",{"key":24,"text":195,"correct":22},"平衡矩阵组织",{"key":28,"text":197,"correct":26},"弱矩阵型组织",{"key":31,"text":199,"correct":22},"项目型组织",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},385294,"项目经理小王事后得知项目团队的一个成员已做了一个纠正措施，但是没有记录，小王接下来应该（）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"就该情况通知该成员的部门经理",{"key":24,"text":207,"correct":22},"撤销纠正措施",{"key":28,"text":209,"correct":22},"将该纠正行为记入文档",{"key":31,"text":211,"correct":26},"询问实施该纠正措施的理由",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},385295,"一般情况下，随着项目的逐渐进展，成本和人员投入水平呈现出①的态势，而项目干系人对于项目最终产品的特征和项目最终费用的影响会②，变更和缺陷修改的费用通常会③。①、②和③分别是()",[216,218,220,222],{"key":20,"text":217,"correct":26},"①先增后减，②逐渐减小，③逐渐增加",{"key":24,"text":219,"correct":22},"①先减后增，②逐渐增加，③逐渐减少",{"key":28,"text":221,"correct":22},"①先增后减，②逐渐增加，③逐渐增加",{"key":31,"text":223,"correct":22},"①先减后增，②逐渐减少，③逐渐减少",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},385296,"项目经理在需求调研的过程中，应尽可能的多了解客户的需求进行分析，并对需求进行分析，其做需求分析的目的一般不包括（ ）",[228,230,232,234],{"key":20,"text":229,"correct":22},"检测和解决需求之间的冲突",{"key":24,"text":231,"correct":26},"定义潜在的风险",{"key":28,"text":233,"correct":22},"发现软件的边界，以及软件与其环境如何交互",{"key":31,"text":235,"correct":22},"翻描述需求分析，以导出软件需求",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},385297,"RUP是信息系统项目的生命周期模型之一，“确保软件结构、需求、计划足够稳定；确保项目风险已经降低到能够预计完成整个项目的成本和日程的程度”是该模型（ ）阶段的主要任务。",[240,242,244,246],{"key":20,"text":241,"correct":22},"初始",{"key":24,"text":243,"correct":26},"细化",{"key":28,"text":245,"correct":22},"构建",{"key":31,"text":247,"correct":22},"交付",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},385298,"矩阵型组织的缺点不包括()",[252,254,256,258],{"key":20,"text":253,"correct":22},"管理成本增加",{"key":24,"text":255,"correct":26},"员工缺乏事业上的连续性和保障",{"key":28,"text":257,"correct":22},"多头领导",{"key":31,"text":259,"correct":22},"资源分配与项目优先的问题产生冲突",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},385299,"与例行工作相比，项目具有明显的特点。其中( ) 是指每一个 项目都有一个明确的开始时间与结束时间。",[264,266,268,270],{"key":20,"text":265,"correct":26},"临时性",{"key":24,"text":267,"correct":22},"按时性",{"key":28,"text":269,"correct":22},"独特性",{"key":31,"text":271,"correct":22},"渐进明细",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},385300,"信息系统审计的目的是评估并提供反馈，保证和建议。其关注之处可分为3类，分别是 （ ） 。",[276,278,280,282],{"key":20,"text":277,"correct":22},"保密性、及时性、完整性",{"key":24,"text":279,"correct":22},"可用性、及时性、准确性",{"key":28,"text":281,"correct":22},"保密性、准确性、完整性",{"key":31,"text":283,"correct":26},"可用性、保密性、完整性",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},385301,"企业信息化建设内容一般不包括 （ ） 。",[288,290,292,294],{"key":20,"text":289,"correct":22},"企业技术知识信息化",{"key":24,"text":291,"correct":26},"通用基础操作系统的研发",{"key":28,"text":293,"correct":22},"企业管理知识信息化",{"key":31,"text":295,"correct":22},"企业信息应用系统的采购",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},385302,"应用系统运行的安全管理中心，数据域安全是其中非常重要的内容，数据域安全包括 （ ） 。",[300,302,304,306],{"key":20,"text":301,"correct":26},"行级数据域安全，字段级数据域安全",{"key":24,"text":303,"correct":22},"系统性数据域安全，功能性数据域安全",{"key":28,"text":305,"correct":22},"数据资源安全，应用性数据安全",{"key":31,"text":307,"correct":22},"组织级数据域安全，访问性数据域安全",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},385303,"企业在信息化过程中，要形成高水平、稳定的信息化人才队伍，建立和完善信息化人才激励机制。这一做法符合信息化发展过程中的 （ ）。",[312,314,316,318],{"key":20,"text":313,"correct":22},"效益原则",{"key":24,"text":315,"correct":22},"“一把手”原则",{"key":28,"text":317,"correct":22},"中长期与短期建设相结合的原则",{"key":31,"text":319,"correct":26},"以人为本的原则",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},385304,"在（）中，项目经理权限最大。",[324,326,327,328],{"key":20,"text":325,"correct":22},"职能型组织",{"key":24,"text":197,"correct":22},{"key":28,"text":193,"correct":22},{"key":31,"text":199,"correct":26},{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},385305,"某系统集成商现正致力于过程改进，打算为过去的项目建立历史档案，现阶段完成该工作的最好方法是()",[333,335,337,339],{"key":20,"text":334,"correct":22},"建立项目计划",{"key":24,"text":336,"correct":26},"总结经验教训",{"key":28,"text":338,"correct":22},"绘制网络图",{"key":31,"text":340,"correct":22},"制定项目状态报告",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":28,"analysis":33},385306,"信息系统的生命周期可以分为立项、开发、运维及消亡四个阶段。 以下对各阶段的叙述中,不正确的是:( )。",[345,347,349,351],{"key":20,"text":346,"correct":22},"立项阶段:依需业务发展和经营管理的需要,提出建设信息系统的 初步构想, 对企业信息系统的需求进行深入调研和分析, 形成《需求 规格说明书》",{"key":24,"text":348,"correct":22},"开发阶段：通过系统分析,系统设计、系统实施、系统验收等工作 实现并交付系统",{"key":28,"text":350,"correct":26},"运维阶段:信息系统通过验收，正式移交给用户后的阶段。系统的 运行维护就是更正性维护",{"key":31,"text":352,"correct":22},"消亡阶段:信息系统不可避免地会遇到系统的更新改造甚至废弃重建等",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":28,"analysis":33},385307,"信息系统集成项目完成验收后要进行一个综合性的项目后评估, 评估的内容一般包括( )。",[357,359,361,363],{"key":20,"text":358,"correct":22},"系统目标评价、系统质量评价、系统技术评价、系统可持续性评价",{"key":24,"text":360,"correct":22},"系统社会效益评价、系统过程评价、系统技术评价、系统可用性评",{"key":28,"text":362,"correct":26},"系统目标评价、系统过程评价、系统效益评价、系统可持续性评价",{"key":31,"text":364,"correct":22},"系统责任评价、系统环境影响评价、系统效益评价、系统可持续性 评价",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},385308,"在项目实施过程中，项目经理通过项目周报中的项目进度分析图表发现机房施工进度有延期风险。项目经理立即组织相关人员进行分析，下达了关于改进措施的书面指令。该指令属于()",[369,371,373,375],{"key":20,"text":370,"correct":22},"检查措施",{"key":24,"text":372,"correct":22},"缺陷补救措施",{"key":28,"text":374,"correct":26},"预防措施",{"key":31,"text":376,"correct":22},"纠正措施",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":28,"analysis":33},385309,"（ ）不属于瀑布式开发模型的特点",[381,383,385,387],{"key":20,"text":382,"correct":22},"严格区分工作阶段，每个阶段有明确的任务和取得的成果",{"key":24,"text":384,"correct":22},"强调系统开发过程的整体性和局性",{"key":28,"text":386,"correct":26},"基于客户需求的演进，快速送代开发",{"key":31,"text":388,"correct":22},"系统开发过程工程化，文档资料标准化",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},385310,"从信息系统开发的角度来看，信息系统的生命周期包括（）",[393,395,397,399],{"key":20,"text":394,"correct":26},"立项、开发、运维、消亡",{"key":24,"text":396,"correct":22},"启动、计划、执行、控制和收尾",{"key":28,"text":398,"correct":22},"总体规划、系统分析、系统设计、系统实验、系统验收",{"key":31,"text":400,"correct":22},"招标、投标、执行合同、合同收尾",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},385311,"（ ）将整个软件开发流程分成多个阶段，每一个阶段都由目标设定、风险分析、开发和有效性验证以及评审构成。",[405,406,407,408],{"key":20,"text":138,"correct":26},{"key":24,"text":51,"correct":22},{"key":28,"text":136,"correct":22},{"key":31,"text":409,"correct":22},"原型模型",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":31,"analysis":33},385312,"监理机构应要求承建单位在事故发生后立即采取措施，尽可能控制其影响范围，并及时签发停工令，报()。",[414,416,418,420],{"key":20,"text":415,"correct":22},"监理单位技术负责人",{"key":24,"text":417,"correct":22},"项目总监理工程师",{"key":28,"text":419,"correct":22},"承建单位负责人",{"key":31,"text":421,"correct":26},"业主单位",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":20,"analysis":33},385313,"信息系统工程监理活动被概括为\"四控、三管、一协调\"，其中三管是指 （ ） 。",[426,428,430,432],{"key":20,"text":427,"correct":26},"合同管理、信息管理、安全管理",{"key":24,"text":429,"correct":22},"成本管理、进度管理、质量管理",{"key":28,"text":431,"correct":22},"整体管理、范围管理、沟通管理",{"key":31,"text":433,"correct":22},"采购管理、变更管理、风险管理",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":31,"analysis":33},385314,"项目生命周期定义了从项目开始直至结束的项目阶段，以下关于项目阶段的叙述中， （ ） 是不正确的。",[438,440,442,444],{"key":20,"text":439,"correct":22},"大多数项目生命周期定义的阶段顺序通常从技术上可以分为需求分析，系统设计，系统构建，系统运行四个阶段",{"key":24,"text":441,"correct":22},"按管理活动出现的先后，把项目的生命周期划分为启动、计划、执行和收尾四个典型阶段",{"key":28,"text":443,"correct":22},"在条件许可或涉及的风险可接受时，下一阶段可以在前一阶段结束前开始",{"key":31,"text":445,"correct":26},"根据实际需要，项目的阶段中可能只包含管理工作或只包含技术工作",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":31,"analysis":33},385315,"信息系统工程监理活动的主要内容被概括为“四控、三管、一协调”，其中“三管”是指",[450,452,454,456],{"key":20,"text":451,"correct":22},"整体管理、范围管理和安全管理",{"key":24,"text":453,"correct":22},"范围管理、进度管理和合同管理",{"key":28,"text":455,"correct":22},"进度管理、合同管理和信息管理",{"key":31,"text":457,"correct":26},"合同管理、信息管理和安全管理",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":20,"analysis":33},385316,"信息系统生命周期分为立项、开发、运维及消亡四个阶段。 （ ）不属于开发阶段的工作成果。",[462,464,466,468],{"key":20,"text":463,"correct":26},"需求规格说明书",{"key":24,"text":465,"correct":22},"系统逻辑模型",{"key":28,"text":467,"correct":22},"系统架构设计",{"key":31,"text":469,"correct":22},"系统业务流程分析",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":31,"analysis":33},385317,"某单位有很多项目机会但没有足够的资源来完成所有的项目，这就需要项目经理领导团队来建立一个筛选和确定项目优先级的方法。在建立项目筛选模型的众多准则中，此时最重要的准则是待开发的系统（ ）。",[474,475,476,477],{"key":20,"text":69,"correct":22},{"key":24,"text":63,"correct":22},{"key":28,"text":65,"correct":22},{"key":31,"text":67,"correct":26},{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":28,"analysis":33},385318,"对于 应实行旁站监理。",[482,484,486,488],{"key":20,"text":483,"correct":22},"工程薄弱环节",{"key":24,"text":485,"correct":22},"首道工序",{"key":28,"text":487,"correct":26},"隐蔽工程",{"key":31,"text":489,"correct":22},"上、下道工序交接环节",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},385319,"信息系统通过试运行，系统的各种问题都已经暴露在用户面前，这时通常可以考虑进入（）阶段。",[494,496,498,500],{"key":20,"text":495,"correct":26},"系统验收",{"key":24,"text":497,"correct":22},"系统维护",{"key":28,"text":499,"correct":22},"系统运营",{"key":31,"text":501,"correct":22},"系统试运行",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},385320,"以质量为中心的信息系统工程控制管理工作是由三方分工合作实施的，这三方不包括（） 。",[506,508,510,512],{"key":20,"text":507,"correct":22},"主建方",{"key":24,"text":509,"correct":22},"承建方",{"key":28,"text":511,"correct":26},"评测单位",{"key":31,"text":513,"correct":22},"监理单位",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":28,"analysis":33},385321,"在项目实施过程中，项目经理通过项目周报中的项目进度分析图表发现机房施工进度有延期风险。项目经理立即组织相关人员进行分析，下达了关于改进措施的书面指令。该指令属于 （ ）",[518,519,520,521],{"key":20,"text":370,"correct":22},{"key":24,"text":372,"correct":22},{"key":28,"text":374,"correct":26},{"key":31,"text":376,"correct":22},{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},385322,"在（ ）中，项目经理可利用的资源最少。",[526,528,529,530],{"key":20,"text":527,"correct":22},"平衡矩阵型组织",{"key":24,"text":197,"correct":26},{"key":28,"text":193,"correct":22},{"key":31,"text":199,"correct":22},{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":28,"analysis":33},385323,"“十二五”期间，电子政务促进行政体制改革和服务型政府建设的作用更加显著，其发展目标不包括 （ ）",[535,537,539,541],{"key":20,"text":536,"correct":22},"电子政务统筹协调发展不断深化",{"key":24,"text":538,"correct":22},"应用发展取得重大进展",{"key":28,"text":540,"correct":26},"初步形成电子政务网络与信息安全保障体系",{"key":31,"text":542,"correct":22},"政府公共服务和管理应用成效明显",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},385324,"为了保证信息系统工程项目投资、质量、进度及效果各方面处于良好的可控状态，我国在信息系统项目管理探索过程中逐步形成了自己的信息系统服务管理体系，目前该体系中不包括 。",[547,549,551,553],{"key":20,"text":548,"correct":22},"信息系统工程监理单位资质管理",{"key":24,"text":550,"correct":26},"IT基础设施库资质管理",{"key":28,"text":552,"correct":22},"信息系统项目经理资格管理",{"key":31,"text":554,"correct":22},"计算机信息系统集成单位资质管理",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":20,"analysis":33},385325,"项目的临时性是指 （ ） 。",[559,561,563,565],{"key":20,"text":560,"correct":26},"每一个项目都有一个明确的开始时间和结束时间，项目是一次性的",{"key":24,"text":562,"correct":22},"项目可能有不同的客户、不同的用户。不同的需求、不同的产品、不同的时间、不同的成本和质量",{"key":28,"text":564,"correct":22},"系统集成商不仅向客户提供产品，更重要的是根据其要求提供不同的解决方案",{"key":31,"text":79,"correct":22},[567,571,574,577,580,582],{"id":568,"name":569,"category":7,"favorite":570},136,"法律职业试卷二(客观题 )",2,{"id":572,"name":573,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":575,"name":576,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":578,"name":579,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":9,"name":581,"category":7,"favorite":8},"安全工程师",{"id":583,"name":584,"category":7,"favorite":8},112,"安全生产法律知识"]