[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":603},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,26,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,201,213,225,233,245,257,268,280,292,304,316,328,340,349,361,373,385,397,409,421,429,439,449,461,473,485,497,509,521,533,545,557,569,581,591],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},385179,1,"单选题","The key benefit of( )is that it provides guidance and direction on how the project costs will be managed throughout the project.",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","plan Cost Management",true,{"key":24,"text":25,"correct":26},"B","Control Cost",false,{"key":28,"text":29,"correct":26},"C","Estimate Cost",{"key":31,"text":32,"correct":26},"D","Determine Budget","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},385180,"Integration （ ） is the process of verifying that the components of a system work together as described in the program design and system design specifications.",[38,40,42,44],{"key":20,"text":39,"correct":26},"trying",{"key":24,"text":41,"correct":26},"checking",{"key":28,"text":43,"correct":22},"testing",{"key":31,"text":45,"correct":26},"coding",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},385181,"A schedule is commonly used in project planning and project portfolio management.（ ） on a schedule may be closely related to the work breakdown structure （WBS）terminal elements, the statement of work, or a contract data requirements list.",[50,52,54,56],{"key":20,"text":51,"correct":26},"Essences",{"key":24,"text":53,"correct":22},"Elements",{"key":28,"text":55,"correct":26},"Purposes",{"key":31,"text":57,"correct":26},"Issues",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},385182,"（ ） are thefour major activities of software configuration management. ① configuration identification ② statement report ③ change control ④ preparation of requirement document ⑤ configuration auditing",[62,64,66,68],{"key":20,"text":63,"correct":26},"①②③④",{"key":24,"text":65,"correct":26},"①②④⑤",{"key":28,"text":67,"correct":22},"①②③⑤",{"key":31,"text":69,"correct":26},"②③④⑤",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},385183,"Those items are often estimated in terms of resource （ ） , budget and duration.Linked by dependencies and scheduled events.",[74,76,78,80],{"key":20,"text":75,"correct":26},"finding",{"key":24,"text":77,"correct":26},"balance",{"key":28,"text":79,"correct":22},"allocation",{"key":31,"text":81,"correct":26},"distribution",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},385184,"Cloud computing is a type of Internet-based computing that provides shared computer processingresources and data to computers and other devices on demand. Advocates claimthat cloud computing allows companies to avoid up-front infrastructure costs.Cloud computing now has few service form, but it is not including （）.",[86,88,90,92],{"key":20,"text":87,"correct":26},"IaaS",{"key":24,"text":89,"correct":26},"PaaS",{"key":28,"text":91,"correct":26},"SaaS",{"key":31,"text":93,"correct":22},"DaaS",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},385185,"The most expensive phase of life cycle costing is （ ） .",[98,100,102,104],{"key":20,"text":99,"correct":26},"Termination",{"key":24,"text":101,"correct":26},"Applied research",{"key":28,"text":103,"correct":26},"Production",{"key":31,"text":105,"correct":22},"Operations and support",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},385186,"The inputs of developing project management plan do not include（）.",[110,112,114,116],{"key":20,"text":111,"correct":26},"project charter",{"key":24,"text":113,"correct":22},"stakeholder management strategy",{"key":28,"text":115,"correct":26},"project scope statement",{"key":31,"text":117,"correct":26},"outputs from planning processes",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},385187,"( )is a project management technique for measuring projectPerformance progress.It has the ability to combine measurements of the project management triangle: scope,time and costs.",[122,124,126,128],{"key":20,"text":123,"correct":26},"Critica1 path method(CPM)",{"key":24,"text":125,"correct":22},"Earned value management(CEV)",{"key":28,"text":127,"correct":26},"Net present value method(NPVM)",{"key":31,"text":129,"correct":26},"Expert judgment method(EJM)",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},385188,"Most of the host operating system provides a way for a system administrator to manually configure the IP information needed by a host．Automated configuration methods, such as （ ） , are required to solve the problem．",[134,136,138,140],{"key":20,"text":135,"correct":26},"Ipse",{"key":24,"text":137,"correct":22},"DHCP",{"key":28,"text":139,"correct":26},"PPTP",{"key":31,"text":141,"correct":26},"SOAP",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},385189,"The work breakdown structure comprises several levels of decomposition of the total project.The lowest level of definition is always the （ ） .",[146,148,150,152],{"key":20,"text":147,"correct":26},"planning",{"key":24,"text":149,"correct":22},"element",{"key":28,"text":151,"correct":26},"subtask",{"key":31,"text":153,"correct":26},"working interface",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},385190,"For anyinformation system to serve its purpose ，the ihformation must be( )when it ìs needed.",[158,160,162,164],{"key":20,"text":159,"correct":26},"integral",{"key":24,"text":161,"correct":22},"availab1e",{"key":28,"text":163,"correct":26},"irreplaceable",{"key":31,"text":165,"correct":26},"confidential",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},385191,"In project management, a （ ） is a listing of a project’s milestones ,activities, and deliverables, usually with intended start and finish dates。",[170,172,174,176],{"key":20,"text":171,"correct":22},"schedule",{"key":24,"text":173,"correct":26},"activity",{"key":28,"text":175,"correct":26},"Plan",{"key":31,"text":177,"correct":26},"contractor",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},385192,"Project manager believes that modifying the project scope may provide added value for the customer. The project manager should （ ） . A.change the scope baseline",[182,184,186,188],{"key":20,"text":183,"correct":26},"contact the customer to determine if the change adds value",{"key":24,"text":185,"correct":26},"call",{"key":28,"text":187,"correct":22},"meeting of the change control board",{"key":31,"text":189,"correct":26},"change the project’s objectives",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},385193,"Schedule development can require the review and revision of duration estimates and resource estimates to create an approved（74）that can serve as a baseline to track progress.",[194,196,198,199],{"key":20,"text":195,"correct":26},"scope statement",{"key":24,"text":197,"correct":26},"activity list",{"key":28,"text":111,"correct":26},{"key":31,"text":200,"correct":22},"project schedule",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},385194,"A project management technique that is currently in widespread use is the （ ） . The purpose of this technique is to detail, in hierarchical fashion, all of the activities that are required to meet project objectives.",[205,207,209,211],{"key":20,"text":206,"correct":26},"Functional decomposition diagram",{"key":24,"text":208,"correct":22},"Work Breakdown Structure",{"key":28,"text":210,"correct":26},"Structure Chart",{"key":31,"text":212,"correct":26},"Organizational Structure",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},385195,"The work breakdown structure （WBS） has been widely used in management for software development project, （ ） is generally NOT validated through the WBS．",[217,219,221,223],{"key":20,"text":218,"correct":26},"Schedule and cost",{"key":24,"text":220,"correct":26},"Organization structuring",{"key":28,"text":222,"correct":26},"Management coordination",{"key":31,"text":224,"correct":22},"Quality of work",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},385196,"( ) : The capability provided to the consumer is to use the provide's applications running on a c1oud infrastructure.The applications are accessible from various client devices through either a thin client interface, such as a web browser (e.g.,web-based E-mai1),or a program interface.",[229,230,231,232],{"key":20,"text":87,"correct":26},{"key":24,"text":89,"correct":26},{"key":28,"text":91,"correct":22},{"key":31,"text":93,"correct":26},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":28,"analysis":33},385197,"（）represents the informationassets characterized by such a High volume, Velocity and Variety to requirespecific Technology and Analytical Methods for its transformation into Value. A.Internet plus",[237,239,241,243],{"key":20,"text":238,"correct":26},"Industry 4.0",{"key":24,"text":240,"correct":26},"Big data",{"key":28,"text":242,"correct":22},"Clou",{"key":31,"text":244,"correct":26},"computing",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":31,"analysis":33},385198,"A project manager believes that modifying the scope of the project may provide added value service for the customer. The project manager should （ ）",[249,251,253,255],{"key":20,"text":250,"correct":26},"assign change tasks to project members",{"key":24,"text":252,"correct":26},"call a meeting of the configuration control board",{"key":28,"text":254,"correct":26},"change the scope baseline",{"key":31,"text":256,"correct":22},"postpone the modification until a separate enhancement project is fundedafter this project is completed according to the original baseline",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":24,"analysis":33},385199,"A milestone is a significant （ ） in a project．",[261,262,264,266],{"key":20,"text":173,"correct":26},{"key":24,"text":263,"correct":22},"event",{"key":28,"text":265,"correct":26},"phase",{"key":31,"text":267,"correct":26},"Process",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":20,"analysis":33},385200,"The project life-cycle can be described as（）.",[272,274,276,278],{"key":20,"text":273,"correct":22},"project concept, project planning, project execution, and project close-out",{"key":24,"text":275,"correct":26},"project planning, work authorization, and project reporting",{"key":28,"text":277,"correct":26},"project planning, project control, project definition, WBS development, and project termination",{"key":31,"text":279,"correct":26},"project concept, project execution, and project reporting",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},385201,"The Systems Development Life Cycle （SDL C） is a process of creating or altering information systems, and the models and methodologies that people use to develop these systems. Sequential SDLC models, such as （ ） , focus on complete and correct planning to guide large projects and risks to successful and predictable results. A.Waterfall",[284,286,288,290],{"key":20,"text":285,"correct":22},"Extreme Programming",{"key":24,"text":287,"correct":26},"Spiral",{"key":28,"text":289,"correct":26},"Rapi",{"key":31,"text":291,"correct":26},"Frototyping",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},385202,"A project life cycle is a collection of generally sequential project （）whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic for managing the project, regardless of the specific work involved.",[296,298,300,302],{"key":20,"text":297,"correct":22},"phases",{"key":24,"text":299,"correct":26},"processes",{"key":28,"text":301,"correct":26},"segments",{"key":31,"text":303,"correct":26},"pieces",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},385203,"Circuit-switching technology is used in Public Switched Telephone Network（PSTN）, Global System for Mobile Communications（GSM） and Code Division Multiple Access（CDM A）. It is a （ ） information transfer mode.",[308,310,312,314],{"key":20,"text":309,"correct":22},"Connection oriented",{"key":24,"text":311,"correct":26},"connectionless",{"key":28,"text":313,"correct":26},"High bandwidth utilization",{"key":31,"text":315,"correct":26},"Poor-real-time",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":28,"analysis":33},385204,"（ ） is primarily concerned with defining and controlling what is and is not included in the project.",[320,322,324,326],{"key":20,"text":321,"correct":26},"Project Time Management",{"key":24,"text":323,"correct":26},"Project Cost Management",{"key":28,"text":325,"correct":22},"Project Scope Management",{"key":31,"text":327,"correct":26},"Project Communications Management",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},385205,"The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycle, It is（）",[332,334,336,338],{"key":20,"text":333,"correct":26},"development",{"key":24,"text":335,"correct":22},"concept",{"key":28,"text":337,"correct":26},"system analysis",{"key":31,"text":339,"correct":26},"implementation",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":28,"analysis":33},385206,"Project manager believes that modifying the project scop may provide added value for the customer.The project manager should( ) A.change the scope baseline",[344,345,346,347],{"key":20,"text":183,"correct":26},{"key":24,"text":185,"correct":26},{"key":28,"text":187,"correct":22},{"key":31,"text":348,"correct":26},"change the project's objectives",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":20,"analysis":33},385207,"Information is no good to you if you can't ( ) it.The location dimension of information means having access to access to information no where you are.",[353,355,357,359],{"key":20,"text":354,"correct":22},"access",{"key":24,"text":356,"correct":26},"make",{"key":28,"text":358,"correct":26},"learn",{"key":31,"text":360,"correct":26},"bring",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},385208,"All of followings should be done by the project manager during project control except (). A.Determine the a change has occurred",[365,367,369,371],{"key":20,"text":366,"correct":26},"Ensure that a change is agreed",{"key":24,"text":368,"correct":22},"Make sure all changes are approve",{"key":28,"text":370,"correct":26},"by management",{"key":31,"text":372,"correct":26},"Manage changes as they occur",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":20,"analysis":33},385209,"Which of following is an important input to scope verification? ()",[377,379,381,383],{"key":20,"text":378,"correct":22},"Work results",{"key":24,"text":380,"correct":26},"Historical information",{"key":28,"text":382,"correct":26},"Formal acceptance",{"key":31,"text":384,"correct":26},"Change request",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":31,"analysis":33},385210,"()describees,indetail,the project's deliverables and the work required to create those deliverables.",[389,391,393,395],{"key":20,"text":390,"correct":26},"Product scope description",{"key":24,"text":392,"correct":26},"Project objectives",{"key":28,"text":394,"correct":26},"Produce specification",{"key":31,"text":396,"correct":22},"The project scope statement",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":31,"analysis":33},385211,"Cloud computing is a style of computing in which dynamically scalabled often ( ) resources are provided as a service over the internet",[401,403,405,407],{"key":20,"text":402,"correct":26},"real",{"key":24,"text":404,"correct":26},"fixed",{"key":28,"text":406,"correct":26},"actual",{"key":31,"text":408,"correct":22},"virtualized",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":28,"analysis":33},385212,"OSI is a theoretical model that shows how any two different systems can communicate with each other. Router, as a networking device operate at the（）layer of the OSI model",[413,415,417,419],{"key":20,"text":414,"correct":26},"transport",{"key":24,"text":416,"correct":26},"application",{"key":28,"text":418,"correct":22},"network",{"key":31,"text":420,"correct":26},"physical",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":24,"analysis":33},385213,"The inputs of developing project management plan do not include()",[425,426,427,428],{"key":20,"text":111,"correct":26},{"key":24,"text":113,"correct":22},{"key":28,"text":115,"correct":26},{"key":31,"text":117,"correct":26},{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":28,"analysis":33},385214,"Perform Quality Control is the process of monitoring and recording results*of executing the Quality Plan activities to assess performance and recommend necessary changes.（） are the techniques and tools in performing quality control① Statistical sampling ② Run chart③ Control charts ④ Critical Path Method⑤ Pareto chart⑥ Cause and effect diagrams",[433,434,435,437],{"key":20,"text":63,"correct":26},{"key":24,"text":69,"correct":26},{"key":28,"text":436,"correct":22},"①②③⑤⑥",{"key":31,"text":438,"correct":26},"①③④⑤⑥",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":20,"analysis":33},385215,"()is the application of planned，systematic quality activities to ensure thatthe project will employ all processes needed to meet requirements． A.Quality assurance(Q A)",[443,445,447],{"key":20,"text":444,"correct":22},"Quality planning",{"key":24,"text":446,"correct":26},"Quality control(Q",{"key":28,"text":448,"correct":26},"Quality costs",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":20,"analysis":33},385216,"（）seeks to build confidence that a future output or an unfinished output, will be completed in a manner that meets the specified requirements and expectations.",[453,455,457,459],{"key":20,"text":454,"correct":22},"Quality assurance",{"key":24,"text":456,"correct":26},"Quality plan",{"key":28,"text":458,"correct":26},"Quality control",{"key":31,"text":460,"correct":26},"Quality metrics",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},385217,"Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance．（ ） is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements．",[465,467,469,471],{"key":20,"text":466,"correct":26},"Cost-Benefit analysis",{"key":24,"text":468,"correct":26},"Control charts",{"key":28,"text":470,"correct":26},"Quality function deployment",{"key":31,"text":472,"correct":22},"Cost of quality analysis",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},385218,"The （ ） refers to the integration of complex physical machinery with networked sensors and software. It draws together fields such as machine learning, big data, the Internet of things and machine-to-machine communication to ingest data form machines, analyze it （often in real-time）, and use it to adjust operations.",[477,479,481,483],{"key":20,"text":478,"correct":22},"Industrial internet",{"key":24,"text":480,"correct":26},"factory internert",{"key":28,"text":482,"correct":26},"Industrial web",{"key":31,"text":484,"correct":26},"business",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},385219,"Projects are a mean of achieving organizational （）.",[489,491,493,495],{"key":20,"text":490,"correct":26},"culture",{"key":24,"text":492,"correct":22},"strategy",{"key":28,"text":494,"correct":26},"spirit",{"key":31,"text":496,"correct":26},"structure",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},385220,"The work that needs to be accomplished to deliver a product,service,or result with the specified features and functions is called （ ） . A.Scope management",[501,503,505,507],{"key":20,"text":502,"correct":22},"Integrate",{"key":24,"text":504,"correct":26},"management",{"key":28,"text":506,"correct":26},"SOW",{"key":31,"text":508,"correct":26},"PMO",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":28,"analysis":33},385221,"Ethernet is the commonly used local area network communication protocol. The standard of Ethernet is （ ） .",[513,515,517,519],{"key":20,"text":514,"correct":26},"IEEE 802.1",{"key":24,"text":516,"correct":26},"IEEE 802.2",{"key":28,"text":518,"correct":22},"IEEE 802.3",{"key":31,"text":520,"correct":26},"IEEE 802.11",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":31,"analysis":33},385222,"Which of the following scheduling methods uses more of the risk management concepts（ ） .",[525,527,529,531],{"key":20,"text":526,"correct":26},"ADM",{"key":24,"text":528,"correct":26},"PDM",{"key":28,"text":530,"correct":26},"CPM",{"key":31,"text":532,"correct":22},"PERT",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},385223,"TCP\u002FIP communication protocol contains four layers. From bottom to top, the four layers are （ ） .",[537,539,541,543],{"key":20,"text":538,"correct":22},"network interface layer—internet layer—transport layer—application layer",{"key":24,"text":540,"correct":26},"internet layer —network interface layer—transport layer—application layer",{"key":28,"text":542,"correct":26},"network interface layer—transport layer —network interface layer—application layer",{"key":31,"text":544,"correct":26},"application layer—transport layer —internet layer—network interface layer",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},385224,"A project life cycle is a collection of generally sequential project whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic （） for managing the project, regardless of the specific work involved.",[549,551,553,555],{"key":20,"text":550,"correct":26},"plan",{"key":24,"text":552,"correct":26},"fraction",{"key":28,"text":554,"correct":26},"main",{"key":31,"text":556,"correct":22},"framework",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":28,"analysis":33},385225,"在项目实施过程中， （ ）容易增加冲突发生的概率。",[561,563,565,567],{"key":20,"text":562,"correct":26},"保证资源的供给",{"key":24,"text":564,"correct":26},"项目组织结构由矩阵结构改为项目型结构",{"key":28,"text":566,"correct":22},"项目实施中引入新技术",{"key":31,"text":568,"correct":26},"明确责任",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":31,"analysis":33},385226,"在软件生命周期中，能准确地确定软件系统必须做什么和必须具备哪些功能的阶段是（）",[573,575,577,579],{"key":20,"text":574,"correct":26},"概要设计",{"key":24,"text":576,"correct":26},"详细设计",{"key":28,"text":578,"correct":26},"可行性分析",{"key":31,"text":580,"correct":22},"需求分析",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":31,"analysis":33},385227,"监理活动的主要内容可以概括为“四控、三管、一协调”。其中四控包含（ ） 。 ①质量控制②风险控制③投资控制 ④进度控制⑤范围控制⑥变更控制",[585,586,587,589],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":26},{"key":28,"text":588,"correct":26},"①③④⑤",{"key":31,"text":590,"correct":22},"①③④⑥",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":24,"analysis":33},385228,"基于V模型来设定软件开发项目计划，项目组应该在概要设计阶段制定软件的（ ）计划",[595,597,599,601],{"key":20,"text":596,"correct":26},"单元测试",{"key":24,"text":598,"correct":22},"系统测试",{"key":28,"text":600,"correct":26},"集成测试",{"key":31,"text":602,"correct":26},"验收测试",[604,608,611,614,617,620],{"id":605,"name":606,"category":7,"favorite":607},136,"法律职业试卷二(客观题 )",2,{"id":609,"name":610,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":612,"name":613,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":615,"name":616,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":618,"name":619,"category":7,"favorite":8},28,"安全工程师",{"id":621,"name":622,"category":7,"favorite":8},112,"安全生产法律知识"]