[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,25,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,177,189,201,213,225,237,249,259,271,281,293,305,317,328,340,352,364,376,388,400,411,422,434,446,458,470,482,494,506,517,525,533,545,557,569,581,593],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},385129,1,"单选题","The project manager must maintain an effective communication link with the customer’s satisfaction with the progress of the project. The project manager maintains this link through()",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","Periodic project reports, periodic visits to the customer, and telephonic exchanges",true,{"key":24,"text":25,"correct":26},"B","Subordinates, project team members, and the project sponsor",false,{"key":28,"text":29,"correct":26},"C","One-time reports, weekly reports, and monthly reports",{"key":31,"text":32,"correct":26},"D","The telephone, facsimile, and data transmission","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},385130,"项目具体结果包括项目的最终产品或服务，也包括项目过程的结果。项目过程结果的质量需要由（）进行控制",[38,40,42,44],{"key":20,"text":39,"correct":26},"质量控制职能部门",{"key":24,"text":41,"correct":26},"质检员",{"key":28,"text":43,"correct":26},"项目经理",{"key":31,"text":45,"correct":22},"项目管理组织的成员",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},385131,"The earned value technique is a commonly used method of performance measurement. It integrates project scope, cost, and schedule measures to help the project management team assess project performance. If a project’s Schedule Performance Index（SPI=EV\u002FPV） value less than1.0, it means that_（）.",[50,52,54,56],{"key":20,"text":51,"correct":26},"the project is a head of its planned schedule",{"key":24,"text":53,"correct":22},"less work was completed than was planned",{"key":28,"text":55,"correct":26},"the cost overrun for work completed",{"key":31,"text":57,"correct":26},"the cost under-run of performance to date",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},385132,"To ensure the project team provide the functionlity the customer expects in a new prece of software, the project manager ask the customer for sing-off on the design crieria.There documents are()",[62,64,66,68],{"key":20,"text":63,"correct":22},"technical speifications",{"key":24,"text":65,"correct":26},"performance specifications",{"key":28,"text":67,"correct":26},"product descriptions",{"key":31,"text":69,"correct":26},"quality assurance",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},385133,"Software engineers apply the principles of software engineering to the design, development, ( ),testing, and evaluation of the software and systems that make computers or anything containing software work.",[74,76,78,80],{"key":20,"text":75,"correct":26},"Requirement",{"key":24,"text":77,"correct":26},"construction",{"key":28,"text":79,"correct":26},"service",{"key":31,"text":81,"correct":22},"maintenance",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},385134,"Schedule development can require the review and revision of duration estimates and resource estimates to create an approved （） that can serve as a baseline to track progress.",[86,88,90,92],{"key":20,"text":87,"correct":26},"scope statement",{"key":24,"text":89,"correct":26},"activity list",{"key":28,"text":91,"correct":26},"project charter",{"key":31,"text":93,"correct":22},"project schedule",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},385135,"Categories of risk response are （ ） .",[98,100,102,104],{"key":20,"text":99,"correct":26},"Identification, quantification, response development, and response control",{"key":24,"text":101,"correct":26},"Marketing, technical, financial, and human",{"key":28,"text":103,"correct":26},"Avoidance, retention, control, and deflection",{"key":31,"text":105,"correct":22},"Avoidance, mitigation, acceptance, and Transferring",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},385136,"Which of the following statement related to PMO is not correct? （） A.The specific form, function, an",[110,112,114,116],{"key":20,"text":111,"correct":26},"structure of a PMO is dependent upon the needs of the organization that it supports.",{"key":24,"text":113,"correct":26},"One of the key features of a PMO is managing shared resources across all projects administered by the PMO.",{"key":28,"text":115,"correct":22},"The PMO focuses on the specified project objectives.",{"key":31,"text":117,"correct":26},"The PMO optimizes the use of shared organizational resources across all projects.",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},385137,"he work breakdown structure comprises several levels of decomposition of the total project. The lowest level of definition is always the()",[122,124,126,128],{"key":20,"text":123,"correct":26},"Planning element",{"key":24,"text":125,"correct":22},"Work package",{"key":28,"text":127,"correct":26},"Subtask",{"key":31,"text":129,"correct":26},"Working interface",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},385138,"The（）process analyzes the effect of risk events and assigns a numerical rating to those risks. A.Risk Identification",[134,136,138,140],{"key":20,"text":135,"correct":26},"Quantitative Risk Analysis",{"key":24,"text":137,"correct":22},"Qualitative Risk Analysis",{"key":28,"text":139,"correct":26},"Risk Monitoring an",{"key":31,"text":141,"correct":26},"Control",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},385139,"Modern computers based on() are millions to billions of times more capable than the early machines，and occupy a fraction of the space。Simple computers are small enough to fit into mobile devices, a mobile computers can be powered by small batteries. Personal computers in their va A.Central Processing unit B.integrate",[146,148,150,152],{"key":20,"text":147,"correct":26},"circuits",{"key":24,"text":149,"correct":22},"Har",{"key":28,"text":151,"correct":26},"disk",{"key":31,"text":153,"correct":26},"software integration",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},385140,"ATM (Asynchronous Transfer Mode) technology combines connection oriented mechanism and （） mechanism.",[158,160,162,164],{"key":20,"text":159,"correct":26},"circuit switching",{"key":24,"text":161,"correct":22},"packet switching",{"key":28,"text":163,"correct":26},"message switching",{"key":31,"text":165,"correct":26},"voice switching",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},385141,"The （）describes, in detail, the project’s deliverables and the work required to create those deliverables.",[170,172,174,175],{"key":20,"text":171,"correct":22},"project scope statement",{"key":24,"text":173,"correct":26},"project requirement",{"key":28,"text":91,"correct":26},{"key":31,"text":176,"correct":26},"product specification",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},385142,"()is a dedicated storage network that provides access to consolidated,block level storage.It is primarily used to mark storage devices accessible to servers so that the devices appear as locally attached to the operating system.",[181,183,185,187],{"key":20,"text":182,"correct":26},"network-attached storage",{"key":24,"text":184,"correct":22},"storage area network",{"key":28,"text":186,"correct":26},"direct attached storage",{"key":31,"text":188,"correct":26},"computer cluster",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":28,"analysis":33},385143,"The project budget has been finalized.Additional work has been discovered that was not planned for in the budget or project scope. (74) could provide the fund to cover the newly discovered work item.",[193,195,197,199],{"key":20,"text":194,"correct":26},"Contingency reserve",{"key":24,"text":196,"correct":26},"Project profit",{"key":28,"text":198,"correct":22},"Management reserve",{"key":31,"text":200,"correct":26},"Special fund",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},385144,"The Systems Development Life Cycle (SDL C) is a process of creating or altering information systems, and the models and methodologies that people use to develop these systems. Sequential SDLC models, such as (72),focus on complete and correct planning to guide large projects and risks to successful and predictable results. A.Waterfall",[205,207,209,211],{"key":20,"text":206,"correct":22},"Extreme Programming",{"key":24,"text":208,"correct":26},"Spiral",{"key":28,"text":210,"correct":26},"Rapi",{"key":31,"text":212,"correct":26},"Frototyping",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},385145,"() can be considered as part of risk mitigation.",[217,219,221,223],{"key":20,"text":218,"correct":26},"Risk identification",{"key":24,"text":220,"correct":26},"Purchasing insurance",{"key":28,"text":222,"correct":26},"Assessment of outcomes",{"key":31,"text":224,"correct":22},"Assessment of probabilities",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},385146,"Information theory is related to the quantification of information. This was developed by Claude E. Shannon to who found fundamental limits on()operations such as compressing data and on reliably storing and communicating data.",[229,231,233,235],{"key":20,"text":230,"correct":26},"signal",{"key":24,"text":232,"correct":26},"data",{"key":28,"text":234,"correct":26},"information",{"key":31,"text":236,"correct":22},"signal processing",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},385147,"A test case normally consists of a unique identifier, requirement references from a design specification, events,aseries of stepsto follow, input,output, actual result, and() 。",[241,243,245,247],{"key":20,"text":242,"correct":26},"bug",{"key":24,"text":244,"correct":22},"expected result",{"key":28,"text":246,"correct":26},"test report",{"key":31,"text":248,"correct":26},"traceability matrix",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},385148,"（ ） is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements. A.Quality assurance（Q A）",[253,255,257],{"key":20,"text":254,"correct":22},"Quality planning",{"key":24,"text":256,"correct":26},"Quality control（Q",{"key":28,"text":258,"correct":26},"Quality costs",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":28,"analysis":33},385149,"() is the use of computing resources(hardware and software) that a delivered as a service over a network(typically the Internet).",[263,265,267,269],{"key":20,"text":264,"correct":26},"Virtualization",{"key":24,"text":266,"correct":26},"Internet of things",{"key":28,"text":268,"correct":22},"Cloud computer",{"key":31,"text":270,"correct":26},"Cloud computing",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},385150,"Software engineering is the study and an application of engineering to the design, development ,and ( ) of software",[275,276,277,279],{"key":20,"text":81,"correct":22},{"key":24,"text":79,"correct":26},{"key":28,"text":278,"correct":26},"running",{"key":31,"text":280,"correct":26},"deployment",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},385151,"Most of the host operating system provides a way for a system administrator to manually configure the IP information needed by a host. Automated configuration methods, such as （）, are required to solve the problem.",[285,287,289,291],{"key":20,"text":286,"correct":26},"IPSec",{"key":24,"text":288,"correct":22},"DHCP",{"key":28,"text":290,"correct":26},"PPTP",{"key":31,"text":292,"correct":26},"SOAP",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},385152,"The work that needs to be accomplished to deliver a product, service, or result with the specified features and functions is called ()。 A.Scope management",[297,299,301,303],{"key":20,"text":298,"correct":22},"Integrate",{"key":24,"text":300,"correct":26},"management",{"key":28,"text":302,"correct":26},"SOW",{"key":31,"text":304,"correct":26},"PMO",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":28,"analysis":33},385153,"（）are the four major activities of software configuration management.①configuration identification ②statement report③change control④preparation of requirement document ⑤configuration auditing",[309,311,313,315],{"key":20,"text":310,"correct":26},"①②③④",{"key":24,"text":312,"correct":26},"①②④⑤",{"key":28,"text":314,"correct":22},"①②③⑤",{"key":31,"text":316,"correct":26},"②③④⑤",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":31,"analysis":33},385154,"Software engineering is the study and application of engineering to the （）， development and maintenance of software.",[321,323,324,326],{"key":20,"text":322,"correct":26},"research",{"key":24,"text":300,"correct":26},{"key":28,"text":325,"correct":26},"assembly",{"key":31,"text":327,"correct":22},"design",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":20,"analysis":33},385155,"SWOT analysis is a kind of risk identification method. If the project team chose the SO strategy, they should（）",[332,334,336,338],{"key":20,"text":333,"correct":22},"make full use of the advantage and catch the opportunity",{"key":24,"text":335,"correct":26},"overcome the weakness and catch the opportunity",{"key":28,"text":337,"correct":26},"make full use of the advantage and reduce the threat",{"key":31,"text":339,"correct":26},"overcome the weakness and reduce the threat",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":31,"analysis":33},385156,"Several riskresponse strategies are available. (75)the risk simply gives another party responsibility for itsmanagement,it does not eliminate risk.",[344,346,348,350],{"key":20,"text":345,"correct":26},"Avoiding",{"key":24,"text":347,"correct":26},"Mitigating",{"key":28,"text":349,"correct":26},"Accepting",{"key":31,"text":351,"correct":22},"Transferring",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":20,"analysis":33},385157,"The ( ) refers to the integration of complex physical machinery with networked sensors and software. It draws together fields such as machine learning, big data, the Internet of things and machine-to-machine communication to ingest data form machines, analyze it (often in real-time), and use it to adjust operations.",[356,358,360,362],{"key":20,"text":357,"correct":22},"Industrial internet",{"key":24,"text":359,"correct":26},"factory internet",{"key":28,"text":361,"correct":26},"Industrial web",{"key":31,"text":363,"correct":26},"business internet",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":31,"analysis":33},385158,"Projects have the least attention in what form of organization？ （） 。",[368,370,372,374],{"key":20,"text":369,"correct":26},"Balanced matrix",{"key":24,"text":371,"correct":26},"Strong matrix",{"key":28,"text":373,"correct":26},"Coordinator",{"key":31,"text":375,"correct":22},"Functional",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},385159,"Managing risk and documenting them is very important in project planning process.You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the(73) .",[380,382,384,386],{"key":20,"text":381,"correct":22},"project management plan",{"key":24,"text":383,"correct":26},"project baseline",{"key":28,"text":385,"correct":26},"riskresponse plan",{"key":31,"text":387,"correct":26},"risk baseline",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":31,"analysis":33},385160,"Which of the following Project Scope Management processes involves subdividing the major projectdeliverablesinto smaller, more manageable components)()",[392,394,396,398],{"key":20,"text":393,"correct":26},"Scope Planning",{"key":24,"text":395,"correct":26},"Scope Verification",{"key":28,"text":397,"correct":26},"Scope Change Control",{"key":31,"text":399,"correct":22},"Scope Definition",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":20,"analysis":33},385161,"Project()is an uncertain event or condition that，if it occurs，has a positiveor a negative effect on at least one project objective，such as time，cost，scope， or quality．",[404,406,408,410],{"key":20,"text":405,"correct":22},"risk",{"key":24,"text":407,"correct":26},"problem",{"key":28,"text":409,"correct":26},"result",{"key":31,"text":232,"correct":26},{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":31,"analysis":33},385162,"A () is a software that provides a method of communication between two electronic devices over the World Wide Web. A.router",[415,417,419,421],{"key":20,"text":416,"correct":26},"cober",{"key":24,"text":418,"correct":26},"J2EE",{"key":28,"text":420,"correct":26},"we",{"key":31,"text":79,"correct":22},{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":31,"analysis":33},385163,"Establishing a project ( ) involves listen milestones, activities, and deliverables with intended start and finish dates, of which the scheduling of employees may be an element",[426,428,430,432],{"key":20,"text":427,"correct":26},"cost management plan",{"key":24,"text":429,"correct":26},"risk management plan",{"key":28,"text":431,"correct":26},"soope management plan",{"key":31,"text":433,"correct":22},"management schedule",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":31,"analysis":33},385164,"Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance. （） is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.",[438,440,442,444],{"key":20,"text":439,"correct":26},"Cost-Benefit",{"key":24,"text":441,"correct":26},"Control charts",{"key":28,"text":443,"correct":26},"Quality function deployment",{"key":31,"text":445,"correct":22},"Cost of quality analysis",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":20,"analysis":33},385165,"Risk management allows the project manager and the project team not to（）",[450,452,454,456],{"key":20,"text":451,"correct":22},"eliminate most risks during the planning phase of the project",{"key":24,"text":453,"correct":26},"identify project risks",{"key":28,"text":455,"correct":26},"identify impacts of various risks",{"key":31,"text":457,"correct":26},"plan suitable responses",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},385166,"The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such , the schedule is used by the project management team to()",[462,464,466,468],{"key":20,"text":463,"correct":26},"Measure, delay, record, distribute, analyze, and direct",{"key":24,"text":465,"correct":22},"Plan, schedule, monitor, control, report, and forecast",{"key":28,"text":467,"correct":26},"Promote, highlight, monitor, control, forecast, and report",{"key":31,"text":469,"correct":26},"Emphasize, visualize, analyze, conceptualize, report and record",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},385167,"Project success depends primarily on（） 。",[474,476,478,480],{"key":20,"text":475,"correct":26},"The quality of the schedule and cost control analysis",{"key":24,"text":477,"correct":22},"Customer satisfaction",{"key":28,"text":479,"correct":26},"Customer compromise in defining its needs",{"key":31,"text":481,"correct":26},"Exceeding customer requirements through gold-plating",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},385168,"The length of the IPv6 address is ().",[486,488,490,492],{"key":20,"text":487,"correct":26},"64 bytes",{"key":24,"text":489,"correct":26},"128 bytes",{"key":28,"text":491,"correct":26},"64 bits",{"key":31,"text":493,"correct":22},"128 bits",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},385169,"A line manager provides you with three estimates for his activity in your PERT network. His estimates are 2 weeks optimistically, 4 weeks mostlikely, and 12 weeks pessimistically. which would appear on the chart （ ） .",[498,500,502,504],{"key":20,"text":499,"correct":26},"4 weeks",{"key":24,"text":501,"correct":22},"5 weeks",{"key":28,"text":503,"correct":26},"6 weeks",{"key":31,"text":505,"correct":26},"7 weeks",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":28,"analysis":33},385170,"（ ） is the use of computing ...deliverd as a service over a network. A.Virtualzation B.Internet of things",[510,512,514,515],{"key":20,"text":511,"correct":26},"Clou",{"key":24,"text":513,"correct":26},"computer",{"key":28,"text":511,"correct":22},{"key":31,"text":516,"correct":26},"computing",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},385171,"ATM（Asynchronous Transfer Mode）technology combines connection oriented mechanism and （ ） mechanism.",[521,522,523,524],{"key":20,"text":159,"correct":26},{"key":24,"text":161,"correct":22},{"key":28,"text":163,"correct":26},{"key":31,"text":165,"correct":26},{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},385172,"A （ ） is a dedicated storage network that provides access to consolidated , block level storage. It is primarily used to make storage devices accessible to servers so that the devices appear as locally attached to the operating system.",[529,530,531,532],{"key":20,"text":182,"correct":26},{"key":24,"text":184,"correct":22},{"key":28,"text":186,"correct":26},{"key":31,"text":188,"correct":26},{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},385173,"（ ） management includes negotiating the terms and conditions in contracts and ensuring compliance with. the terms and conditions, as well as documenting and agreeing on any changes or amendments that may arise during its implementation or execution.",[537,539,541,543],{"key":20,"text":538,"correct":22},"Contract",{"key":24,"text":540,"correct":26},"Document",{"key":28,"text":542,"correct":26},"Communication",{"key":31,"text":544,"correct":26},"Risk",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},385174,"The Develop Project Management Plan Process includes the actions necessary to define, prepare,integrate, and coordinate all constituent plans into a （ ）",[549,551,553,555],{"key":20,"text":550,"correct":26},"Project Scope Statement",{"key":24,"text":552,"correct":22},"Project Management Plan",{"key":28,"text":554,"correct":26},"Forecasts",{"key":31,"text":556,"correct":26},"Project Charter",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},385175,"In general, the best long-lasting approach to settling project conflict is the （ ） approach.",[561,563,565,567],{"key":20,"text":562,"correct":22},"Problem solving",{"key":24,"text":564,"correct":26},"Compromise",{"key":28,"text":566,"correct":26},"Withdrawal",{"key":31,"text":568,"correct":26},"Smoothing",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},385176,"The features and functions that characterize a product, service, or result in a project are called （ ）。",[573,575,577,579],{"key":20,"text":574,"correct":26},"statement of work",{"key":24,"text":576,"correct":22},"Product Scope",{"key":28,"text":578,"correct":26},"Product quality",{"key":31,"text":580,"correct":26},"Project scope",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":28,"analysis":33},385177,"The Perform Integrated Change Control process is conducted from project inception through completion and is the ultimate responsibility of the （ ） .",[585,587,589,591],{"key":20,"text":586,"correct":26},"Chang control board",{"key":24,"text":588,"correct":26},"Project management office",{"key":28,"text":590,"correct":22},"Project manager",{"key":31,"text":592,"correct":26},"Configuration management officer",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":24,"analysis":33},385178,"The earned value technique is a commonly used method of performance measurement. It integrates project scope, cost, and schedule measures to help the project management team assess project performance. If a project’s Schedule Performance Index（SPI=EV\u002FPV） value less than 1.0, it means that （ ） .",[597,599,601,602],{"key":20,"text":598,"correct":26},"he project is ahead of its planned schedule",{"key":24,"text":600,"correct":22},"less work was completed than was planned t",{"key":28,"text":55,"correct":26},{"key":31,"text":603,"correct":26},"the cost underrun of performance to date",[605,609,612,615,618,621],{"id":606,"name":607,"category":7,"favorite":608},136,"法律职业试卷二(客观题 )",2,{"id":610,"name":611,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":613,"name":614,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":616,"name":617,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":619,"name":620,"category":7,"favorite":8},28,"安全工程师",{"id":622,"name":623,"category":7,"favorite":8},112,"安全生产法律知识"]