[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,24,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,164,176,187,199,208,220,232,244,256,268,277,289,300,312,324,336,348,360,372,384,396,408,420,432,444,456,467,479,491,503,515,527,539,551,563,575,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},385078,1,"单选题","（）由电缆连接器和相关设备组成，把各种不同的公共系统和设备连接起来其中包括电信部门的光缆，同轴电缆，程控交换机等。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","建筑群子系统",false,{"key":24,"text":25,"correct":26},"B","设备间子系",true,{"key":28,"text":29,"correct":22},"C","垂直干线子系统",{"key":31,"text":32,"correct":22},"D","工作区子系统","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},385079,"某政府部门拟利用中央财政资金建设电子政务项目，关于建设方的立项管理，下列说法中不符合有关规定的是 （ ） 。",[38,40,42,44],{"key":20,"text":39,"correct":22},"建设单位在编制项目建议书时专门组织项目需求分析，形成需求分析报告，报送项目审批部门",{"key":24,"text":41,"correct":22},"建设方在项目建议书获得批复后，招标选定有资格的第三方工程咨询机构编制可行性研究报告，报送项目审批部门",{"key":28,"text":43,"correct":26},"建设方在可行性研究报告获得批复后，向有关部门申请项目前期工作经费，前期工作经费计入项目总投资",{"key":31,"text":45,"correct":22},"建设方在可行性研究报告获得批复后，委托有资格的第三方工程咨询机构出具评估意见，连同批复的项目建议书，作为项目建设的主要依据",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},385080,"公民为完成法人或者其它组织工作任务所创作的作品是职务作品，对于主要是利用法人或者其它组织的物质技术条件创作，并由法人或者其它组织承担责任的工程设计图、产品设计图、地图和计算机软件等职务作品，其（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"作者享有著作",{"key":24,"text":53,"correct":26},"作者享有署名权",{"key":28,"text":55,"correct":22},"法人或者其他组织享有著作权",{"key":31,"text":57,"correct":22},"法人或者其它组织享有署名权",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},385081,"《中国人民共和国合同法》规定当事人订立合同，有书面形式，口头形式和其他形式，以电子邮件的形式订立的合同属于 （ ） 。",[62,64,66,68],{"key":20,"text":63,"correct":22},"其他形式",{"key":24,"text":65,"correct":26},"书面形式",{"key":28,"text":67,"correct":22},"口头形式",{"key":31,"text":69,"correct":22},"无效合同",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},385082,"某市政府采购办公用计算机及配套软件时进行了公开招标，以下做法正确的是 （ ） 。",[74,76,78,80],{"key":20,"text":75,"correct":22},"在招标文件中明确指出投标企业不应有外资背景",{"key":24,"text":77,"correct":26},"该项目招标结束后，招标单位向中标人发出中标通知书，但对所有未中标的投标人只通知中标结果",{"key":28,"text":79,"correct":22},"某项目在招标时仅有一家企业投标，于是该企业顺利中标",{"key":31,"text":81,"correct":22},"某项目的评标委员会由一名经济专家、一名技术专家和一名招标单位负责人组成",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},385083,"根据《中华人民共和国政府采购法》，以下做法正确的是 （ ） 。 ①某市民政局在进行政府采购的重新招标时，由于仅有两家企业的标的合格，于是报请本地采购监督管理部门批准将招标形式转为竞争性谈判 ②某市民政局在进行政府采购的公开招标时，由于没有企业投标，于是报请本地采购监督管理部门批准将招标形式转为竞争性谈判 ③某市民政局在进行政府采购的公开招标时，由于仅有一家企业的标的合格，于是报请本地采购监督管理部门批准将招标形式转为单一来源采购 ④某县民政局在进行公开招标时连续两次出现流标，于是报请本地采购监督管理部门批准将招标形式转为竞争性谈判。",[86,88,90,92],{"key":20,"text":87,"correct":26},"①②",{"key":24,"text":89,"correct":22},"①③",{"key":28,"text":91,"correct":22},"②③",{"key":31,"text":93,"correct":22},"②④",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},385084,"根据《软件文档管理指南 GB\u002FT16680-1996》，()不属于基本的产品文档。",[98,100,102,104],{"key":20,"text":99,"correct":22},"参考手册和用户指南",{"key":24,"text":101,"correct":22},"支持手册",{"key":28,"text":103,"correct":26},"需求规格说明",{"key":31,"text":105,"correct":22},"产品手册",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},385085,"政府采购的主要采购方式是 （ ） 。",[110,112,114,116],{"key":20,"text":111,"correct":26},"公开招标",{"key":24,"text":113,"correct":22},"邀请招标",{"key":28,"text":115,"correct":22},"询价",{"key":31,"text":117,"correct":22},"竞争性谈判",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},385086,"根据《电子信息系统机房设计规范》(GB50174－2008)规定，计算机网络机房应选择采用4种接地方式。（ ）接地系统是将电源的输出零电位端与地网连接在一起，使其成为稳定的零电位。要求该接地的地线与大地直接相通，其接地电阻要求小于1Ω。",[122,124,126,128],{"key":20,"text":123,"correct":22},"交流工作",{"key":24,"text":125,"correct":22},"线槽",{"key":28,"text":127,"correct":26},"直流工作",{"key":31,"text":129,"correct":22},"防雷",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},385087,"（42）诉讼失效期间从权利人知道或者应当知道权利被侵害起计算。但是，从权利被侵害之日起超过 年的，人民法院不予保护。",[134,136,138,140],{"key":20,"text":135,"correct":22},"10",{"key":24,"text":137,"correct":22},"15",{"key":28,"text":139,"correct":26},"20",{"key":31,"text":141,"correct":22},"30",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},385088,"根据《计算机软件需求说明编制指南GB\u002FT 9385—1988》，关于软件需求规格说明的编制，（）是不正确的做法",[146,148,150,152],{"key":20,"text":147,"correct":22},"软件需求规格说明由开发者和客户双方共同起草",{"key":24,"text":149,"correct":22},"软件需求规格说明必须描述软件的功能、性能、强加于实现的设计限制、属性和外部接口",{"key":28,"text":151,"correct":26},"软件需求规格说明中必须包含软件开发的成本、开发方法和验收过程等重要外部约束条件",{"key":31,"text":153,"correct":22},"在软件需求规格说明中避免嵌入软件的设计信息，如把软件划分成若干模块、给每一个模块分配功能、描述模块间信息流和数据流及选择数据结构等",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},385089,"采用公开招标方式的费用占政府采购项目总价值的比例过大的政府采购项目，可以按照《中华人民共和国政府采购法》采用 （） 方式进行采购。",[158,160,161,163],{"key":20,"text":159,"correct":22},"竞争性谈判采购",{"key":24,"text":113,"correct":26},{"key":28,"text":162,"correct":22},"单一来源采购",{"key":31,"text":115,"correct":22},{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},385090,"根据《电子计算机机房设计规范》（GB 50174—93），电子计算机机房应采用四种接地方式。将电气设备的金属外壳通过接地装置与大地直接连接起来是（ ） 。",[168,170,172,174],{"key":20,"text":169,"correct":22},"交流工作接地",{"key":24,"text":171,"correct":26},"安全工作接地",{"key":28,"text":173,"correct":22},"直流工作接地",{"key":31,"text":175,"correct":22},"防雷接地",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":31,"analysis":33},385091,"根据《建筑物防雷设计规范》（GB 50057—1994），每根引下线冲击接地电阻不宜大于 （ ） 欧姆。",[180,182,184,186],{"key":20,"text":181,"correct":22},"1",{"key":24,"text":183,"correct":22},"4",{"key":28,"text":185,"correct":22},"5",{"key":31,"text":135,"correct":26},{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},385092,"根据GB\u002FT16680－1996的相关规定，《用户手册》或《用户指南》属于（）",[191,193,195,197],{"key":20,"text":192,"correct":26},"产品文档",{"key":24,"text":194,"correct":22},"开发文档",{"key":28,"text":196,"correct":22},"管理文档",{"key":31,"text":198,"correct":22},"需求文档",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":28,"analysis":33},385093,"某公司接到通知，上级领导要在下午对该公司机房进行安全检查，为此公司做了如下安排：①了解检查组人员数量及姓名，为其准备访客证件②安排专人陪同检查人员对机房安全进行检查③为了体现检查的公正，下午为领导安排了一个小时的自由查看时间④根据检查要求，在机房内临时设置一处吸烟区，明确规定检查期间机房内其他区域严禁烟火上述安排符合《信息安全技术信息系统安全管理要求GB\u002FT 20269—2006》的做法是（）",[203,205,206,207],{"key":20,"text":204,"correct":22},"③④",{"key":24,"text":91,"correct":22},{"key":28,"text":87,"correct":26},{"key":31,"text":93,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":20,"analysis":33},385094,"根据．GB\u002FT29264-2012《信息技术服务分类与代码》规定，信息技术服务包括：信息技术咨询； （ ） ；信息系统集成实施服务；运行维护；数据处理和存储；运营服务；数字内容服务；呼叫服务等其他信息技术服务。",[212,214,216,218],{"key":20,"text":213,"correct":26},"设计与开发",{"key":24,"text":215,"correct":22},"信息系统工程监理",{"key":28,"text":217,"correct":22},"测试评估",{"key":31,"text":219,"correct":22},"信息系统设计",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":24,"analysis":33},385095,"根据《中华人民共和国招标投标法》，以下有关招标文件的说法中， （ ） 是错误的。",[224,226,228,230],{"key":20,"text":225,"correct":22},"联合体各方均应当具备承担招标项目的相应能力；国家有关规定或者招标文件对投标人资格条件有规定的，联合体各方均应当具备规定的相应资格条件。由同一专业的单位组成的联合体，按照资质等级较低的单位确定资质等级",{"key":24,"text":227,"correct":26},"为达到公平，招标人需向他人透露已获取招标文件的潜在投标人的名称、数量以及可能影响公平竞争的有关招标投标的其他情况。招标人设有标底的，标底必须保密",{"key":28,"text":229,"correct":22},"招标人不得以不合理的条件限制或者排斥潜在投标人，不得对潜在投标人实行歧视待遇",{"key":31,"text":231,"correct":22},"从事工程建设项目招标代理业务的招标代理机构，其资格由国务院或者省、自治区、直辖市人民政府的建设行政主管部门认定",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":20,"analysis":33},385096,"根据中华人民共和国政府采购法，下面关于采购方式的说法中 （ ） 是不正确的",[236,238,240,242],{"key":20,"text":237,"correct":26},"采用公开招标方式的招标费用占政府采购项目总价值的比例过大的，可依照政府采购法单一来源方式采购",{"key":24,"text":239,"correct":22},"招标后没有供应商投标或者没有合格标的或者重新招标未能成立的，可依照政府采购法采用竞争性谈判方式采购",{"key":28,"text":241,"correct":22},"采购的货物或服务具有特殊性，只能从有限范围的供应商处采购的，可依照政府采购法采用邀请招标方式采购",{"key":31,"text":243,"correct":22},"采购的货物规格，标准统一，现货货源充足且价格变化幅度小的政府采购项目，可依照政府采购法采用询价方式采购",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":20,"analysis":33},385097,"以下叙述中，不符合GB\u002FT 16680《软件文档管理指南》规定的是（ ）。",[248,250,252,254],{"key":20,"text":249,"correct":26},"质量保证计划属于管理文档",{"key":24,"text":251,"correct":22},"详细设计评审需要评审程序单元测试计划",{"key":28,"text":253,"correct":22},"文档的质量可以按文档和的形式和列出的要求划分为四级",{"key":31,"text":255,"correct":22},"软件产品的所有文档都应该按规定进行签署。必要时进行会签",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":20,"analysis":33},385098,"根据《中华人民共和国政府采购法》，关于询价采购的程序，下面说法不正确的是 （ ） 。",[260,262,264,266],{"key":20,"text":261,"correct":26},"询价小组应由采购人的代表和有关专家共五人以上的单数组成。其中专家的人数不得少于成员总数的三分之二",{"key":24,"text":263,"correct":22},"询价小组按照采购需求，从符合相应资格条件的供应的商名单中确定不少于三家的供应商，并向其发出询价通知书让其报价",{"key":28,"text":265,"correct":22},"询价小组应要求被询价的供应商一次报出不得更改的价格",{"key":31,"text":267,"correct":22},"采购人员根据符合采购需求、质量和服务同等且报价最低的原则确定成交供应商，并将结果通知所有被询价的未成交的供应商",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":31,"analysis":33},385099,"根据我国政府采购法，采购人与中标，成交供应商应当在中标、成立通知书发出之日起 （ ） 日内按照采购文件确定的事项签订政府采购合同。",[272,274,275,276],{"key":20,"text":273,"correct":22},"7",{"key":24,"text":135,"correct":22},{"key":28,"text":139,"correct":22},{"key":31,"text":141,"correct":26},{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":20,"analysis":33},385100,"以下关于计算机机房与设施安全管理的要求，()是不正确的",[281,283,285,287],{"key":20,"text":282,"correct":26},"计算机系统的设备和部件应有明显的标记，并应便于去除或重新标记",{"key":24,"text":284,"correct":22},"机房中应定期使用静电消除剂，以减少静电的产生",{"key":28,"text":286,"correct":22},"进入机房的工作人员，应更换不易产生静电的服装",{"key":31,"text":288,"correct":22},"禁止携带个人计算机等电子设备进入机房",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":20,"analysis":33},385101,"甲公司与乙公司订立了一份总货款额为20万元的设备供货合同。合同约定的违约金为货款总额总值的10%。同时，甲公司向乙公司给付定金5000元。后乙公司违约，给甲公司造成损失2万元。乙公司依法向甲公司支付违约金（ ） 万元。",[293,295,297,298],{"key":20,"text":294,"correct":26},"2",{"key":24,"text":296,"correct":22},"2.5",{"key":28,"text":183,"correct":22},{"key":31,"text":299,"correct":22},"1.5",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":28,"analysis":33},385102,"依据GB\u002FT 20271-2006《信息系统安全技术信息系统通用安全技术要求》中的规定，（）不属于信息系统安全技术体系包含的内容。",[304,306,308,310],{"key":20,"text":305,"correct":22},"物理安全",{"key":24,"text":307,"correct":22},"运行安全",{"key":28,"text":309,"correct":26},"人员安全",{"key":31,"text":311,"correct":22},"数据安全",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":20,"analysis":33},385103,"某信息系统集成项目实施期间，因建设单位指定的系统部署地点所处的大楼进行线路改造，导致项目停工一个月，由于建设单位未提前通知承建单位，导致双方在项目启动阶段协商通过的项目计划无法如期履行。根据我国有关规定，承建单位 （ ） 。",[316,318,320,322],{"key":20,"text":317,"correct":26},"可申请延长工期补偿，也可申请费用补偿",{"key":24,"text":319,"correct":22},"可申请延长工期补偿，不可申请费用补偿",{"key":28,"text":321,"correct":22},"可申请费用补偿，不可申请延长工期补偿",{"key":31,"text":323,"correct":22},"无法取得补偿",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":24,"analysis":33},385104,"一个故障已经被发现，而且也被排除了，为了检查修改是否引起了其他问题，这时应该进行 （ ） 。",[328,330,332,334],{"key":20,"text":329,"correct":22},"程序走查",{"key":24,"text":331,"correct":26},"回归测试",{"key":28,"text":333,"correct":22},"软件评审",{"key":31,"text":335,"correct":22},"接收测试",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":31,"analysis":33},385105,"( )不属于知识产权的基本特征。",[340,342,344,346],{"key":20,"text":341,"correct":22},"时间性",{"key":24,"text":343,"correct":22},"地域性",{"key":28,"text":345,"correct":22},"专有性",{"key":31,"text":347,"correct":26},"实用性",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},385106,"下列关于《软件文档管理指南GB\u002FT 16680~1996》的描述，正确的是（）。",[352,354,356,358],{"key":20,"text":353,"correct":26},"该标准规定了软件文档分为：开发文档、产品文档和管理文档",{"key":24,"text":355,"correct":22},"该标准给出了软件项目开发过程中编制软件需求说明书的详细指导",{"key":28,"text":357,"correct":22},"该标准规定了在制定软件质量保证计划时应遵循的统一的基本要求",{"key":31,"text":359,"correct":22},"该标准给出了软件完整生存周期中所涉及的各个过程的一个完整集合",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":31,"analysis":33},385107,"根据《中华人民共和国政府采购法》，以下做法正确的是 （） 。",[364,366,368,370],{"key":20,"text":365,"correct":22},"负有编制部门预算职责的部门在编制下一财政年度部门预算时，应当将该财政年度政府采购的项目及资金预算列出，报上级财政部门汇总。",{"key":24,"text":367,"correct":22},"货物或者服务项目采取邀请招标方式采购的，采购人应当从符合相应资格条件的供应商中，指定三家以上的供应商，并向其发出投标邀请书",{"key":28,"text":369,"correct":22},"货物或者服务项目采取邀请招标方式采购的，采购人应当从符合相应资格条件的供应商中，通过随机方式选择两家以上的供应商",{"key":31,"text":371,"correct":26},"货物和服务项目实行招标方式采购的，自招标文件开始发出之日起至投标人提交投标文件截止之日止，不得少于二十日",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":31,"analysis":33},385108,"求（功能、性能、设计约束和属性）和外部界面。必须把每一个需 按照GB\u002FT11457—2006《软件工程术语》的描述，以下关于验收测试的叙述中 （ ） 是不正确的。",[376,378,380,382],{"key":20,"text":377,"correct":22},"验收测试是确定一系统是否符合其验收准则的正式测试",{"key":24,"text":379,"correct":22},"验收测试是使用用户确定是否接受系统或者部件的正式测试",{"key":28,"text":381,"correct":22},"验收测试内容可能包含部分运行测试和合格性测试",{"key":31,"text":383,"correct":26},"系统测试的测试结果等同于验收测试的测试结果",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":24,"analysis":33},385109,"乙公司参加一个网络项目的投标，为增加中标的可能性，乙公司决定将招标文件中的一些次要项目（约占总金额的3%）作为可选项目，没有计算到投标总价中，而是另作为一张可选价格表，由招标方选择是否需要，评标时，评委未计算可选价格部分，这样乙公司因报价低而中标。洽谈合同时，甲方提出乙方所说的可选项目是必需的，在招标文件中已明确说明，要求乙方免费完成，乙方以投标文件中有说明为由不同意免费，该项目最可能的结果是 （ ） 。",[388,390,392,394],{"key":20,"text":389,"correct":22},"甲方追加经费",{"key":24,"text":391,"correct":26},"重新招标",{"key":28,"text":393,"correct":22},"甲方不追加经费，相应部分取消",{"key":31,"text":395,"correct":22},"重新确定中标方",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":31,"analysis":33},385110,"甲公司在进行采购时选定了乙公司的产品，但在签订采购合同时没有对采购物品的交付地点进行约定，则以下说法正确的是 （） 。",[400,402,404,406],{"key":20,"text":401,"correct":22},"按照有利于实现合同目的的方式履行",{"key":24,"text":403,"correct":22},"交付不动产的方式，在乙方所在地履行",{"key":28,"text":405,"correct":22},"其他标的，在履行权力一方所在地履行",{"key":31,"text":407,"correct":26},"给付货币的，在接受货币一方所在地履行",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":28,"analysis":33},385111,"关于计算机机房安全保护方案的设计，以下说法错误的是（）",[412,414,416,418],{"key":20,"text":413,"correct":22},"某机房在设计供电系统时将计算机供电系统与机房照明设备供电系统分开",{"key":24,"text":415,"correct":22},"某机房通过各种手段保障计算机系统的供电，使得该机房的设备长期处于7*24小时连续运转状态",{"key":28,"text":417,"correct":26},"某公司在设计计算机机房防盗系统时，在机房布置了封闭装置，当潜入者触动装置时，机房可以从内部自动封闭，使盗贼无法逃脱",{"key":31,"text":419,"correct":22},"某机房采用焊接的方式设置安全防护地和屏蔽地",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":28,"analysis":33},385113,"根据《电子信息系统机房设计规范 GB50174-2008》，关于人流、物流及出入口的论述，以下错误的是 （）",[424,426,428,430],{"key":20,"text":425,"correct":22},"主机房与其他功能用房共用出入口时，提出了避免人流和物流的交叉的解决办法。",{"key":24,"text":427,"correct":22},"有人和无人操作区域分开布置",{"key":28,"text":429,"correct":26},"电子信息系统机房内通道的宽度及门的尺寸应满足设备和材料的运输要求，建筑入口至主机房的通道净宽不应小于2.5m",{"key":31,"text":431,"correct":22},"机房设置了门厅、休息室、值班室和更衣间",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":28,"analysis":33},385114,"根据GB\u002FT11457-2006标准,软件开发方法是（）",[436,438,440,442],{"key":20,"text":437,"correct":22},"关于给定的软件单元或相关集的开发过程与方法的集合，是规则、方法和工具的集成",{"key":24,"text":439,"correct":22},"软件开发过程所遵循的方法，它是规则、方法和工具的集成，支持软件开发",{"key":28,"text":441,"correct":26},"软件开发过程所遵循的方法和步骤，它是规则、方法和工具的集成，既支持软件开发，也支持以后的演化过程",{"key":31,"text":443,"correct":22},"软件开发过程所遵循的方法，它是规则、方法和工具的集成，支持软件演化过程",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},385115,"关于单栋建筑中的综合布线，下列叙述中（）是不正确的",[448,450,452,454],{"key":20,"text":449,"correct":26},"单栋建筑中的综合布线系统工程范围是指在整栋建筑内敷设的通信线路",{"key":24,"text":451,"correct":22},"单栋建筑中的综合布线包括建筑物内敷设的管路、槽道系统、通信线缆、接续设备以及其他辅助设施",{"key":28,"text":453,"correct":22},"终端设备及其连接软线和插头等在使用前随时可以连接安装，一般不需要设计和施工",{"key":31,"text":455,"correct":22},"综合布线系统的工程设计和安装施工是可以分别进行的",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":28,"analysis":33},385116,"软件文档管理指南GB\u002FT 16680-1996将文档的质量按文档的形式和列出要求划分为四级，分别是最低限度文档，内部文档， （ ） 和正式文档。",[460,462,463,465],{"key":20,"text":461,"correct":22},"外部文档",{"key":24,"text":196,"correct":22},{"key":28,"text":464,"correct":26},"工作文档",{"key":31,"text":466,"correct":22},"临时文档",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":28,"analysis":33},385117,"关于软件用户质量要求，以下说法正确的是 （ ） 。",[471,473,475,477],{"key":20,"text":472,"correct":22},"用户质量要求可通过内部质量的度量、外部度量，有时是功能度量来确定为质量要求",{"key":24,"text":474,"correct":22},"用户质量要求可通过用户需求质量的度量、内部度量，有时是外部度量确定为质量要求",{"key":28,"text":476,"correct":26},"用户质量要求可通过使用质量的度量、外部度量，有时是内部度量来确定为质量要求",{"key":31,"text":478,"correct":22},"用户质量要求可通过使用质量的外部度量、内部度量，有时是需求度量来确定为质量要求",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":24,"analysis":33},385118,"根据软件工程产品质量GB\u002FT16260－2006，在下列信息系统的设计方案中，主要用于提高系统可靠性的方案是 （ ） 。",[483,485,487,489],{"key":20,"text":484,"correct":22},"将简单的文本界面升级为图形交互界面，增加语音，视频等交互方式",{"key":24,"text":486,"correct":26},"添加备用模块，当主模块出现错误时用备用模块来顶替它",{"key":28,"text":488,"correct":22},"采用原型化开发方法，同时将核心系统用原型系统代替",{"key":31,"text":490,"correct":22},"精简系统架构，合并有关模块，减少系统的总模块数",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":24,"analysis":33},385119,"甲软件系统每年因故障中断10次，每次恢复平均要 20分钟，乙软件系统每年因故障中断2次，每次恢复平均要5个小时，根据《软件工程 产品质量 GB\u002FT16260-2006》中可靠性和有有效性（或可用性）的定义，下面说法正确的是 （ ） 。",[495,497,499,501],{"key":20,"text":496,"correct":22},"甲系统的可靠性比乙系统高，可用性比乙系统差",{"key":24,"text":498,"correct":26},"甲系统的可用性比乙系统高，可靠性比乙系统差",{"key":28,"text":500,"correct":22},"甲系统的可靠性比乙系统高，可用性比乙系统高",{"key":31,"text":502,"correct":22},"甲系统的可用性比乙系统差，可容性比乙系统差",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":31,"analysis":33},385120,"根据GB\u002FT16260.1中对软件产品质量模型的描述，软件产品的使用质量不包括 （ ） 。",[507,509,511,513],{"key":20,"text":508,"correct":22},"有效性",{"key":24,"text":510,"correct":22},"生产率",{"key":28,"text":512,"correct":22},"满意度",{"key":31,"text":514,"correct":26},"易用性",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},385121,"依照通信综合布线规范，以下水平子系统布线距离的描述中正确的是()",[519,521,523,525],{"key":20,"text":520,"correct":22},"水平电缆最大长度为 80 米，配线架跳接至交换机、信息插座跳接至计算机总长度不超过 20米，通信通道总长度不超过 100 米",{"key":24,"text":522,"correct":26},"水平电缆最大长度为 90 米，配线架跳接至交换机、信息插座跳接至计算机总长度不超过 10米，通信通道总长度不超过100 米",{"key":28,"text":524,"correct":22},"水平电缆最大长度为 80 米，配线架跳接至交换机、信息插座跳接至计算机总长度不超过 10米，通信通道总长度不超过90 米",{"key":31,"text":526,"correct":22},"水平电缆最大长度为 90 米，配线架跳接至交换机、信息插座跳接至计算机总长度不超过 20米，通信通道总长度不超过110 米",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":31,"analysis":33},385122,"()is one of the quality planning outputs.",[531,533,535,537],{"key":20,"text":532,"correct":22},"Scope base line",{"key":24,"text":534,"correct":22},"Cost of quality",{"key":28,"text":536,"correct":22},"Product specification",{"key":31,"text":538,"correct":26},"Quality checklist",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},385123,"() is not the advantage of GERT （Graphical evaluation and review techniques）as compared with PERT （project evaluation and review techniques）.",[543,545,547,549],{"key":20,"text":544,"correct":22},"Allowing looping",{"key":24,"text":546,"correct":26},"Allowing for dummy tasks",{"key":28,"text":548,"correct":22},"Allowing branching",{"key":31,"text":550,"correct":22},"Allowing multiple project end results",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},385124,"Business intelligence（BI）is the integrated application of data warehouse, data mining and （）",[555,557,559,561],{"key":20,"text":556,"correct":26},"OLAP",{"key":24,"text":558,"correct":22},"OLTP",{"key":28,"text":560,"correct":22},"MRPII",{"key":31,"text":562,"correct":22},"CMS",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":31,"analysis":33},385125,"（）is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between them.",[567,569,571,573],{"key":20,"text":568,"correct":22},"PERT",{"key":24,"text":570,"correct":22},"AOA",{"key":28,"text":572,"correct":22},"WBS",{"key":31,"text":574,"correct":26},"PDM",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":24,"analysis":33},385126,"The Project Management Triangle is a model of the constraints of project management. These constraints have been listed scope (or quality), ( ), and cost",[579,581,583,585],{"key":20,"text":580,"correct":22},"resource",{"key":24,"text":582,"correct":26},"time",{"key":28,"text":584,"correct":22},"plan",{"key":31,"text":586,"correct":22},"tool",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":28,"analysis":33},385127,"Risk management’s ( ) is to assure uncertainty does not deflect the endeavor from the business goals",[591,593,595,597],{"key":20,"text":592,"correct":22},"trend",{"key":24,"text":594,"correct":22},"detail",{"key":28,"text":596,"correct":26},"objective",{"key":31,"text":598,"correct":22},"rule",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":28,"analysis":33},385128,"A project manager is called to an informal meeting with the customer and a problem is raised. This problem has major implications for the project manager’s company, but the customer wants to pursue a solution at the meeting, The project manager should()",[603,605,607,609],{"key":20,"text":604,"correct":22},"Tell the customer that he will not address any problems",{"key":24,"text":606,"correct":22},"Tell the customer that the problem is not sufficiently defined to company to a solution",{"key":28,"text":608,"correct":26},"Collect as much information on the problem without committing his company to a solution",{"key":31,"text":610,"correct":22},"Give the customer a range of solutions that might be acceptable to his company",[612,616,619,622,625,628],{"id":613,"name":614,"category":7,"favorite":615},136,"法律职业试卷二(客观题 )",2,{"id":617,"name":618,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":620,"name":621,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":623,"name":624,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":626,"name":627,"category":7,"favorite":8},28,"安全工程师",{"id":629,"name":630,"category":7,"favorite":8},112,"安全生产法律知识"]