[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,23,50,1397,[13,34,46,58,70,82,90,102,114,126,138,150,162,174,186,194,206,218,230,242,254,266,278,290,302,314,326,338,350,362,374,386,398,410,422,434,446,458,470,479,491,503,515,527,539,551,563,575,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},385028,1,"单选题","根据《软件文档管理指南GB\u002FT 16680-1996》，软件变更情况的记录和相对于开发的判定记录的文档属于 （） 。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","开发文档",false,{"key":24,"text":25,"correct":22},"B","产品文档",{"key":27,"text":28,"correct":29},"C","管理文档",true,{"key":31,"text":32,"correct":22},"D","质量文档","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},385029,"某单位依据《电子信息系统机房设计规范GB50174—2008》设计该单位的机房，在该单位采取的下述方案中，（）是不符合该规范的",[38,40,42,44],{"key":20,"text":39,"correct":22},"整个机房由主机房、辅助区、支持区和行政管理区等4个功能区组成",{"key":24,"text":41,"correct":22},"主机房内计划放置15台设备，设计使用面积65平方米",{"key":27,"text":43,"correct":29},"除主机房外，还设置了辅助区，辅助区面积是主机房面积的10%",{"key":31,"text":45,"correct":22},"主机房设置了设备搬运通道、设备之间的出口通道、设备的测试和维修通道",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},385030,"( )一般不属于机房建设的内容。",[50,52,54,56],{"key":20,"text":51,"correct":22},"消防监控安装调试",{"key":24,"text":53,"correct":29},"三通一平",{"key":27,"text":55,"correct":22},"网络设备安裝调试",{"key":31,"text":57,"correct":22},"空调系统安裝调试",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},385031,"合同可以变更，但是当事人对合同变更的内容约定不明确的，推定为（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":29},"未变更",{"key":24,"text":65,"correct":22},"部分变更",{"key":27,"text":67,"correct":22},"已经变更",{"key":31,"text":69,"correct":22},"变更为可撤销",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},385032,"以下采用单一来源采购方式的活动， （） 是不恰当的",[74,76,78,80],{"key":20,"text":75,"correct":29},"某政府部门为建立内部办公系统，已从一个供应商采购了120万元的网络设备，由于办公地点扩大，打算继续从原供应商采购15万元的设备",{"key":24,"text":77,"correct":22},"某地区发生自然灾害，当地民政部门需要紧急采购一批救灾物资",{"key":27,"text":79,"correct":22},"某地方主管部门需要采购一种市政设施，目前此种设施国内仅有一家厂商生产",{"key":31,"text":81,"correct":22},"某政府机关为升级其内部办公系统，与原承建商签订了系统维护合同",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},385033,"合同可以变更，但是当事人对合同变更的内容约定不明确的，推定为 （ ） 。",[86,87,88,89],{"key":20,"text":69,"correct":22},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":22},{"key":31,"text":63,"correct":29},{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":20,"analysis":33},385034,"根据GB\u002FT16680—1996《软件文档管理指南》的规定，项目文档分为开发文档、产品文档和管理文档三类。 （ ） 属于开发文档类。",[94,96,98,100],{"key":20,"text":95,"correct":29},"可行性研究报告",{"key":24,"text":97,"correct":22},"职责定义",{"key":27,"text":99,"correct":22},"软件支持手册",{"key":31,"text":101,"correct":22},"参考手册和用户指南",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":31,"analysis":33},385035,"《中华人民共和国政府采购法》第二十四条规定，两个以上的自然人、法人或者其他组织可以组成一个联合体，以一个供应商的身份共同参加政府采购。以下关于联合体供应商的叙述， () 是不正确的。",[106,108,110,112],{"key":20,"text":107,"correct":22},"参加联合体的供应商均应具备相关的条件",{"key":24,"text":109,"correct":22},"参加联合体的供应商应当向采购人提交联合协议，载明联合体各方承担的工作和义务",{"key":27,"text":111,"correct":22},"参加联合体的供应商各方应当共同与采购人签订采购合同",{"key":31,"text":113,"correct":29},"参加联合体的次要供应商不需要就采购合同约定的事项对采购承担连带责任",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":31,"analysis":33},385036,"GB\u002FT 14394-2008《计算机软件可靠性与可维护性管理》提出了软件生存周期各个阶段进行软件可靠性和可维护性管理的要求。“测量可靠性，分析现场可靠性是否达到要求”是（ ）的可靠性和可维护性管理要求。",[118,120,122,124],{"key":20,"text":119,"correct":22},"获取过程",{"key":24,"text":121,"correct":22},"供应过程",{"key":27,"text":123,"correct":22},"开发过程",{"key":31,"text":125,"correct":29},"运作过程和维护过程",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},385037,"根据《电子信息系统机房设计规范GB50174-2008》，电子信息系统机房应对人流和出入口进行安全考虑，以下叙述错误的是（）",[130,132,134,136],{"key":20,"text":131,"correct":22},"建筑的入口至主机房应设通道，通道净宽不应小于1.5m",{"key":24,"text":133,"correct":22},"电子信息系统机房宜设门厅、休息室、值班室和更衣间",{"key":27,"text":135,"correct":22},"电子信息系统机房应有设备搬入口",{"key":31,"text":137,"correct":29},"电子信息系统机房必须设置单独出入口",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":31,"analysis":33},385038,"某大型国企采购计算机与软件时进行了公开招标，以下做法正确的是 （） 。",[142,144,146,148],{"key":20,"text":143,"correct":22},"在招标文件中明确规定只有中资企业才有资格进行招标",{"key":24,"text":145,"correct":22},"中标人确定后，招标人仅向中标人发出中标通知书，并告知了中标结果。",{"key":27,"text":147,"correct":22},"投标人送达标书，招标人需当面拆封检查材料的完整性",{"key":31,"text":149,"correct":29},"某项目的评标委员会的经济专家、技术专家从事相关领域工作满八年并具有高级职称或者具有同等专业水平",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":31,"analysis":33},385039,"我国颁布的《大楼通信综合布线系统 YD\u002FT926))标准的适用范围是跨度距离不超过（）米，办公总面积不超过 1000 平方米的布线区域",[154,156,158,160],{"key":20,"text":155,"correct":22},"500",{"key":24,"text":157,"correct":22},"1000",{"key":27,"text":159,"correct":22},"2000",{"key":31,"text":161,"correct":29},"3000",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":20,"analysis":33},385040,"在信息系统安全技术体系中，环境安全只要指中心机房的安全保护。以下不属于该体系环境安全内容的是()",[166,168,170,172],{"key":20,"text":167,"correct":29},"设备防盗器",{"key":24,"text":169,"correct":22},"接地和防雷击",{"key":27,"text":171,"correct":22},"机房控制",{"key":31,"text":173,"correct":22},"防电磁泄漏",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":20,"analysis":33},385041,"GB\u002FT 14394-93《计算机软件可靠性和可维护性管理》标准提出了软件生存周期各阶段的可靠性和可维护性要求。其中“分析和确定软件可靠性和可维护性目标”是（）的要求。",[178,180,182,184],{"key":20,"text":179,"correct":29},"需求分析阶段",{"key":24,"text":181,"correct":22},"概要设计",{"key":27,"text":183,"correct":22},"详细设计阶段",{"key":31,"text":185,"correct":22},"实现阶段",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},385042,"我国颁布的《大楼通信综合布线系统YD\u002FT926》标准的适用范围是跨度距离不超过（ ） m，办公总面积不超过1 000 000 m2的布线区域。",[190,191,192,193],{"key":20,"text":155,"correct":22},{"key":24,"text":157,"correct":22},{"key":27,"text":159,"correct":22},{"key":31,"text":161,"correct":29},{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":20,"analysis":33},385043,"当 （ ） 时，合同可能认定为无效。",[198,200,202,204],{"key":20,"text":199,"correct":29},"合同甲乙双方损害了社会共同利益",{"key":24,"text":201,"correct":22},"合同中缺少违约条款",{"key":27,"text":203,"correct":22},"合同标的规格约定不清",{"key":31,"text":205,"correct":22},"合同中包括对人身伤害的免责条款",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":24,"analysis":33},385044,"李某购买了一张有注册商标的应用软件光盘，则李某享有 （ ） 。",[210,212,214,216],{"key":20,"text":211,"correct":22},"注册商标专用权",{"key":24,"text":213,"correct":29},"该光盘的所有权",{"key":27,"text":215,"correct":22},"该软件的著作权",{"key":31,"text":217,"correct":22},"该软件的复制权",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":31,"analysis":33},385045,"在GB\u002FT14393计算机软件可靠性和可维护性管理标准中，()不是详细设计评审的内容。",[222,224,226,228],{"key":20,"text":223,"correct":22},"各单元可靠性和可维护性目标",{"key":24,"text":225,"correct":22},"可靠性和可维护性设计",{"key":27,"text":227,"correct":22},"测试文件、软件开发工具",{"key":31,"text":229,"correct":29},"测试原理、要求、文件和工具",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":27,"analysis":33},385046,"按照《中华人民共和国政府采购法》的规定，供应商可以在知道或者应知其权益受到损害之日起七个工作日内，以书面形式向采购人提出质疑。 （ ） 不属于质疑的范围。",[234,236,238,240],{"key":20,"text":235,"correct":22},"采购过程",{"key":24,"text":237,"correct":22},"采购文件",{"key":27,"text":239,"correct":29},"合同效力",{"key":31,"text":241,"correct":22},"中标、成交结果",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":24,"analysis":33},385047,"某政府部门要进行采购招标，其招标的部分流程如下： 关于上述招标流程，下面说法正确的是 （61） 。",[246,248,250,252],{"key":20,"text":247,"correct":22},"4日内完成资格预审文件发放符合招投标相关法规",{"key":24,"text":249,"correct":29},"停止发放资格预审文件到终止提交预审资格申请的时间间隔符合招投标相关法规",{"key":27,"text":251,"correct":22},"发布资格预审合格名单和发布招标书时间间隔不符合招投标相关法规",{"key":31,"text":253,"correct":22},"招标书应在8月3日前发售",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":27,"analysis":33},385048,"某公司在申请域名www．test．com时，该域名的注册人、管理联系人和技术联系人分别是小张、小李和小王。由于某些原因需要修改相关注册信息，（ ）提交修改申请。",[258,260,262,264],{"key":20,"text":259,"correct":22},"仅小张可以",{"key":24,"text":261,"correct":22},"仅小李可以",{"key":27,"text":263,"correct":29},"需要小张和小李一起",{"key":31,"text":265,"correct":22},"需要小李和小王一起",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":31,"analysis":33},385049,"根据GB\u002FT 12504 标准，为确保软件的实现满足需求，需要一些基本的文档。（ ） 不属于基本文档。",[270,272,274,276],{"key":20,"text":271,"correct":22},"软件需求规格说明书",{"key":24,"text":273,"correct":22},"软件设计说明书",{"key":27,"text":275,"correct":22},"软件验证和确认计划",{"key":31,"text":277,"correct":29},"项目开发总结",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":20,"analysis":33},385050,"根据GB\u002FT 17544，软件包质量要求包括三部分，即产品描述要求、（ ） 、程序和数据要求。",[282,284,286,288],{"key":20,"text":283,"correct":29},"用户文档要求",{"key":24,"text":285,"correct":22},"系统功能要求",{"key":27,"text":287,"correct":22},"设计要求说明",{"key":31,"text":289,"correct":22},"软件配置要求",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},385051,"根据GB\u002FT 12504—90《计算机软件质量保证计划规范》，在软件及所属子系统开发过程中，应该进行三次评审：第一次评审软件需求、概要设计、验证与确认方法；第二次评审详细设计、功能设计与演示；第三次评审是功能检查、物理检查和综合检查。第三次评审应在 （ ）进行。",[294,296,298,300],{"key":20,"text":295,"correct":22},"需求分析阶段结束后",{"key":24,"text":297,"correct":22},"软件设计阶段结束后",{"key":27,"text":299,"correct":29},"集成测试阶段结束后",{"key":31,"text":301,"correct":22},"验收测试阶段结束后",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":27,"analysis":33},385052,"根据GB\u002FT16680-1996《软件文档管理指南》的规定，文档也是要分质量等级的，适合于同一单位内若干人联合开发的程序，或可被其他单位使用的程序的文档被称为（）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"最低限度文档",{"key":24,"text":309,"correct":22},"内部文档",{"key":27,"text":311,"correct":29},"工作文档",{"key":31,"text":313,"correct":22},"正式文档",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":31,"analysis":33},385053,"根据《信息技术 软件工程术语 GB\u002FT11457-2006》， （ ） 是评价系统或软件，以确定软件开发周期中的一个给定阶段的产品是否满足在阶段的开始确立的需求的过程。",[318,320,322,324],{"key":20,"text":319,"correct":22},"认证",{"key":24,"text":321,"correct":22},"确认",{"key":27,"text":323,"correct":22},"审计",{"key":31,"text":325,"correct":29},"验证",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},385054,"甲乙双方订立合同，规定甲应予2007年8月1日交货，乙应予同年8月7日付款，月底，甲发现乙财产状况恶化，已没有支付货款的能力，并有确切证据，甲提出终止合同，但乙未允。基于上述情况，甲于8月1日未按约定交货，依照合同法的原则。下列关于甲行为的论述中，正确的是（）",[330,332,334,336],{"key":20,"text":331,"correct":22},"甲必须按合同约定交货，但可以要求乙提供相应的担保",{"key":24,"text":333,"correct":29},"甲有权不按合同约定交货，除非乙提供了相应的担保",{"key":27,"text":335,"correct":22},"甲必须按合同约定交货，但可以仅先交付部分货物",{"key":31,"text":337,"correct":22},"甲应按合同约定交货，如乙不支付货款可追究其违约责任",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":27,"analysis":33},385055,"（）不需要登记或标注版权标记就应得到保护。",[342,344,346,348],{"key":20,"text":343,"correct":22},"专利权",{"key":24,"text":345,"correct":22},"商标权",{"key":27,"text":347,"correct":29},"著作权",{"key":31,"text":349,"correct":22},"房产权",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":31,"analysis":33},385056,"根据《电子信息系统机房设计规范》， （ ） 的叙述是错误的",[354,356,358,360],{"key":20,"text":355,"correct":22},"某机房内面积为125平方米，共设置了三个安全出口",{"key":24,"text":357,"correct":22},"机房内所有设备的金属外壳、各类金属管道、金属线槽、建筑物金属结构等必须进行等电位联结并接地",{"key":27,"text":359,"correct":22},"机房内的照明线路宜穿钢管暗敷或在吊顶内穿钢管明敷",{"key":31,"text":361,"correct":29},"为了保证通风，A级电子信息系统机房应设置外窗",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},385057,"关于竞争性谈判，以下说法不恰当的是（）",[366,368,370,372],{"key":20,"text":367,"correct":29},"竞争性谈判公告须在财政部门指定的政府采购信息发布媒体上发布，公告发布日至谈判文件递交截止日期的时间不得少于20个自然日",{"key":24,"text":369,"correct":22},"某地方政府采用公开招标采购视频点播系统，招标公告发布后仅两家供应商在指定日期前购买标书，经采购、财政部门认可，可改为竞争性谈判",{"key":27,"text":371,"correct":22},"某机关办公大楼为配合线路改造，需在两周内紧急采购一批UPS设备，因此可采用竞争性谈判的釆购方式",{"key":31,"text":373,"correct":22},"须有3家以上具有资格的供应商参加谈判",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":27,"analysis":33},385058,"某机房部署了多级 UPS 和线路稳压器，这是出于机房供电的 ()需要",[378,380,382,384],{"key":20,"text":379,"correct":22},"分开供电和稳压供电",{"key":24,"text":381,"correct":22},"稳压供电和电源保护",{"key":27,"text":383,"correct":29},"紧急供电和稳压供电",{"key":31,"text":385,"correct":22},"不间断供电和安全供电",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":31,"analysis":33},385059,"W 公司想要对本单位的内部网络和办公系统进行改造，希望通过招标选择承建商，为此，W 公司进行了一系列活动。以()活动不符合《中华人民共和国招标投标法》的要求。",[390,392,394,396],{"key":20,"text":391,"correct":22},"对此项目的承建方和监理方的招标工作，W 公司计划由同一家招标代理机构负责招标，并计划在同一天开标",{"key":24,"text":393,"correct":22},"W 公司根据此项目的特点和需要编制了招标文件，并确定了提交投标文件的截止日期",{"key":27,"text":395,"correct":22},"有四家公司参加了投标，其中一家投标单位在截止日期之后提交投标文件，W 公司认为其违反了招标文件要求，没有接受该投标单位的投标文件",{"key":31,"text":397,"correct":29},"W 公司根据招标文件的要求，在三家投标单位中选择了其中一家作为此项 目的承建商，并只将结果通知了中标企业",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},385060,"图可以广泛用于描绘各种类型的信息处理问题及其解决方法。根据《中华人民共和国国家标准 GB 1526-1989》，用来表示程序启动路径和程序与相关数据的相互作用的图形工具是()",[402,404,406,408],{"key":20,"text":403,"correct":22},"流程图",{"key":24,"text":405,"correct":29},"程序网络图",{"key":27,"text":407,"correct":22},"系统流程图",{"key":31,"text":409,"correct":22},"程序流程图",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":27,"analysis":33},385061,"根据GB\u002FT11457-2006《信息技术软件工程术语》的规定，（）是计算机程序中的一个点，在此点检验或记录程序的状态、状况或结果。",[414,416,418,420],{"key":20,"text":415,"correct":22},"里程碑",{"key":24,"text":417,"correct":22},"基线",{"key":27,"text":419,"correct":29},"断点",{"key":31,"text":421,"correct":22},"检查点",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":31,"analysis":33},385062,"GB\u002FT16260-2006对软件质量度量做了详细的规定，其中（）可用于开发阶段的非执行软件产品，如标书、需求定义、设计规格说明等。",[426,428,430,432],{"key":20,"text":427,"correct":22},"外部度量",{"key":24,"text":429,"correct":22},"管理度量",{"key":27,"text":431,"correct":22},"使用质量的度量",{"key":31,"text":433,"correct":29},"内部度量",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},385063,"依据GB\u002FT 20271-2006《信息系统安全技术 信息系统通用安全技术要求》中的规定，配置抵抗电压不足的设备如UPS、改进UPS、多级UPS，属于（） 。",[438,440,442,444],{"key":20,"text":439,"correct":22},"分开供电",{"key":24,"text":441,"correct":29},"紧急供电",{"key":27,"text":443,"correct":22},"稳压供电",{"key":31,"text":445,"correct":22},"数据安全",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},385064,"在铺设活动地板的设备间内，应对活动地板进行专门检查，地板板块铺设严密坚固，符合安装要求，每平米水平误差应不大于()",[450,452,454,456],{"key":20,"text":451,"correct":22},"1mm",{"key":24,"text":453,"correct":29},"2mm",{"key":27,"text":455,"correct":22},"3mm",{"key":31,"text":457,"correct":22},"4mm",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},385065,"以下关于项目合同签订的描述中，正确的是()",[462,464,466,468],{"key":20,"text":463,"correct":22},"具有相应民事权利能力的自然人、法人或其他组织均可订立合同",{"key":24,"text":465,"correct":29},"如果合同中对技术支持服务期限未作出任何规定，则认为企业所有的维护都要求都要另行付费",{"key":27,"text":467,"correct":22},"对于当事人在订立合同中熟悉的商业秘密，一旦造成泄密，必须承担经济损害赔偿",{"key":31,"text":469,"correct":22},"为了避免合同纠纷，当事人必须将签订的合同进行公证，使之获得法律强制执行效力",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},385066,"以下采用单一来源采购方式的活动，()是不恰当的",[474,476,477,478],{"key":20,"text":475,"correct":29},"某政府部门为建立内部办公系统，已从一个供应商采购了 120 万元的网络设备，由于办公地点扩大，打算继续从原供应商采购 15 万元的设备",{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":22},{"key":31,"text":81,"correct":22},{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":24,"analysis":33},385067,"安全电子交易协议（SET:Secure Electronic Transaction）标准是一种应用于因特网环境下，以信用卡为基础的电子交付协议，它给出了一套电子交易过程规范，其支付系统主要由持卡人（cardholder）、商家（merchant）、发卡行（issuing bank）、收单行（acquiring bank）、支付网关（payment gateway）和 （ ） 等六个部分组成",[483,485,487,489],{"key":20,"text":484,"correct":22},"安全中心",{"key":24,"text":486,"correct":29},"认证中心",{"key":27,"text":488,"correct":22},"支付中心",{"key":31,"text":490,"correct":22},"信用中心",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":20,"analysis":33},385068,"工程建设合同纠纷的仲裁由合同双方选定的仲裁委员会仲裁，仲裁委员会作出裁决以后，当事人应当履行。当一方当事人不履行仲裁裁决时。另一方当事人可以依照民事诉讼法的有关规定向（）申请执行。",[495,497,499,501],{"key":20,"text":496,"correct":29},"人民法院",{"key":24,"text":498,"correct":22},"仲裁委员会",{"key":27,"text":500,"correct":22},"当地人民政府",{"key":31,"text":502,"correct":22},"调节委员会",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":24,"analysis":33},385069,"按照规范的文档管理机制，程序流程图必须在 两个阶段内完成。",[507,509,511,513],{"key":20,"text":508,"correct":22},"需求分析、概要设计",{"key":24,"text":510,"correct":29},"概要设计、详细设计",{"key":27,"text":512,"correct":22},"详细设计、实现阶段",{"key":31,"text":514,"correct":22},"实现阶段、测试阶段",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":20,"analysis":33},385070,"依照《中华人民共和国合同法》，委托开发完成的发明创造，除当事人另有约定的以外，申请专利的权利属于()",[519,521,523,525],{"key":20,"text":520,"correct":29},"研究开发人员",{"key":24,"text":522,"correct":22},"委托人",{"key":27,"text":524,"correct":22},"开发人与委托人共有",{"key":31,"text":526,"correct":22},"国家所有",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":27,"analysis":33},385071,"以下关于《中华人民共和国政府采购法》的描述，错误的是（ ）。",[531,533,535,537],{"key":20,"text":532,"correct":22},"必须保证原有采购项目一致性或者服务配套的要求，需要继续从原供应商处添购，且添购资金总额不超过原合同采购金额百分之十的，可采用单一来源方式采购",{"key":24,"text":534,"correct":22},"政府采购实行集中采购和分散采购相结合，集中采购的范围由省级以上人民政府公布的集中采购目录确定",{"key":27,"text":536,"correct":29},"中标、成交通知书发出后，中标、成交供应商自愿放弃中标、成交项目的，无须承担法律责任",{"key":31,"text":538,"correct":22},"采购人可以要求参加政府采购的供应商提供有关资质证明文件和业绩情况，对有资质的供应商仍需进行资格审查",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":27,"analysis":33},385072,"以下关于投标文件送达的叙述，（）是错误的",[543,545,547,549],{"key":20,"text":544,"correct":22},"投标人必须按照招标文件规定的地点、在规定的时间内送达投标文件",{"key":24,"text":546,"correct":22},"投递投标书的方式最好是直接送达或委托代理人送达，以便获得招标机构已收到投标书的回执",{"key":27,"text":548,"correct":29},"如果以邮寄方式送达的，投标人应保证投标文件能够在截止日期之前投递即可",{"key":31,"text":550,"correct":22},"招标人收到标书以后应当签收，在开标前不得开启",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":24,"analysis":33},385073,"GB\u002FT 11457-2006《信息技术 软件工程术语》规定了配置管理的三种基线，它们是（ ）。",[555,557,559,561],{"key":20,"text":556,"correct":22},"趋势基线、测试基线和原始基线",{"key":24,"text":558,"correct":29},"功能基线、分配基线和产品基线",{"key":27,"text":560,"correct":22},"产品基线、分配基线和测试基线",{"key":31,"text":562,"correct":22},"产品基线、原始基线和测试基线",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":20,"analysis":33},385074,"政府采购的主要采购方式是 （） 。",[567,569,571,573],{"key":20,"text":568,"correct":29},"公开招标",{"key":24,"text":570,"correct":22},"邀请招标",{"key":27,"text":572,"correct":22},"询价",{"key":31,"text":574,"correct":22},"竞争性谈判",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},385075,"根据《电子信息系统机房设计规范》(GB50174－2008)，为了确保系统运行的安全，针对计算机设备防泄露，以下做法不妥当的是（ ）。",[579,581,583,585],{"key":20,"text":580,"correct":22},"在被保护的计算机设备工作时，电磁干扰设备不准关机",{"key":24,"text":582,"correct":22},"屏蔽机房应及时关闭屏蔽门",{"key":27,"text":584,"correct":22},"要经常测试屏蔽机房的泄露情况并及时进行相关维护",{"key":31,"text":586,"correct":29},"需要对屏蔽机房内外连接线缆时，应在屏蔽墙上钻孔",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":24,"analysis":33},385076,"根据《软件工程—产品质量 第1部分：质量模型 GB\u002FT 16260．1—2006》，软件产品的使用质量是基于用户观点的软件产品用于指定的环境和使用环境（contexts of use）时的质量，其中 不是软件产品使用质量的质量属性。",[591,593,595,597],{"key":20,"text":592,"correct":22},"有效性",{"key":24,"text":594,"correct":29},"可信性",{"key":27,"text":596,"correct":22},"安全性",{"key":31,"text":598,"correct":22},"生产率",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":31,"analysis":33},385077,"招标人采用邀请招标方式的，应当向三个以上具备承担招标项目的能力、资信良好的()发出投标邀请书。",[603,605,607,609],{"key":20,"text":604,"correct":22},"不特定的法人",{"key":24,"text":606,"correct":22},"特定的法人",{"key":27,"text":608,"correct":22},"不特定的法人或者其他组织",{"key":31,"text":610,"correct":29},"特定的法人或者其他组织",[612,616,619,622,625,628],{"id":613,"name":614,"category":7,"favorite":615},136,"法律职业试卷二(客观题 )",2,{"id":617,"name":618,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":620,"name":621,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":623,"name":624,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":626,"name":627,"category":7,"favorite":8},28,"安全工程师",{"id":629,"name":630,"category":7,"favorite":8},112,"安全生产法律知识"]