[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,22,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,319,331,343,355,367,377,388,400,412,424,436,448,460,472,484,496,508,520,532,544,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},384978,1,"单选题","我国颁布的《大楼通信综合布线系统YD\u002FT 926》的适用范围是跨度不超过3000米、建筑面积不超过（）万平方米的布线区域。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","50",false,{"key":24,"text":25,"correct":22},"B","200",{"key":27,"text":28,"correct":22},"C","150",{"key":30,"text":31,"correct":32},"D","100",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},384979,"就招标投标的性质而言，中标通知书与《中华人民共和国合同法》中（ ）相对应",[38,40,42,44],{"key":20,"text":39,"correct":32},"承诺",{"key":24,"text":41,"correct":22},"还约",{"key":27,"text":43,"correct":22},"要约",{"key":30,"text":45,"correct":22},"要约邀请",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},384980,"GB\u002FT16260-1996给出的质量特性中，不包括（）",[50,52,54,56],{"key":20,"text":51,"correct":22},"功能性",{"key":24,"text":53,"correct":22},"效率",{"key":27,"text":55,"correct":32},"软件环境",{"key":30,"text":57,"correct":22},"可移植性",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},384981,"根据《软件文档管理指南》（GB\u002FT 16680—1996），以下关于文档评审的叙述，（）是不正确的。",[62,64,66,68],{"key":20,"text":63,"correct":22},"需求评审进一步确认开发者和设计者已了解用户要求什么及用户从开发者一方了解某些限制和约束",{"key":24,"text":65,"correct":22},"在概要设计评审过程中主要详细评审每个系统组成部分的基本设计方法和测试计划，系统规格说明应根据概要设计评审的结果加以修改",{"key":27,"text":67,"correct":22},"设计评审产生的最终文档规定系统和程序将如何设计开发和测试以满足一致同意的需求规格说明书",{"key":30,"text":69,"correct":32},"详细设计评审主要评审计算机程序、程序单元测试计划和集成测试计划",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},384982,"某公司计划建立一套ERP系统，在一家建设单位协助下开始招标工作。在以下招标过程中，不符合《招标投标法》有关规定的是()",[74,76,78,80],{"key":20,"text":75,"correct":22},"公司在编制了招标文档以后，于3月4日发出招标公告，规定投标截止时间为3月25日17时",{"key":24,"text":77,"correct":32},"国内公司在收到五家公司的投标书后，开始制订相应的评标标准，并且邀请了5位行业专家和2名公司领导组成7人评标委员会",{"key":27,"text":79,"correct":22},"在评标会议上，评标委员会认为T公司的投标书虽然满足投标档中规定的各项要求，但报价低于成本价，因此选择了投标书而言满足要求而报价次低的S公司作为中标单位",{"key":30,"text":81,"correct":22},"在4月1日发布中标公告后，S公司虚妄修改合同中的付款方式，双方经过多次协商后，于4月28日正式签订了ERP项目合同",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},384983,"在计算机软件质量保证计划规范GB\u002FT1250-2008中规定，为了保证软件的实现满足需求，需要的基本文档中可以不包括（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"软件需求规格说明书",{"key":24,"text":89,"correct":22},"软件设计说明书",{"key":27,"text":91,"correct":22},"软件验证和确认计划",{"key":30,"text":93,"correct":32},"项目进度报告",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},384984,"根据《中华人民共和国招投标法》，以下做法正确的是（）",[98,100,102,104],{"key":20,"text":99,"correct":22},"某项目于2月1日公开发布招标文件，标明截止时间为2011年2月14日9时整",{"key":24,"text":101,"correct":32},"开标应当在招标文件确定的提交投标文件截止时间的同一时间公开进行",{"key":27,"text":103,"correct":22},"某项目的所有投标都不符合招标文件要求，评标委员会在与招标方商量后，确定其中最接近投标文件要求的一家公司中标",{"key":30,"text":105,"correct":22},"联合投标的几家企业中只需一家达到招标文件要求的资质即可",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},384985,"根据EIA\u002FTIA568A标准，综合布线系统分为6个子系统，这6个子系统是（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"建筑群子系统、建筑间子系统、设备间子系统、垂直干线子系统、水平子系统、管理子系统",{"key":24,"text":113,"correct":22},"建筑间子系统、设备间子系统、垂直干线子系统、水平子系统、管理子系统、工作区子系统",{"key":27,"text":115,"correct":22},"建筑群子系统、建筑间子系统、垂直干线子系统、水平子系统、管理子系统、工作区子系统",{"key":30,"text":117,"correct":32},"建筑群子系统、设备间子系统、垂直干线子系统、水平子系统、管理子系统、工作区子系统",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},384986,"在设计计算机机房时，（ ）做法是不恰当的。",[122,124,126,128],{"key":20,"text":123,"correct":32},"机房设置在20层大楼的18层，该楼层人员流动最少",{"key":24,"text":125,"correct":22},"机房设置在大楼偏角上。远离停车场及运输通道等公共区域",{"key":27,"text":127,"correct":22},"考察机房所在附近区域，避开油库和其他易燃物",{"key":30,"text":129,"correct":22},"为机房设置较完备的中央空调系统，保证机房各区域温度变化满足计算机系统要求",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},384987,"RS-232-C的电气特性采用V.28标准电路，允许的数据速率是19.2Kbps，传输距离不大于 （） 。",[134,136,138,140],{"key":20,"text":135,"correct":22},"1m",{"key":24,"text":137,"correct":32},"15m",{"key":27,"text":139,"correct":22},"100m",{"key":30,"text":141,"correct":22},"1Km",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":30,"analysis":33},384988,"根据《中华人民共和国政府采购法》规定，采购人与中标、成交供应商应当在中标、成交通知书发出之日起（ ）内签订政府采购合同。",[146,148,150,152],{"key":20,"text":147,"correct":22},"15日",{"key":24,"text":149,"correct":22},"20日",{"key":27,"text":151,"correct":22},"28日",{"key":30,"text":153,"correct":32},"30日",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},384989,"根据《软件文档管理指南GB\u002FT 16680-1996》，为了编制高质量文档，必须得到的必要资源有三类。下列选项中 （） 是不需要的。",[158,160,162,164],{"key":20,"text":159,"correct":32},"技术",{"key":24,"text":161,"correct":22},"人员",{"key":27,"text":163,"correct":22},"设备",{"key":30,"text":165,"correct":22},"资金",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},384990,"某大型系统集成项目进行公开招标，要求投标人具有计算机系统集成二级资质，甲、乙两家企业为提高竞争力、增加投标成功的可能性，组成联合体以一个投标人的身份共同投标，如出现以下()情况，甲、乙两家企业组成的联合体将无法满足该项目的招标要求。",[170,172,174,176],{"key":20,"text":171,"correct":22},"甲、乙两家企业共同按照招标文件的要求编制投标文件，对招标文件提出的实质性要求和条件做出了响应",{"key":24,"text":173,"correct":32},"甲企业具有计算机系统集成二级资质，乙企业具有计算机系统集成三级资质",{"key":27,"text":175,"correct":22},"甲、乙两家企业签订了共同投标协议，并将该协议连同投标文件一并提交招标人",{"key":30,"text":177,"correct":22},"甲、乙两家企业经过协商，对招标项目提出了略低于市场价格的报价",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},384991,"根据《中华人民共和国招标投标法》，以下有关招标文件的说法中，（）是错误的。",[182,184,186,188],{"key":20,"text":183,"correct":32},"针对邀请招标，招标人应当根据潜在投标人的情况和特点编制招标文件",{"key":24,"text":185,"correct":22},"国家对招标项目的技术、标准有规定的，招标人应当按照其规定在招标文件中提出相应要求。",{"key":27,"text":187,"correct":22},"招标文件应当包括招标项目的技术要求、对投标人资格审查的标准、投标报价要求和评标标准等所有实质性要求和条件以及拟签订的合同主要条款。",{"key":30,"text":189,"correct":22},"招标项目需要划分标段、确定工期的，招标人应当合理划分标段、确定日期，并在招标文件中载明",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":30,"analysis":33},384992,"根据《电子计算机机房设计规范》GB50174-93，电子计算机机房应采用四种接地方式。将电气设备的金属外壳通过接地装置与大地直接连接起来是安全工作接地。根据《建筑物防雷设计规范》（GB 50057-1990），每根引下线的冲击接地电阻不宜大于()欧姆。",[194,196,198,200],{"key":20,"text":195,"correct":22},"3",{"key":24,"text":197,"correct":22},"4",{"key":27,"text":199,"correct":22},"5",{"key":30,"text":201,"correct":32},"10",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":30,"analysis":33},384993,"在合同协议书内应明确注明开工日期、竣工日期和合同工期总日历天数。其中工期总日历天数应为（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"招标文件要求的天数",{"key":24,"text":209,"correct":22},"经政府主管部门认可的天数",{"key":27,"text":211,"correct":22},"工程实际需要施工的天数",{"key":30,"text":213,"correct":32},"投标书内投标人承诺的天数",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},384994,"在我国的标准化代号中，属于推荐性国家标准代号的是（） 。",[218,220,222,224],{"key":20,"text":219,"correct":22},"GB",{"key":24,"text":221,"correct":32},"GB\u002FT",{"key":27,"text":223,"correct":22},"GB\u002FZ",{"key":30,"text":225,"correct":22},"GJB",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},384995,"()属于《合同法》规定的合同内容。",[230,232,234,236],{"key":20,"text":231,"correct":22},"风险责任的承担",{"key":24,"text":233,"correct":32},"争议解决方法",{"key":27,"text":235,"correct":22},"验收标准",{"key":30,"text":237,"correct":22},"测试流程",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},384996,"根据《信息安全技术信息系统安全通用性技术要求GB\u002FT 27201-2006》，信息系统安全的技术体系包括（26）",[242,244,246,248],{"key":20,"text":243,"correct":32},"物理安全、运行安全、数据安全",{"key":24,"text":245,"correct":22},"物理安全、网络安全、运行安全",{"key":27,"text":247,"correct":22},"人类安全、资源安全、过程安全",{"key":30,"text":249,"correct":22},"方法安全、过程安全、工具安全",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},384997,"根据《软件文档管理指南GB\u002FT16680-1996》，关于软件文档的归档工作，下列说法中（）是不正确的。",[254,256,258,260],{"key":20,"text":255,"correct":32},"软件文档必须在项目开发过程结束之后统一归档",{"key":24,"text":257,"correct":22},"归档的文档应是经过鉴定或评审的",{"key":27,"text":259,"correct":22},"文档应签署完整、成套、格式统一、字迹工整",{"key":30,"text":261,"correct":22},"印制本、打印本以及各种报告应装订成册并按规定进行编号签署",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},384998,"依据《中华人民共和国招投标法》， （） 必须进行招标。",[266,268,270,272],{"key":20,"text":267,"correct":22},"政府部门为大型项目选择可行性研究服务提供方",{"key":24,"text":269,"correct":22},"政府部门为涉及抢险救灾项目选择承建方",{"key":27,"text":271,"correct":32},"为国际组织援助的项目选择承建方",{"key":30,"text":273,"correct":22},"为私有企业投资的信息管理系统选择承建方",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},384999,"根据《计算机信息系统集成资质等级评定条件（2012 年修订版）》，关于计算机信息系统集成项目管理人员资质的人数要求，下面说法不正确的是 （ ） 。",[278,280,282,284],{"key":20,"text":279,"correct":22},"一级资质企业要求具有计算机信息系统集成项目管理人员资质的人数不少于30名，其中高级项目经理人数不少于10名",{"key":24,"text":281,"correct":22},"二级资质企业要求具有计算机信息系统集成项目管理人员资质的人数不少于18名，其中高级项目经理人数不少于4名",{"key":27,"text":283,"correct":32},"三级资质企业要求具有计算机信息系统集成项目管理人员资质的人数不少于5名，其中高级项目经理人数不少于2名",{"key":30,"text":285,"correct":22},"四级资质企业要求具有计算机信息系统集成项目管理人员资质的人数不少于2名",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},385000,"依据《中华人民共和国招标投标法》，公开招标是指招标人以招标公告的方式邀请 投标。",[290,292,294,296],{"key":20,"text":291,"correct":22},"特定的法人或者其他组织",{"key":24,"text":293,"correct":32},"不特定的法人或者其他组织",{"key":27,"text":295,"correct":22},"通过竞争性谈判的法人或者其他组织",{"key":30,"text":297,"correct":22},"单一来源的法人或者其他组织",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},385001,"根据《信息安全技术 信息系统安全通用技术要求GB\u002FT 20271-2006》，风险分析属于 （）",[302,304,306,308],{"key":20,"text":303,"correct":22},"物理安全",{"key":24,"text":305,"correct":32},"运行安全",{"key":27,"text":307,"correct":22},"数据安全",{"key":30,"text":309,"correct":22},"方法安全",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},385002,"在建设工程合同的订立过程中，投标人根据招标内容在约定期限内向招标人提交的投标文件，此为 （ ） 。",[314,315,316,317],{"key":20,"text":45,"correct":22},{"key":24,"text":43,"correct":32},{"key":27,"text":39,"correct":22},{"key":30,"text":318,"correct":22},"承诺生效",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":20,"analysis":33},385003,"下列关于电子信息机房的设计中， （） 不符合《电子信息系统机房设计规范GB50174-2008》的要求。",[323,325,327,329],{"key":20,"text":324,"correct":32},"机房采用二级、三级耐火等级的建筑材料，重要部位采用一级耐火等级的材料",{"key":24,"text":326,"correct":22},"机房所有设备的金属外壳、各类金属管道、金属线糟、建筑物金属结构等结构等全部进行电位连接并接地",{"key":27,"text":328,"correct":22},"在机房吊顶上和活动地板下都设置火灾探测器",{"key":30,"text":330,"correct":22},"主机房内绝缘体的静电电位不大于1KV",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},385004,"根据《中华人民共和国合同法》，隐蔽工程在隐蔽以前，承包人应当通知 （ ） 来检查。若其没有及时来检查，承包人可以顺延工程日期，并有权要求赔偿停工等造成的损失。",[335,337,339,341],{"key":20,"text":336,"correct":22},"承建人",{"key":24,"text":338,"correct":32},"发包人",{"key":27,"text":340,"correct":22},"分包人",{"key":30,"text":342,"correct":22},"设计方",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":27,"analysis":33},385005,"关于知识产权的理解，不正确的是（ ）",[347,349,351,353],{"key":20,"text":348,"correct":22},"知识产权的客体不是有形物，而S是知识，信息等抽象物",{"key":24,"text":350,"correct":22},"知识产权具有地域性，即在本国获得承认和保护的知识产权不具有域外效力",{"key":27,"text":352,"correct":32},"对于专利权的或外效力，可以依赖国际公约或者双边协定取得",{"key":30,"text":354,"correct":22},"知识产权具有一定的有效期限，无法永远程序",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":30,"analysis":33},385006,"某市经济管理部门规划经济监测信息系统，由于该领域的专业性和复杂性，拟采取竞争性谈判的方式进行招标。该部门自行编制谈判文件并在该市政府采购信息网发布采购信息，谈判文件要求自谈判文件发出12天内提交投标文档、第15天进行竞争性谈判。谈判小组由建设方代表1人、监察部门1人、技术专家3人共同组成，并邀请3家有行业经验的IT厂商参与谈判。在此次竞争性谈判中存在的问题是 （ ） 。",[359,361,363,365],{"key":20,"text":360,"correct":22},"该部门不应自行编制谈判文件，应委托中介机构编制",{"key":24,"text":362,"correct":22},"谈判文件发布后12日提交投标文件违反了“招投标类采购自招标文件发出之日起至投标人提交投标文件截止之日止，不得少于20天”的要求。",{"key":27,"text":364,"correct":22},"应邀请3家以上（不含3家）IT厂商参与谈判",{"key":30,"text":366,"correct":32},"谈判小组人员组成不合理",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":30,"analysis":33},385007,"根据GB\u002FT 12504-1990《计算机软件质量保证计划规范》，为确保软件的实现满足需求，需要一些基本的文档：（）不属于基本文档。",[371,373,374,375],{"key":20,"text":372,"correct":22},"软件需求规格说明",{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":22},{"key":30,"text":376,"correct":32},"项目开发总结",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},385008,"某高校准备建设一个容纳50位学生上机的机房，假设每一计算机系统及其他的设备投影面积为1.5平方米，则该机房最小面积应该为（）平方米。",[381,382,384,386],{"key":20,"text":28,"correct":22},{"key":24,"text":383,"correct":32},"375",{"key":27,"text":385,"correct":22},"450",{"key":30,"text":387,"correct":22},"525",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":30,"analysis":33},385009,"当 （ ） 时，依照政府采购法，不能采用单一来源方式采购。",[392,394,396,398],{"key":20,"text":393,"correct":22},"只有唯一供应商提供货物",{"key":24,"text":395,"correct":22},"发生了不可预见的紧急情况不能从其他供应商处采购",{"key":27,"text":397,"correct":22},"必须保证原有采购项目一致性或者服务配套的要求，需要继续从原供应商处添购，且添购金总额不超过原合同采购金额百分之十",{"key":30,"text":399,"correct":32},"采用公开招标方式的费用占政府采购项目总价值的比例过大",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},385010,"依据《电子信息系统机房设计规范》（GB 50174-2008），机房内通道的宽度及门的尺寸应满足设备和材料的运输要求，建筑入口至主机房的通道净宽不应小于()",[404,406,408,410],{"key":20,"text":405,"correct":22},"1.2 米",{"key":24,"text":407,"correct":32},"1.5 米",{"key":27,"text":409,"correct":22},"1.8 米",{"key":30,"text":411,"correct":22},"2.0 米",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":30,"analysis":33},385011,"某项目建设内容包括机房的升级改造，应用系统的开发以及系统的集成等。招标人于2010年3月25日在某国家级报刊上发布了招标公告，并规定4月20日上午9时为投标截止时间和开标时间。系统集成单位 A、 B、C购买了招标文件。在4月10日，招标人发现已发售的招标文件中某技术指标存在问题，需要进行澄清，于是在4月12日以书面形式通知 A、 B、C三家单位。根据《中华人民共和国招标投标法》，投标文件截止日期和开标日期应该不早于 （ ）",[416,418,420,422],{"key":20,"text":417,"correct":22},"5月5日",{"key":24,"text":419,"correct":22},"4月22日",{"key":27,"text":421,"correct":22},"4月25日",{"key":30,"text":423,"correct":32},"4月27日",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},385012,"根据《计算机软件文档编制规范GB\u002FT8567-2006》，文档在形成后都要实行质量控制，主要活动包括（）。1. 评审 2. 可用性测试 3. 走查4. 审查",[428,430,432,434],{"key":20,"text":429,"correct":32},"1234",{"key":24,"text":431,"correct":22},"12",{"key":27,"text":433,"correct":22},"134",{"key":30,"text":435,"correct":22},"234",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":27,"analysis":33},385013,"关于知识产权，以下说法不正确的是（）",[440,442,444,446],{"key":20,"text":441,"correct":22},"知识产权具有一定的有效期限，超过法定期限后，就成为社会共同财富",{"key":24,"text":443,"correct":22},"著作权、专利权、商标权皆属于知识产权范畴",{"key":27,"text":445,"correct":32},"知识产权具有跨地域性，一旦在某国取得产权承认和保护，那么在域外将具有同等效力",{"key":30,"text":447,"correct":22},"发明、文学和艺术作品等智力创造，都可被认为是知识产权",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":30,"analysis":33},385014,"根据《软件文档管理指南》（GB\u002FT 16680—1996），以下关于软件文档归类的叙述，（） 是不正确的",[452,454,456,458],{"key":20,"text":453,"correct":22},"开发文档描述开发过程本身",{"key":24,"text":455,"correct":22},"产品文档描述开发过程的产物",{"key":27,"text":457,"correct":22},"管理文档记录项目管理的信息",{"key":30,"text":459,"correct":32},"过程文档描述项目实施的信息",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":30,"analysis":33},385015,"在某单位招标过程中发生了如下事件，根据中华人民共和国招投标法及其实施条例，当出现 （ ） 之一时，评标委员会应当否决其投标。① 投标文件未经投标单位盖章和单位负责人签字② 同一投标人提交两个以上不同的投标文件，但招标文件未要求提交备选投标③ 投标报价高于招标文件设定的最高投标价④ 投标书中包括投标联合体共同签发的报价折扣声明",[464,466,468,470],{"key":20,"text":465,"correct":22},"①②",{"key":24,"text":467,"correct":22},"①②④",{"key":27,"text":469,"correct":22},"①③④",{"key":30,"text":471,"correct":32},"①②③",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":27,"analysis":33},385016,"合同法律关系是指由合同法律规范调整的在民事流转过程中形成的 。",[476,478,480,482],{"key":20,"text":477,"correct":22},"买卖关系",{"key":24,"text":479,"correct":22},"监督关系",{"key":27,"text":481,"correct":32},"权利义务关系",{"key":30,"text":483,"correct":22},"管控关系",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":24,"analysis":33},385017,"软件可靠性和可维护性是软件的一项重要特性，根据GB\u002FT14394-2008中对其的描述，在软件运作和维护过程中，()不属于分析和提高软件可靠性的措施。",[488,490,492,494],{"key":20,"text":489,"correct":22},"实施FRACAS",{"key":24,"text":491,"correct":32},"跟踪用户功能要求",{"key":27,"text":493,"correct":22},"跟踪用户满意程度",{"key":30,"text":495,"correct":22},"测量可靠性，并分析现场可靠性是否达到要求",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},385018,"某系统集成一级企业年项目合同额近3亿元。采购部门要面临从交换机到固定螺丝及相关服务的大量采购任务，下面的采购措施中，不可取的是 （ ） 。",[500,502,504,506],{"key":20,"text":501,"correct":32},"为防止采购人员可能出现经济问题，所有产品都按照统一规则、统一方法进行采购",{"key":24,"text":503,"correct":22},"按照重要程度将产品分为A类、B类、C类，分别制定采购规则，A类产品要通过招标，C类产品可简化采购手续",{"key":27,"text":505,"correct":22},"无论采购产品还是服务，都要建立对供应商的评价制度",{"key":30,"text":507,"correct":22},"建立和维护合格供应商名录来缩小采购选择的范围",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":27,"analysis":33},385019,"根据《计算机软件产品开发文件编制指南》，用户手册应在（）开始编制。",[512,514,516,518],{"key":20,"text":513,"correct":22},"可行性研究与计划阶段",{"key":24,"text":515,"correct":22},"设计时间",{"key":27,"text":517,"correct":32},"需求分析阶段",{"key":30,"text":519,"correct":22},"运行与维护阶段",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":27,"analysis":33},385020,"《合同法》规定，价款或酬金约定不明的，按 的市场价格履行。",[524,526,528,530],{"key":20,"text":525,"correct":22},"订立合同时订立地",{"key":24,"text":527,"correct":22},"履行合同时订立地",{"key":27,"text":529,"correct":32},"订立合同时履行地",{"key":30,"text":531,"correct":22},"履行合同时履行地",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":30,"analysis":33},385021,"根据((GB\u002FT 19000－ISO9000(2000)》的定义，质量管理是指确立质量方针及实施质量方针的全部职能及工作内容，并对其工作效果进行（ ）的一系列工作。",[536,538,540,542],{"key":20,"text":537,"correct":22},"考核和评价",{"key":24,"text":539,"correct":22},"评价和记录",{"key":27,"text":541,"correct":22},"预测和评价",{"key":30,"text":543,"correct":32},"评价和改进",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":27,"analysis":33},385022,"根据《中华人民共和国招标投标法》第四十八条对中标人的权利和义务的规定， () 是不正确的。",[548,550,552,554],{"key":20,"text":549,"correct":22},"中标人不得向他人转让中标项目，也不得将中标项目肢解后分别向他人转让",{"key":24,"text":551,"correct":22},"中标人按照合同约定或者经招标人同意，可以将中标项目的部分非主体、非关键性工作分包给他人完成",{"key":27,"text":553,"correct":32},"接受分包的人可以再次分包",{"key":30,"text":555,"correct":22},"中标人应当就分包项目向招标人负责，接受分包的人就分包项目承担连带责任",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":27,"analysis":33},385023,"在《软件文档管理指南GB\u002FT16680-1996》中，对确定文档的质量等级作了规定，软件文档的质量可以按照文档的形式和列出的要求划分为四个等级。对于由同一单位 内若干人联合开发的程序，或要交由其它单位使用的程序，应该达到 （） 级的要求。",[560,562,564,566],{"key":20,"text":561,"correct":22},"一",{"key":24,"text":563,"correct":22},"二",{"key":27,"text":565,"correct":32},"三",{"key":30,"text":567,"correct":22},"四",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":20,"analysis":33},385024,"乙公司中标承接了甲机构的办公自动化应用系统集成项目，在合同中约定：甲乙双方一旦出现分歧，在协商不成时，可提交到相关机构裁定。通常，优先选择的裁定机构是（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":32},"甲机构所在地的仲裁委员会",{"key":24,"text":575,"correct":22},"甲机构所在地的人民法院",{"key":27,"text":577,"correct":22},"乙公司所在地的仲裁委员会",{"key":30,"text":579,"correct":22},"乙公司所在地的人民法院",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":27,"analysis":33},385025,"一般情况下，（）属于软件项目非功能性需求。",[584,586,588,590],{"key":20,"text":585,"correct":22},"操作界面差异性",{"key":24,"text":587,"correct":22},"系统配置内容",{"key":27,"text":589,"correct":32},"系统稳定性",{"key":30,"text":591,"correct":22},"系统联机帮助",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},385026,"组织项目招标要按照《中华人民共和国招标投标法》进行。以下叙述中， （ ） 是不正确的。",[596,598,600,602],{"key":20,"text":597,"correct":22},"公开招标和邀请招标都是常用的招标方式",{"key":24,"text":599,"correct":32},"公开招标是指招标人以招标公告方式邀请一定范围的法人或者其他组织投标",{"key":27,"text":601,"correct":22},"邀请招标是指招标人以投标邀请书的方式邀请特定的法人或者其他组织投标",{"key":30,"text":603,"correct":22},"招标人是依照本法规定提出招标项目、进行招标的法人或者其他组织",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":24,"analysis":33},385027,"根据《国家电子政务工程建设项目管理暂行办法》，项目设计方案和投资预算，报告的编制内容与项目可行性研究报告批复内容不符合，且变更投资一旦超出已批复总投资额度 （ ）的，应重新撰写可行性研究报告。",[608,610,612,614],{"key":20,"text":609,"correct":22},"5%",{"key":24,"text":611,"correct":32},"10%",{"key":27,"text":613,"correct":22},"15%",{"key":30,"text":615,"correct":22},"20%",[617,621,624,627,630,633],{"id":618,"name":619,"category":7,"favorite":620},136,"法律职业试卷二(客观题 )",2,{"id":622,"name":623,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":625,"name":626,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":628,"name":629,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":631,"name":632,"category":7,"favorite":8},28,"安全工程师",{"id":634,"name":635,"category":7,"favorite":8},112,"安全生产法律知识"]