[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,21,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,390,402,414,426,438,450,462,474,486,498,510,522,534,546,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},384928,1,"单选题","某项目承包者预计该项目有 0.5 的概率获利 200000 美元,0.3 的概率亏损 50000 美元,还有 0.2 的概率维持平衡.该项目的期望货币价 值为( )美元。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","200000",false,{"key":24,"text":25,"correct":26},"B","85000",true,{"key":28,"text":29,"correct":22},"C","50000",{"key":31,"text":32,"correct":22},"D","180000","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},384929,"在风险识别时，可以用到多种工具和技术。其中，（ ）指的是从项目的优势、劣势、机会和威胁出发，对项目进行考察，从而更全面地考虑风险。",[38,40,42,44],{"key":20,"text":39,"correct":22},"头脑风暴法",{"key":24,"text":41,"correct":22},"因果图",{"key":28,"text":43,"correct":26},"SWOT 分析法",{"key":31,"text":45,"correct":22},"专家判断法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},384930,"定性风险分析工具和技术不包括 。",[50,52,54,56],{"key":20,"text":51,"correct":22},"概率及影响矩阵",{"key":24,"text":53,"correct":26},"建模技术",{"key":28,"text":55,"correct":22},"风险紧急度评估",{"key":31,"text":57,"correct":22},"风险数据质量评估",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},384931,"由于员工对一些新技术的使用缺乏经验，而导致项目偏离轨迹，那么项目发起人可以通过 （ ） 来减少这一风险。",[62,64,66,68],{"key":20,"text":63,"correct":22},"启动风险应急计划",{"key":24,"text":65,"correct":26},"从应急储备中拨出一部分资金，雇佣外部的顾问，为项目成员使用新技术提供培训和咨询",{"key":28,"text":67,"correct":22},"对项目利害关系者的承受水平进行修订，以适应这一突发状况",{"key":31,"text":69,"correct":22},"对这一问题进行记录、界定，并与相关人员进行必要的沟通",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},384932,"某公司经过SWOT（Strength优势、Weakness劣势、Opportunity机会、Threat威软件风险是指在软件开发过程中面临的一些不确定性和可能造成的损失。软件风险大致可以分为三类：项目风险、技术风险和商业风险。下列叙述中， （ ） 属于商业风险。",[74,76,78,80],{"key":20,"text":75,"correct":22},"软件的开发时间可能会超出预期时间",{"key":24,"text":77,"correct":22},"采用的开发技术过于先进，技术本身尚不稳定",{"key":28,"text":79,"correct":22},"软件开发过程中需求一直未能稳定下来",{"key":31,"text":81,"correct":26},"软件开发过程没有得到预算或人员上的保证",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},384933,"因时间紧，任务急，经过评估，某智能监控软件涉及的图像传输速度与精度指标难以满足用户需求，故项目团队欲将该软件开发分包给技术实力很强的企业完成。这种风险应对措施被称为风险 （ ） 。",[86,88,90,92],{"key":20,"text":87,"correct":22},"接受",{"key":24,"text":89,"correct":22},"规避",{"key":28,"text":91,"correct":22},"减轻",{"key":31,"text":93,"correct":26},"转移",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},384934,"评估信息系统安全时，需要对风险项进行量化来综合评估安全等级。如果对于需求变化频繁这一事件，其发生概率为0.5，产生的风险影响值为5，则该风险项的风险值为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"10",{"key":24,"text":101,"correct":22},"5.5",{"key":28,"text":103,"correct":22},"4.5",{"key":31,"text":105,"correct":26},"2.5",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},384935,"风险可以从不同的角度、根据不同的标准来进行分类。百年不遇的暴雨属于（ ）",[110,112,114,116],{"key":20,"text":111,"correct":26},"不可预测风险",{"key":24,"text":113,"correct":22},"可预测风险",{"key":28,"text":115,"correct":22},"已知风险",{"key":31,"text":117,"correct":22},"技术风险",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},384936,"项目面临的各种风险中,( )对客户的影响最为深远。",[122,124,126,128],{"key":20,"text":123,"correct":22},"范围风险",{"key":24,"text":125,"correct":22},"进度风险",{"key":28,"text":127,"correct":22},"成本风险",{"key":31,"text":129,"correct":26},"质量风险",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},384937,"风险定量分析是在不确定情况下进行决策的一种量化方法，该过程经常采用的技术有（ ）",[134,136,138,140],{"key":20,"text":135,"correct":26},"蒙特卡罗分析法",{"key":24,"text":137,"correct":22},"SWOT分析法",{"key":28,"text":139,"correct":22},"检查表分析法",{"key":31,"text":141,"correct":22},"预测技术",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},384938,"风险识别的方式从专家争执中收集意见并综合，从而对将来的可能风险做出预测的风险识别工具是（）",[146,148,150,152],{"key":20,"text":147,"correct":22},"风险分解结构",{"key":24,"text":149,"correct":22},"头脑风暴",{"key":28,"text":151,"correct":22},"错误方法",{"key":31,"text":153,"correct":26},"德尔菲法",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},384939,"项目范围基准应用于识别风险过程，其（）",[158,160,162,164],{"key":20,"text":159,"correct":22},"识别了所有必需完成的工作，因此包括了项目的所有风险",{"key":24,"text":161,"correct":26},"识别了项目假设",{"key":28,"text":163,"correct":22},"有助于把项目中所有必需完成的工作组织起来",{"key":31,"text":165,"correct":22},"包括以往项目的风险信息",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},384940,"以下关于定性风险分析的描述中，不正确的是()",[170,172,174,176],{"key":20,"text":171,"correct":22},"定性风险分析需要考虑风险发生的概率及其后果的影响性",{"key":24,"text":173,"correct":26},"实施定性风险分析的方法中包括SWOT分析法",{"key":28,"text":175,"correct":22},"通常情况下技术含量越高的项目，其风险程度也越高",{"key":31,"text":177,"correct":22},"定性风险分析的工作成果之一是按优先级形成风险总排队",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},384941,"以下关于定性风险的说法中，错误的是（）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"风险概率分析指调查每项具体风险的发生的可能性",{"key":24,"text":185,"correct":22},"风险影响评估旨在分析风险对项目目标的潜在影响",{"key":28,"text":187,"correct":26},"风险影响评估值包括消极影响或威胁，不包括积极影响或机会",{"key":31,"text":189,"correct":22},"可以让专家通过召开会议或进行访谈的方式对风险进行评估",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},384942,"在风险监控中，如果出现了风险登记单未预期的风险或“观察清单”未包含的风险，应该（）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"进行额外的风险应对规划",{"key":24,"text":197,"correct":22},"进行风险审计",{"key":28,"text":199,"correct":22},"进行变差和趋势分析",{"key":31,"text":201,"correct":22},"召开状态审查会",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},384943,"风险转移是设法将风险的后果连同应对的责任转移到他方的风险应对措施，（）不属于风险转移的措施。",[206,208,210,212],{"key":20,"text":207,"correct":22},"履约保证书",{"key":24,"text":209,"correct":22},"购买保险",{"key":28,"text":211,"correct":22},"第三方担保",{"key":31,"text":213,"correct":26},"改变工艺流程",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},384944,"根据风险的概率，及其风险发生的影响量对风险进行优先级排列的风险管理步骤是（）",[218,220,222,224],{"key":20,"text":219,"correct":22},"制订风险管理机制",{"key":24,"text":221,"correct":22},"风险识别",{"key":28,"text":223,"correct":26},"实施定性风险分析",{"key":31,"text":225,"correct":22},"定量风险分析",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},384945,"德尔菲技术作为风险识别的一种方法，主要用途是（）",[230,232,234,236],{"key":20,"text":231,"correct":22},"为决策者提供图表式的决策选择次序",{"key":24,"text":233,"correct":22},"确定具体偏差出现的概率",{"key":28,"text":235,"correct":22},"有助于将决策者对风险的态度考虑进去",{"key":31,"text":237,"correct":26},"减少分析过程中的偏见，防止任何人对事件结果施加不正确的影响",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},384946,"关于项目的风险管理，下列说法中，（）是不正确的。",[242,244,246,248],{"key":20,"text":243,"correct":22},"风险管理包括风险识别、定性分析、定量分析、风险应对、风险监控等过程",{"key":24,"text":245,"correct":22},"定性风险分析后，可制定和采取风险应对措施",{"key":28,"text":247,"correct":22},"制定风险应对措施后，可重新进行定量风险分析，以确定风险降低的程度",{"key":31,"text":249,"correct":26},"风险管理的最终目标是消除风险",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},384947,"建立一个概率模型或者随机过程，使它的参数等于问题的解，然后通过对模型或过程的观察计算所求参数的统计特征，最后给出所求问题的近似值，解的精度可以用估计值的标准差表示。这种技术称为（）方法。",[254,256,258,260],{"key":20,"text":255,"correct":22},"期望货币分析",{"key":24,"text":257,"correct":22},"决策树分析",{"key":28,"text":259,"correct":26},"蒙特卡洛分析",{"key":31,"text":261,"correct":22},"优先顺序图",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},384948,"以下关于风险概率与影响评估的叙述中， （ ） 是不正确的。",[266,268,270,272],{"key":20,"text":267,"correct":26},"风险概率与影响评定是定量风险分析的一种方法",{"key":24,"text":269,"correct":22},"风险概率分析指调查每项其体风险发生的可能性",{"key":28,"text":271,"correct":22},"风险影响评估旨在分析风险对项目目标的潜在影响，包括消极影响或威胁、积极影响或机会",{"key":31,"text":273,"correct":22},"可采用会议或访谈等方式对风险进行评估，组织的历史数据或经验不足时，需要专家做出判断。",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},384949,"某公司经过SWOT（Strength优势、Weakness劣势、Opportunity机会、Threat威胁）分析后形成的表格如下，依据其中⑤号区域的内容而制定的战略属于 （ ）",[278,280,282,284],{"key":20,"text":279,"correct":26},"抓住机遇、发挥优势的战略",{"key":24,"text":281,"correct":22},"利用机会、克服弱点的战略",{"key":28,"text":283,"correct":22},"利用优势、减少威胁的战略",{"key":31,"text":285,"correct":22},"弥补缺点：规避威胁的战略",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},384950,"在进行风险评估时，如果发现风险概率和影响很低，可 （ ） 。",[290,292,294,296],{"key":20,"text":291,"correct":26},"将该风险作为待观察项目列入清单中，供将来进一步监测",{"key":24,"text":293,"correct":22},"对该风险进行等级排序",{"key":28,"text":295,"correct":22},"着手清楚该风险",{"key":31,"text":297,"correct":22},"不做任何措施",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},384951,"在一个信息系统集成项目中，对项目涉及的客户端、服务器、网络和运行环境等进行集成时，不确定会遇到什么问题，这对项目来说是一个风险，因此项目经理计划找一个以前有相关技术经验的专家来处理这个风险。该应对措施属于（）",[302,304,306,308],{"key":20,"text":303,"correct":22},"风险接受",{"key":24,"text":305,"correct":22},"风险转移",{"key":28,"text":307,"correct":22},"风险规避",{"key":31,"text":309,"correct":26},"风险减轻",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},384952,"在信息系统试运行阶段，系统失效将对业务造成影响。针对该风险，如果采取“接受”的方式进行应对，应该（）",[314,316,318,320],{"key":20,"text":315,"correct":22},"签订一份保险合同，减轻中断带来的损失",{"key":24,"text":317,"correct":22},"找出造成系统中断的各种因素，利用帕累托分析减轻和消除主要因素",{"key":28,"text":319,"correct":22},"设置冗余系统",{"key":31,"text":321,"correct":26},"建立相应的应急储备",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},384953,"某系统集成企业为做好项目风险管理，给风险定义了3个参数。 1. 风险严重性：指风险对项目造成的危害程度； 2. 风险可能性：指风险发生的几率； 3. 风险系数：是风险严重性和风险可能性的乘积。 其中，对项目进度延误、工作量偏差的风险严重性等级和风险可行性等级如下表所示。 假定该企业将风险系数大于等于6的情况定义为红灯状态，需要优先处理，则下列 （ ） 的情况属于红灯状态。",[326,328,330,332],{"key":20,"text":327,"correct":22},"进度延误15%，工作量偏差15%，发生几率为0.5",{"key":24,"text":329,"correct":22},"进度延误15%，工作量偏差35%，发生几率为0.2",{"key":28,"text":331,"correct":26},"进度延误25%，工作量偏差15%，发生几率为0.4",{"key":31,"text":333,"correct":22},"进度延误15%，工作量偏差25%，发生几率为0.4",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},384954,"在应对风险的基本措施中， （ ） 属于消极风险应对策略。",[338,340,342,344],{"key":20,"text":339,"correct":26},"改变项目计划，以排除风险或条件，或者保护项目目标，使其不受影响，或对受到威胁的一些目标放松要求",{"key":24,"text":341,"correct":22},"为项目分配更多的有能力的资源，以便缩短完成时间或实现超过最初预期的高质量",{"key":28,"text":343,"correct":22},"将风险的责任分配给最能为项目的利益获取机会的第三方",{"key":31,"text":345,"correct":22},"通过提高风险的概率或其积极影响，识别并最大程度发挥这些风险的驱动因素，致力于改变机会的“大小”",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},384955,"软件项目中，技术风险威胁到要开发软件的质量及交付时间，而 （ ） 不属于技术风险",[350,352,354,356],{"key":20,"text":351,"correct":26},"采用先进技术开发目前尚无用户真正需要的产品或系统",{"key":24,"text":353,"correct":22},"软件需要使用新的或未经证实的硬件接口",{"key":28,"text":355,"correct":22},"产品需求中要求开发某些程序构件，这些构件与以前所开发的构件完全不同",{"key":31,"text":357,"correct":22},"需求中要求使用新的分析、设计或测试方法",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},384956,"The perform Integrated Change Contorl process is the uitimste responsbilityof the (请作答此空) ，Although changes my be intitated verbally,they should be recorded in writtern form and entered into the ( ) syste.",[362,364,366,368],{"key":20,"text":363,"correct":22},"resource manager",{"key":24,"text":365,"correct":22},"division manager",{"key":28,"text":367,"correct":22},"functional manager",{"key":31,"text":369,"correct":26},"projeet manager",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},384957,"ISO 安全体系结构定义了五种安全服务，其中（请作答此空）用于识别对象的身份并对身份证实。（ ）用于防止对资源的非授权访问，确保只有经过授权的实体才能访问受保护的资源",[374,376,378,380],{"key":20,"text":375,"correct":26},"安全认证服务",{"key":24,"text":377,"correct":22},"访问控制安全服务",{"key":28,"text":379,"correct":22},"数据保密性安全服务",{"key":31,"text":381,"correct":22},"数据完整性安全服务",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},384958,"ISO 安全体系结构定义了五种安全服务，其中（ ）用于识别对象的身份并对身份证实。（请作答此空）用于防止对资源的非授权访问，确保只有经过授权的实体才能访问受保护的资源",[386,387,388,389],{"key":20,"text":375,"correct":22},{"key":24,"text":377,"correct":26},{"key":28,"text":379,"correct":22},{"key":31,"text":381,"correct":22},{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":28,"analysis":33},384959,"对机房关键设备采用硬件备份、双机冗余等技术的基础上，采用相关的软件技术提供较强的管理机制、控制手段。这属于机房工程设计的（ ）原则",[394,396,398,400],{"key":20,"text":395,"correct":22},"实用性和先进性",{"key":24,"text":397,"correct":22},"灵活性和可扩展性",{"key":28,"text":399,"correct":26},"安全可靠性",{"key":31,"text":401,"correct":22},"可管理性",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":28,"analysis":33},384960,"根据《中华人民共和国招标投标法》，在系统集成项目招标过程中，（ ）应在开标之前完成",[406,408,410,412],{"key":20,"text":407,"correct":22},"答标",{"key":24,"text":409,"correct":22},"制定评标原则",{"key":28,"text":411,"correct":26},"确认投标人资格",{"key":31,"text":413,"correct":22},"发放中标通知书",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},384961,"系统集成商与建设方在一个 ERP 项目的谈判过程中，建设方提出如下要求：系统初验时间为 2010 年 6 月底(付款 50％)；正式验收时间为 2010 年 10 月底(累计付款 80％)；系统运行服务期限为一年(可能累计付款 100％)；并希望长期提供应用软件技术支持。系统集成商在起草项目建设合同时，合同期限设定到()为妥",[418,420,422,424],{"key":20,"text":419,"correct":22},"2010 年 10 月底",{"key":24,"text":421,"correct":22},"2011 年 6 月底",{"key":28,"text":423,"correct":26},"2011 年 10 月底",{"key":31,"text":425,"correct":22},"长期",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},384962,"根据《中华人民共和国招投标法》中关于招投标程序的规定，（）是错误的。",[430,432,434,436],{"key":20,"text":431,"correct":22},"招标人如采用公开招标方式的，应当公开发布招标公告；依法必须进行招标的项目的招标公告，应当通过国家指定的报刊、信息网络或者其他媒介发布。",{"key":24,"text":433,"correct":22},"招标人根据招标项目的具体情况，可以组织潜在投标人踏勘项目现场。",{"key":28,"text":435,"correct":26},"投标人应当在招标文件要求提交投标文件的截止时间前将投标文件送达投标地点。招标人收到投标文件后，应当签收，并当面开启进行初审。",{"key":31,"text":437,"correct":22},"评标由招标人依法组建的评标委员会负责，中标结果确定后，评标委员会成员的名单可以在中标公告中公布",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":28,"analysis":33},384963,"以下各项中，（）不属于知识产权。",[442,444,446,448],{"key":20,"text":443,"correct":22},"著作权",{"key":24,"text":445,"correct":22},"专利权",{"key":28,"text":447,"correct":26},"隐私权",{"key":31,"text":449,"correct":22},"商标权",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":31,"analysis":33},384964,"根据《中华人民共和国招投标法》，以下叙述中，不正确的是()",[454,456,458,460],{"key":20,"text":455,"correct":22},"两个以上法人或组织组成联合体共同投标时，联合体各方均应当具备承担招标项目的相应能力",{"key":24,"text":457,"correct":22},"联合体中标的，联合体各方应当共同与招标人签订合同，就中标专案向招标人承担连带责任",{"key":28,"text":459,"correct":22},"联合体各方应当签订共同招标协议，并将共同投标协议连同投标文档一并提交给投标人",{"key":31,"text":461,"correct":26},"有同一专业的单位组成的联合体，按照其中资质等级最高的单位确定资质等级",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":31,"analysis":33},384965,"某项目建设内容包括机房的升级改造、应用系统的开发以及系统的集成等。招标人于 2010 年 3 月 25 日在某国家级报刊上发布了招标公告，并规定4 月 20 日上午9 时为投标截止时间和开标时间。系统集成单位 A、 B、C 购买了招标文件。在 4 月 10 日，招标人发现已发售的招标文件中某技术指标存在问题，需要进行澄清，于是在 4 月 12 日以书面形式通知 A、 B、C 三家单位。根据《中华人民共和国招标投标法》，投标文件截止日期和开标日期应该不早于()",[466,468,470,472],{"key":20,"text":467,"correct":22},"5 月 5 日",{"key":24,"text":469,"correct":22},"4 月 22 日",{"key":28,"text":471,"correct":22},"4 月 25 日",{"key":31,"text":473,"correct":26},"4 月 27 日",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},384966,"根据《计算机软件质量保证计划规范 GB\u002FT 12504-1990》，为确保软件的实现满足需求而需要的基本文档中不包括()",[478,480,482,484],{"key":20,"text":479,"correct":26},"项目实施计划",{"key":24,"text":481,"correct":22},"软件验证与确认计划",{"key":28,"text":483,"correct":22},"软件设计说明书",{"key":31,"text":485,"correct":22},"软件需求规格说明书",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},384967,"依据《电子信息系统机房设计规范》（GB50174-2008），对于涉及国家秘密或企业对商业信息有保密要求的电子信息系统机房，应设置电磁屏蔽室。以下描述中，不符合该规范要求的是（）",[490,492,494,496],{"key":20,"text":491,"correct":22},"所有进入电磁屏蔽室的电源线缆应通过电源滤波器进行",{"key":24,"text":493,"correct":26},"进出电磁屏蔽室的网络线宜采用光缆或屏蔽线缆线，光光缆应带有金属加强芯",{"key":28,"text":495,"correct":22},"非金属材料穿过屏蔽层时应采用波导管，波导管的截面尺寸和长度应满足电磁屏蔽的性能要求",{"key":31,"text":497,"correct":22},"截止波导通风窗内的波导管宜采用等边六角形，通风窗的截面积应根据室内换气次数进行计算",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},384968,"某省政府釆用公开招标方式采购信息系统项目及服务，招标文件要求投标企业必须具备系统集成二级及其以上资质，提交证书复印件并加盖公章。开标当天共有5家企业在截止时间之前投递了标书。根据《中华人民共和国政府采购法》，如发生以下（）情况，本次招标将作废标处理",[502,504,506,508],{"key":20,"text":503,"correct":22},"有3家企业具备系统集成一级资质，有两家企业具备系统集成三级资质",{"key":24,"text":505,"correct":22},"有3家企业具备系统集成二级资质，有两家企业具备系统集成三级资质",{"key":28,"text":507,"correct":22},"5家企业都具有系统集成二级资质，其中有两家企业的系统集成二级资质证书有效期满未延续换证",{"key":31,"text":509,"correct":26},"有3家企业具备系统集成三级资质，有两家企业具备系统集成二级资质",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},384969,"根据《EIA\u002FTIA 568A\u002FB商用建筑物电信布线标准-1995》，综合布线系统分为三个等级，其中基本型综合布线等级要求每个工作区配线电缆至少有 （）对双绞线。",[514,516,518,520],{"key":20,"text":515,"correct":22},"1",{"key":24,"text":517,"correct":26},"2",{"key":28,"text":519,"correct":22},"3",{"key":31,"text":521,"correct":22},"4",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},384970,"依据《中华人民共和国招标投标法》，公开招标是指招标人以招标公告的方式邀请()投标。",[526,528,530,532],{"key":20,"text":527,"correct":22},"特定的法人或者其他组织",{"key":24,"text":529,"correct":26},"不特定的法人或者其他组织",{"key":28,"text":531,"correct":22},"通过竞争性谈判的法人或者其他组织",{"key":31,"text":533,"correct":22},"单一来源的法人或者其他组织",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":31,"analysis":33},384971,"某单位在机房建设和管理中采用的下列做法， （ ） 不符合《电子信息系统机房设计规范（GB—50174—2008）》。",[538,540,542,544],{"key":20,"text":539,"correct":22},"计算机系统的设备和部件设置了明显的无法去除的标记，以防更换和查找财物",{"key":24,"text":541,"correct":22},"禁止携带移动电话、电子记事本等具有移动互联功能的个人进入机房",{"key":28,"text":543,"correct":22},"主机房内设地漏，地漏下加设水封装置，并有防止水封破坏的措施",{"key":31,"text":545,"correct":26},"为机房内设备供水有给排水干管和引入的支管为明管，以便及时检修和更换",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":28,"analysis":33},384972,"某企业ERP项目拟采用公开招标方式选择系统集成商，2010年6月9日上午9时，企业向通过资格预审的甲、乙、丙、丁、戊5家企业发出了投标邀请书，规定投标截止时间为2010年7月19日下午5时。甲、乙、丙、戊4家企业在截止时间之前提交投标文件，但丁企业于2010年7月20日上午9时才送达投标文件。在评标过程中，专家组确认：甲企业投标文件有项目经理签字并加盖公章，但无法定代表人签字；乙企业投标报价中的大写金额与小写金额不一致；丙企业投标报价低于标底和其他四家的报价较多。以下论述不正确的是（）",[550,552,554,556],{"key":20,"text":551,"correct":22},"丁企业投标文件逾期，应不予接受",{"key":24,"text":553,"correct":22},"甲企业无法定代表人签字，做废标处理",{"key":28,"text":555,"correct":26},"丙企业报价不合理，做废标处理",{"key":31,"text":557,"correct":22},"此次公开招标依然符合投标人不少于三个的要求",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":20,"analysis":33},384973,"根据《软件工程一产品质量》 (GB\u002FT 16260.1-2006)定义的质量模型，不属于功能性的质量特性是()",[562,564,566,568],{"key":20,"text":563,"correct":26},"适应性",{"key":24,"text":565,"correct":22},"适合性",{"key":28,"text":567,"correct":22},"安全保密性",{"key":31,"text":569,"correct":22},"互操作性",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":28,"analysis":33},384974,"根据《中华人民共和国招标投标法》，招标的方式可分为()。",[574,576,578,580],{"key":20,"text":575,"correct":22},"公开招标和代理招标",{"key":24,"text":577,"correct":22},"邀请招标和自行招标",{"key":28,"text":579,"correct":26},"公开招标和邀请招标",{"key":31,"text":581,"correct":22},"公开招标和自行招标",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":31,"analysis":33},384975,"根据《中华人民共和国合同法》，（）不属于合同的权利义务终止的条件。",[586,588,590,592],{"key":20,"text":587,"correct":22},"债务已经按照约定履行",{"key":24,"text":589,"correct":22},"合同终止",{"key":28,"text":591,"correct":22},"债务相互抵销",{"key":31,"text":593,"correct":26},"债权债务同归于一人，且涉及第三人利益",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":31,"analysis":33},384976,"某公司系统安全管理员ZGY在建立公司的“安全管理体系”时，根据GB\u002FT20269，下列描述不正确的是 （ ） 。",[598,600,602,604],{"key":20,"text":599,"correct":22},"机房所在地应有专设警卫，通道和入口处应设置视频监控点",{"key":24,"text":601,"correct":22},"应明确机房安全管理的责任人，机房出入应有指定人员负责，未经允许的人员不准进入机房",{"key":28,"text":603,"correct":22},"获准进入机房的人员，一般应禁止携带个人计算机等电子设备进入机房，其活动范围和操作行为应受到限制，并有机房接待人员负责陪同",{"key":31,"text":605,"correct":26},"门禁系统的电子记录需及时删除",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":28,"analysis":33},384977,"诉讼时效期间从权利人知道或者应当知道权利被侵害起计算。但是，从权利被侵害之日起超过()年的，人民法院不予保护。",[610,611,613,615],{"key":20,"text":99,"correct":22},{"key":24,"text":612,"correct":22},"15",{"key":28,"text":614,"correct":26},"20",{"key":31,"text":616,"correct":22},"30",[618,622,625,628,631,634],{"id":619,"name":620,"category":7,"favorite":621},136,"法律职业试卷二(客观题 )",2,{"id":623,"name":624,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":626,"name":627,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":629,"name":630,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":632,"name":633,"category":7,"favorite":8},28,"安全工程师",{"id":635,"name":636,"category":7,"favorite":8},112,"安全生产法律知识"]