[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,20,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,282,294,306,318,330,342,354,366,378,387,399,410,420,432,444,456,468,480,492,504,516,528,540,551,563,575,587,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},384878,1,"单选题","在项目管理领域，经常把不受控制的变更称为项目“范围蔓延”。为了防止出现这种现象，需要控制变更。批准或拒绝变更申请的直接组织称为①，定义范围变更的流程包括必要的书面文件、②为授权变更的批准等级。 （ ）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","①变更控制委员会；②纠正行动、跟踪系统",true,{"key":24,"text":25,"correct":26},"B","①项目管理办公室；②偏差分析、配置管理",false,{"key":28,"text":29,"correct":26},"C","①变更控制委员会；②偏差分析、变更管理计划",{"key":31,"text":32,"correct":26},"D","①项目管理办公室；②纠正行动、配置管理","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},384879,"项目变更贯穿于整个项目过程的始终，项目经理应让项目干系人（特别是业主）认识到 （） 。",[38,40,42,44],{"key":20,"text":39,"correct":26},"在项目策划阶段，变更成本较高",{"key":24,"text":41,"correct":26},"在项目执行阶段，变更成本较低",{"key":28,"text":43,"correct":26},"在项目编码开始前，变更成本较低",{"key":31,"text":45,"correct":22},"在项目策划阶段，变更成本较低",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},384880,"某企业的管理系统已进入试运行阶段，公司领导在试用该系统时认为他使用的出差报销表格的栏目设置不合理，便电话要求负责系统建设的项目经理修改，根据变更管理的要求，项目经理正确的做法是（）",[50,52,54,56],{"key":20,"text":51,"correct":26},"告诉公司领导，项目试运行结束后再统一修改",{"key":24,"text":53,"correct":26},"让开发人员修改，再通知公司领导确认",{"key":28,"text":55,"correct":22},"将公司领导的要求记录下来，确认变更内容后提出正式的变更申请",{"key":31,"text":57,"correct":26},"亲自督促对该表格的修改，完成后亲自确认并向公司领导汇报。",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},384881,"以下有关变更控制方面的描述中，（）是正确的。",[62,64,66,68],{"key":20,"text":63,"correct":22},"任何变更都要得到三方（建设单位、监理单位和承建单位）的，严禁擅自变更",{"key":24,"text":65,"correct":26},"承建单位或建设单位是变更的申请者，监理方不能提出变更申请",{"key":28,"text":67,"correct":26},"承建单位提出变更申请，一般应首先递交业主初审，同意后再确定变更方法",{"key":31,"text":69,"correct":26},"建设单位不能提出变更申请",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},384882,"（ ）不属于变更控制过程所包含的变更管理活动",[74,76,78,80],{"key":20,"text":75,"correct":26},"识别可能发生的变更",{"key":24,"text":77,"correct":26},"维持所有基线的完整性",{"key":28,"text":79,"correct":26},"完成防灾演习等特定工作",{"key":31,"text":81,"correct":22},"系统升级",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},384883,"依据变更的重要性分类，变更一般分为（ ）、重要变更和一般变更。",[86,88,90,92],{"key":20,"text":87,"correct":26},"紧急变更",{"key":24,"text":89,"correct":22},"重大变更",{"key":28,"text":91,"correct":26},"标准变更",{"key":31,"text":93,"correct":26},"特殊变更",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},384884,"以下关于变更控制委员会CCB的描述中，（）是正确的。",[98,100,102,104],{"key":20,"text":99,"correct":26},"CCB是作业机构",{"key":24,"text":101,"correct":26},"CCB在审批变更时要提出变更",{"key":28,"text":103,"correct":26},"CCB项目经理不能进入",{"key":31,"text":105,"correct":22},"CCB的权利包含对储备资源的授权",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},384885,"变更管理的工作程序包括：接受变更申请、对变更的初审、（）、CCB决定是否批准、发出变更通知并开始实施、变更实施监控、变更效果评估。",[110,112,114,116],{"key":20,"text":111,"correct":26},"变更实施",{"key":24,"text":113,"correct":22},"变更方案论证",{"key":28,"text":115,"correct":26},"组建CCB",{"key":31,"text":117,"correct":26},"判断发生变更的项目是否己纳入正常轨道",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},384886,"某项目经理在项目执行过程中得知公司新的规章将导致该项目绩效的测试发生变化，为了保证该变更纳入到项目计划之中，项目经理应当（）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"要求召开变更控制委员会议",{"key":24,"text":125,"correct":26},"变更工作分解结构、进度计划，以在项目管理计划中反映新的要求",{"key":28,"text":127,"correct":22},"准备变更申请",{"key":31,"text":129,"correct":26},"反对公司新计划",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},384887,"某项目的项目经理在进行项目范围变更时，在对项目的技术和管理文件做了必要的修改后，他下一步应该（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"及时通知项目干系人",{"key":24,"text":137,"correct":26},"修改公司的知识管理系统",{"key":28,"text":139,"correct":26},"获取客户的正式认可",{"key":31,"text":141,"correct":26},"获得政府认可",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},384888,"某系统集成公司据经验决定建立一套变更控制系统，为保证该系统行之有效，该系统中必须包括的内容是()",[146,148,150,152],{"key":20,"text":147,"correct":26},"对每个项目的各条功能和物理特征作出的具体描述",{"key":24,"text":149,"correct":26},"项目预期的、具体的变更要求，以及响应计划",{"key":28,"text":151,"correct":22},"定义项目文件如何变更的程序和规则",{"key":31,"text":153,"correct":26},"预测项目变更的绩效报告",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},384889,"在进行项目文档及配置管理时，引入“基线”这一概念的目的是 （ ） 。",[158,160,162,164],{"key":20,"text":159,"correct":26},"保证成果的完整与正确",{"key":24,"text":161,"correct":26},"合理分配权限",{"key":28,"text":163,"correct":26},"保证成果相互依赖性",{"key":31,"text":165,"correct":22},"合理控制变更",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},384890,"某项目开始一段时间后，客户提出一些产品修改需求，项目组小A没有通知项目经理变执行了变更。测试阶段发现，测试结果与设计不同。这种情况主要是由于 （） 。",[170,172,174,176],{"key":20,"text":171,"correct":26},"测试计划制定不完善",{"key":24,"text":173,"correct":22},"范围变更控制没有做好",{"key":28,"text":175,"correct":26},"质量管理计划制定不完善",{"key":31,"text":177,"correct":26},"沟通计划不完善",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},384891,"甲公司承担了某市政府门户网站建设项目，与 该市信息中心签订了合同。在设计页面的过程中，经过多轮讨论和修改，页面在两周前终于得到了信息中心的认可，项目进入开发实施阶段。然而，信息中心本周提 出，分管市领导看到页面设计后不是很满意，要求重新设计页面。但是，如果重新设计页面，可能会影响项目工期，无法保证网站按时上线。在这种情况下，项目经 理最恰当的做法是（）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"坚持原设计方案，因为原页面已得到客户认可",{"key":24,"text":185,"correct":26},"让设计师加班加点，抓紧时间修改页面",{"key":28,"text":187,"correct":26},"向领导争取网站延期上线，重新设计页面",{"key":31,"text":189,"correct":22},"评估潜在的工期风险，再决定采取何种应对措施",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},384892,"变更常常是项目干系人由于项目环境或者是其他各种原因要求对项目的范围基准等进行修改。如某项目由于行业标准变化导致变更，这属于（）",[194,196,198,200],{"key":20,"text":195,"correct":26},"项目实施组织本身发生变化",{"key":24,"text":197,"correct":26},"客户对项目、项目产品或服务的要求发生变化",{"key":28,"text":199,"correct":22},"项目外部环境发生变化",{"key":31,"text":201,"correct":26},"项目范围的计划编制不周密详细",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},384893,"项目规模小并且与其它项目的关联度小时，变更的提出与处理过程可在操作上力求简便和高效。关于小项目变更，不正确的说法是（）",[206,208,210,212],{"key":20,"text":207,"correct":26},"对变更产生的因素施加影响以防止不必要的变更并减少无谓的评估",{"key":24,"text":209,"correct":26},"应明确变更的组织与分工合作",{"key":28,"text":211,"correct":26},"变更流程也要规范化",{"key":31,"text":213,"correct":22},"对变更的申请和确认，既可以是书面的也可以是口头的，以简化程序",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},384894,"某公司最近承接了一个大型信息系统项目，项目整体压力较大，对这个项目中的变更，可以使用（）等方式提高效率。①分优先级处理②规范处理③整批处理④分批处理",[218,220,222,224],{"key":20,"text":219,"correct":26},"①②③",{"key":24,"text":221,"correct":22},"①②④",{"key":28,"text":223,"correct":26},"②③④",{"key":31,"text":225,"correct":26},"①③④",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},384895,"小张是软件研发和项目经理，负责的某项目已进入实验阶段，此时用户提出要增加一项新的功能，小张应该（ ）",[230,232,234,236],{"key":20,"text":231,"correct":26},"拒绝该变更",{"key":24,"text":233,"correct":22},"通过变更控制流程进行处理",{"key":28,"text":235,"correct":26},"立即实现该变更",{"key":31,"text":237,"correct":26},"要求客户应先去与公司领导协商",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},384896,"变更控制委员会负责项目变更请求的审查与处理工作，其批准的所有变更都必须反映到 （） 中。",[242,244,246,248],{"key":20,"text":243,"correct":26},"变更基准",{"key":24,"text":245,"correct":26},"变更计划",{"key":28,"text":247,"correct":22},"项目管理计划",{"key":31,"text":249,"correct":26},"质量控制计划",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},384897,"在项目变更时，如果有人要求项目进度提前，那么根据变更控制流程，首先应该()。",[254,256,258,260],{"key":20,"text":255,"correct":22},"提交书面的进度变更申请单",{"key":24,"text":257,"correct":26},"变更的影响分析",{"key":28,"text":259,"correct":26},"对该变更接受或拒绝",{"key":31,"text":261,"correct":26},"执行变更",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},384898,"下图是变更控制管理流程图,该流程图缺少( )",[266,268,270,272],{"key":20,"text":267,"correct":26},"评估影响记录",{"key":24,"text":269,"correct":26},"配置审计",{"key":28,"text":271,"correct":26},"变更定义",{"key":31,"text":273,"correct":22},"记录变更实施情况",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},384899,"合同变更控制系统规定合同修改的过程，包括（）① 文书工作 ② 跟踪系统 ③ 争议解决程序 ④ 合同索赔处理",[278,279,280,281],{"key":20,"text":219,"correct":22},{"key":24,"text":223,"correct":26},{"key":28,"text":221,"correct":26},{"key":31,"text":225,"correct":26},{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},384900,"以下关于合同变更的叙述中， （ ） 是不正确的。",[286,288,290,292],{"key":20,"text":287,"correct":26},"合同变更一般处理程序如下：变更的提出、变更请求的审查、变更的批准、变更的实施",{"key":24,"text":289,"correct":22},"变更申请可以以口头形式提出，变更评估必须采取书面方式",{"key":28,"text":291,"correct":26},"对于任何变更的评估都应该有变更影响分析",{"key":31,"text":293,"correct":26},"合同变更的处理由合同变更控制系统来完成",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":28,"analysis":33},384901,"某公司正在为某省公安部门开发一套边防出入境管理系统，该系统包括15个业务模块，计划开发周期为9个月，即在今年10月底之前交付。开发团队一共有15名工程师。今年7月份，中央政府决定开放某省个人到香港旅游，并在8月15日开始实施。为此客户要求公司在新系统中实现新的业务功能，该功能实现预计有5个模块，并要求在8月15日前交付实施。但公司无法立刻为项目组提供新的人力资源。面对客户的变更需求，以下 处理方法最合适。",[298,300,302,304],{"key":20,"text":299,"correct":26},"拒绝客户的变更需求，要求签订一个新合同，通过一个新项目来完成",{"key":24,"text":301,"correct":26},"接受客户的变更需求，并争取如期交付，建立公司的声誉",{"key":28,"text":303,"correct":22},"采用多次发布的策略，将20个模块重新排定优先次序，并在8月15日之前发布一个包含到香港旅游业务功能的版本，其余延后交付",{"key":31,"text":305,"correct":26},"在客户同意增加项目预算的条件下，接受客户的变更需求，并如期交付项目成果。",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":28,"analysis":33},384902,"以下关于变更的流程和规则的做法中，（）是错误的。",[310,312,314,316],{"key":20,"text":311,"correct":26},"以口头方式提出某项变更，在评估前针对该变更提交了书面报告",{"key":24,"text":313,"correct":26},"项目组成员变更以邮件发出，在评审前填写了变更申请",{"key":28,"text":315,"correct":22},"为了规范，监理不对变更进行分级，所有变更流程都不能简化",{"key":31,"text":317,"correct":26},"按照影响范围、紧急程度把变更分为3个优先级别",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":28,"analysis":33},384903,"依据项目变更管理流程，项目中的正式变更手续应该由 （ ） 来进行审批。",[322,324,326,328],{"key":20,"text":323,"correct":26},"项目经理",{"key":24,"text":325,"correct":26},"公司高层领导",{"key":28,"text":327,"correct":22},"变更控制委员会",{"key":31,"text":329,"correct":26},"公司高层领导与客户方高层领导共同",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},384904,"某软件开发项目进度紧迫，在设计方案还没完成前，项目经理改变计划，停止设计工作，要求项目组成员立即转入代码编写。关于项目经理的行为，下面说法正确的是()",[334,336,338,340],{"key":20,"text":335,"correct":22},"项目经理的行为不妥，等CCB批准后方可改变计划",{"key":24,"text":337,"correct":26},"项目经理有权改变流程，不需审批",{"key":28,"text":339,"correct":26},"这种行为属于赶工，项目经理可直接安排实施",{"key":31,"text":341,"correct":26},"这种行为属于快速跟进，项目经理有权决定",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":28,"analysis":33},384905,"系统集成公司A为保险公司B开发非核心业务系统，项目开发过程中客户常常提出一些新的要求，如界面上的按钮位置、业务流程上的更改。以下项目经理的做法中，（）是正确的。",[346,348,350,352],{"key":20,"text":347,"correct":26},"对于要求更改操作界面的颜色、按钮位置这样小的变更要求，开发人员可以请示项目经理后直接更改，不用保存变更记录",{"key":24,"text":349,"correct":26},"对于修改业务流程这样的要求，项目经理可以单独批准",{"key":28,"text":351,"correct":22},"项目经理应考虑客户需求方面的变更对进度、成本等方面是否有较大的影响，如果有较大影响并决定变更，需要修订相应的项目管理计划及其子计划",{"key":31,"text":353,"correct":26},"项目经理应尽量找到有说服力的理由来劝说客户不要进行变更",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},384906,"质量保证部门最近对某项目进行了质量审计，给出了一些建议和规定，一项建议看来关键应该采纳执行。因为它将影响到这个项目成功地交给客户。如果建议不被执行，产品就不能满足需要。该项目的项目经理下一步应该 （ ） 。",[358,360,362,364],{"key":20,"text":359,"correct":26},"开一个项目团队会议，以确定谁对这个问题负责",{"key":24,"text":361,"correct":26},"重新分配任务并且发现这个错误负有责任的队员",{"key":28,"text":363,"correct":26},"立即进行产品的返工",{"key":31,"text":365,"correct":22},"发布一项变更申请以采取必要的纠正措施",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":31,"analysis":33},384907,"以下各项中，（）属于整体变更控制的输入。",[370,372,374,376],{"key":20,"text":371,"correct":26},"已批准的纠正措施",{"key":24,"text":373,"correct":26},"已批准的预防措施",{"key":28,"text":375,"correct":26},"已批准的缺陷修复",{"key":31,"text":377,"correct":22},"绩效报告",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},384908,"项目发生变更在所难免，但项目经理应让项目干系人（特别是业主）认识到()。",[382,383,384,386],{"key":20,"text":39,"correct":26},{"key":24,"text":45,"correct":22},{"key":28,"text":385,"correct":26},"在项目策划阶段，变更带来的附加值较低",{"key":31,"text":41,"correct":26},{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":20,"analysis":33},384909,"一项新的国家标准出台，某项目经理意识到新标准中的某些规定将导致其目前负责的一个项目必须重新设定一项技术指标，该项目经理首先应该 （ ） 。",[391,393,395,397],{"key":20,"text":392,"correct":22},"撰写一份书面的变更请求",{"key":24,"text":394,"correct":26},"召开一次变更控制委员会会议，讨论所面临的问题",{"key":28,"text":396,"correct":26},"通知受到影响的项目干系人将采取新的项目计划",{"key":31,"text":398,"correct":26},"修改项目计划和WBS，以保证该项目产品符合新标准",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},384910,"项目将要完成时，客户要求对工作范围进行较大的变更，项目经理应()",[403,404,406,408],{"key":20,"text":261,"correct":26},{"key":24,"text":405,"correct":22},"将变更能造成的影响通知客户",{"key":28,"text":407,"correct":26},"拒绝变更",{"key":31,"text":409,"correct":26},"将变更作为新项目来执行",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":31,"analysis":33},384911,"在项目变更管理中，变更影响分析一般由( )负责。",[414,416,418,419],{"key":20,"text":415,"correct":26},"变更申请提出者",{"key":24,"text":417,"correct":26},"变更管理员",{"key":28,"text":327,"correct":26},{"key":31,"text":323,"correct":22},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":31,"analysis":33},384912,"在项目管理的下列四类风险类型中，对用户来说如果没有管理好，()将会造成最长久的影响。",[424,426,428,430],{"key":20,"text":425,"correct":26},"范围风险",{"key":24,"text":427,"correct":26},"进度计划风险",{"key":28,"text":429,"correct":26},"费用风险",{"key":31,"text":431,"correct":22},"质量风险",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},384913,"（ ）不属于定量风险分析的技术方法",[436,438,440,442],{"key":20,"text":437,"correct":26},"决策树分析",{"key":24,"text":439,"correct":22},"概率和影响矩阵",{"key":28,"text":441,"correct":26},"计划评审技术",{"key":31,"text":443,"correct":26},"蒙特卡洛分析",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},384914,"以下各项中，不属于定量风险分析工作成果的是（）",[448,450,452,454],{"key":20,"text":449,"correct":22},"近期需优先应对的风险清单",{"key":24,"text":451,"correct":26},"项目的概率分析",{"key":28,"text":453,"correct":26},"经过量化的风险优先清单",{"key":31,"text":455,"correct":26},"实现成本和时间目标的概率",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},384915,"德尔菲法区别于其他专家预测法的明显特点是()",[460,462,464,466],{"key":20,"text":461,"correct":26},"引入了权重参数",{"key":24,"text":463,"correct":22},"多次有控制的反馈",{"key":28,"text":465,"correct":26},"专家之间互相取长补短",{"key":31,"text":467,"correct":26},"至少经过4轮预测",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},384916,"识别风险就是确定风险的来源、确定风险产生的条件和描述风险特征等方面工作的总称。（）是指造成损失的直接或外在的原因，是损失的媒介物。",[472,474,476,478],{"key":20,"text":473,"correct":26},"风险事件",{"key":24,"text":475,"correct":22},"风险事故",{"key":28,"text":477,"correct":26},"风险因素",{"key":31,"text":479,"correct":26},"风险危害",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":20,"analysis":33},384917,"决策树分析是风险分析过程中的一项常用技术。某企业在项目风险分析过程中，采用了决策树分析方法，并计算出了EMV（期望货币值）。以下说法中，正确的是（）",[484,486,488,490],{"key":20,"text":485,"correct":22},"以上进行的是定量风险分析，根据分析结果应选择修改现有技术方案的路线",{"key":24,"text":487,"correct":26},"以上进行的是定量风险分析，根据分析结果应选择设计新技术方案的路线",{"key":28,"text":489,"correct":26},"以上进行的是定性风险分析，根据分析结果应选择修改现有技术方案的路线",{"key":31,"text":491,"correct":26},"以上进行的是定性风险分析，根据分析结果应选择设计新技术方案的路线",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":28,"analysis":33},384918,"有关风险识别，以下说法不正确的是（）",[496,498,500,502],{"key":20,"text":497,"correct":26},"项目组全体成员参与风险识别",{"key":24,"text":499,"correct":26},"识别范围覆盖了项目的整个生命周期",{"key":28,"text":501,"correct":22},"风险管理计划是风险识别的输出",{"key":31,"text":503,"correct":26},"识别过程中综合运用了多种风险识别的技术和工具",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":24,"analysis":33},384919,"风险管理是项目管理中的重要内容，其中风险概率分析是指（）。",[508,510,512,514],{"key":20,"text":509,"correct":26},"分析风险对项目的潜在影响",{"key":24,"text":511,"correct":22},"调查每项具体风险发生的可能性",{"key":28,"text":513,"correct":26},"分析风险的可能消极影响",{"key":31,"text":515,"correct":26},"分析风险的可能积极影响",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},384920,"（）指通过考虑风险发生的概率及风险发生后对项目目标及其他因素的影响，对已识别风险的优先级进行评估",[520,522,524,526],{"key":20,"text":521,"correct":26},"风险管理",{"key":24,"text":523,"correct":22},"定性风险分析",{"key":28,"text":525,"correct":26},"风险控制",{"key":31,"text":527,"correct":26},"风险应对计划编制",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":28,"analysis":33},384921,"某工厂生产雷达，成品无效的历时数据是4%。在工厂测试每个雷达的成本为10000元；工厂测试后重新组装每个测试合格雷达的成本是2000元；工厂测试后修理并重新组装每个不合格雷达的成本是23000元。而修理安装每个现场的不合格雷达的成本是350000元。利用决策树分析。若决定对500个雷达进行100%测试，预期支出需要（）万元。",[532,534,536,538],{"key":20,"text":533,"correct":26},"550",{"key":24,"text":535,"correct":26},"596",{"key":28,"text":537,"correct":22},"642",{"key":31,"text":539,"correct":26},"700",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},384922,"风险紧迫性评估多用于（）中。",[544,546,547,549],{"key":20,"text":545,"correct":26},"风险识别",{"key":24,"text":523,"correct":22},{"key":28,"text":548,"correct":26},"定量风险分析",{"key":31,"text":550,"correct":26},"风险应对",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":28,"analysis":33},384923,"德尔菲技术是一种非常有用的风险识别方法，其主要优势在于()",[555,557,559,561],{"key":20,"text":556,"correct":26},"可以明确表示出特定变量出现的概率",{"key":24,"text":558,"correct":26},"能够为决策者提供一系列图表式的决策选择",{"key":28,"text":560,"correct":22},"减少分析过程中的偏见，防止任何个人结果施加不当的过大影响",{"key":31,"text":562,"correct":26},"有助于综合考虑决策者对风险的态度",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":28,"analysis":33},384924,"某集成企业在进行风险定性分析时，考虑了风险的几种因素：①威胁，指风险对项目造成的危害程度；②机会，指对项目带来的收益程度；③紧迫性，对风险亟待处置的程度；④风险发生的概率。关于该公司的定性风险分析，下列说法中，()是不正确的。",[567,569,571,573],{"key":20,"text":568,"correct":26},"①×③×④的值越大，则表明风险高，应考虑优先处理",{"key":24,"text":570,"correct":26},"②×③×④的值越大，则表明机会大，应考虑优先处理",{"key":28,"text":572,"correct":22},"①×②×④的值越大，则表明风险高、机会大，应考虑优先处理",{"key":31,"text":574,"correct":26},"②×④的值越大，则表明机会大，应考虑优先处理",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},384925,"软件风险是指在软件开发过程中面临的一些不确定性和可能造成的损失。软件风险大致可以分为三类：项目风险、技术风险和商业风险。下列叙述中，（）属于商业风险。",[579,581,583,585],{"key":20,"text":580,"correct":26},"软件的开发时间可能会超出预期时间",{"key":24,"text":582,"correct":26},"采用的开发技术过于先进，技术本身尚不稳定",{"key":28,"text":584,"correct":26},"软件开发过程中需求一直未能稳定下来",{"key":31,"text":586,"correct":22},"软件开发过程没有得到预算或人员上的保证",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":31,"analysis":33},384926,"甲公司承担了某市政府门户网站建设项目，与该市信息中心签订了合同。在设计页面的过程中，经过多轮讨论和修改，页面在两周前终于得到了信息中心的认可，项目进入开发实施阶段。然而，信息中心本周提出，分管市领导看到页面设计后不是很满意，要求重新设计页面。但是，如果重新设计页面，可能会影响项目工期，无法保证网站按时上线。在这种情况下，项目经理最恰当的做法是 （ ）",[591,592,593,594],{"key":20,"text":183,"correct":26},{"key":24,"text":185,"correct":26},{"key":28,"text":187,"correct":26},{"key":31,"text":189,"correct":22},{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":31,"analysis":33},384927,"在项目执行阶段，一名团队成员识别了一项新风险，此时，应该 （ ） 。",[599,601,603,605],{"key":20,"text":600,"correct":26},"将之涵盖在风险触发因素中",{"key":24,"text":602,"correct":26},"对假设条件进行测试",{"key":28,"text":604,"correct":26},"将之加入风险管理计划内",{"key":31,"text":606,"correct":22},"对风险进行定性分析",[608,612,615,618,621,624],{"id":609,"name":610,"category":7,"favorite":611},136,"法律职业试卷二(客观题 )",2,{"id":613,"name":614,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":616,"name":617,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":619,"name":620,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":622,"name":623,"category":7,"favorite":8},28,"安全工程师",{"id":625,"name":626,"category":7,"favorite":8},112,"安全生产法律知识"]