[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,2,50,1397,[13,34,46,58,70,82,94,105,117,129,141,153,165,177,189,201,212,224,236,248,260,272,284,296,308,320,332,344,356,368,380,392,404,416,428,440,452,464,474,484,496,508,518,530,542,554,566,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},383972,1,"单选题","关于项目生命周期的特征说法错误的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","可以按照管理活动出现的先后，把项目的生命周期划分为启动、计划、执行和收尾等4个典型的阶段。",false,{"key":24,"text":25,"correct":26},"B","项目干系人随着时间的继续对项目的影响. 项目持续的时间越长项目干系人的影响越大。",true,{"key":28,"text":29,"correct":22},"C","没有唯一最好的项目生命周期定义方法。",{"key":31,"text":32,"correct":22},"D","在项目的初始阶段不确定性水平最高，因此达不到项目目标的风险是最高的。","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},383973,"关于项目经理和PMO的区别说法错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"项目经理和PMO追求相同的目标。",{"key":24,"text":41,"correct":22},"项目经理关注于特定的项目目标，而PMO管理重要的大型项目范围的变化，以更好地达到经营目标。",{"key":28,"text":43,"correct":22},"项目经理控制赋予项目的资源以最好地实现项目目标，而PMO对所有项目之间的共享组织资源进行优化使用。",{"key":31,"text":45,"correct":22},"项目经理管理中间产品的范围、进度、费用和质量，而PMO管理整体的风险、整体的机会和所有的项目依赖关系。",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},383974,"下面不属于PMO类别的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"支持型",{"key":24,"text":53,"correct":22},"控制型",{"key":28,"text":55,"correct":22},"指令型",{"key":31,"text":57,"correct":26},"限制型",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},383975,"以下不属于信息系统集成项目的显著特点的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"系统集成是简单选择最好产品的行为。",{"key":24,"text":65,"correct":22},"信息系统集成项目要以满足客户和用户的需求为根本出发点。",{"key":28,"text":67,"correct":22},"客户和用户的需求常常不够明确、复杂多变，由此应加强需求变更管理以控制风险。",{"key":31,"text":69,"correct":22},"项目团队的成员年轻，流动率高。",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},383976,"项目通常是作为实现组织战略计划的手段而实现的，下面（ ）不是项目特点",[74,76,78,80],{"key":20,"text":75,"correct":22},"渐进性",{"key":24,"text":77,"correct":26},"服务性",{"key":28,"text":79,"correct":22},"临时性",{"key":31,"text":81,"correct":22},"独特性",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},383977,"以下不属于项目干系人的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"客户和用户",{"key":24,"text":89,"correct":22},"执行组织",{"key":28,"text":91,"correct":26},"社会人",{"key":31,"text":93,"correct":22},"影响者",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},383978,"项目的特征不包括（ ）",[98,100,102,104],{"key":20,"text":99,"correct":22},"一次性",{"key":24,"text":101,"correct":22},"层次性",{"key":28,"text":103,"correct":26},"唯一性",{"key":31,"text":81,"correct":22},{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":20,"analysis":33},383979,"（ ）不属于项目型组织的缺点。",[109,111,113,115],{"key":20,"text":110,"correct":26},"目标单一",{"key":24,"text":112,"correct":22},"员工缺乏事业上的连续性和保障",{"key":28,"text":114,"correct":22},"不利于沟通、技术知识共享",{"key":31,"text":116,"correct":22},"难以监测和控制",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":31,"analysis":33},383980,"以下关于项目管理的说法错误的是（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"项目管理是指在项目活动中综合运用知识、技能、工具和技术在一定时间、成本、质量等要求下来实现项目的成果性目标的一系列行为。",{"key":24,"text":124,"correct":22},"为实现管理目标，企业在项目管理应当采用成本与效益匹配、技术先进、充分交流与合作等原则。",{"key":28,"text":126,"correct":22},"最新的观点认为项目成功收到范围、时间、成本和质量等4个方面的约束。",{"key":31,"text":128,"correct":26},"项目管理通过执行一系列相关的过程来完成，这些过程分布在核心知识域和保障域。",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},383981,"适用于项目事先不能完整定义产品所有需求、计划多期开发的软件生命周期模型是（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"快速原型开发",{"key":24,"text":136,"correct":22},"快速创新开发",{"key":28,"text":138,"correct":22},"瀑布模型",{"key":31,"text":140,"correct":26},"迭代模型",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":20,"analysis":33},383982,"在信息系统集成项目开发的开始阶段，如果项目存在很多不确定性因素且项目的参与人员还不能完全理解项目开发的范围和需求，那么采用（ ）作为此项目的开发模型更符合项目的实际情况。",[145,147,149,151],{"key":20,"text":146,"correct":26},"增量迭代模型或螺旋模型",{"key":24,"text":148,"correct":22},"面向过程的瀑布模型",{"key":28,"text":150,"correct":22},"面向对象的模型或快速模型",{"key":31,"text":152,"correct":22},"部分并行的瀑布模型",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},383983,"沟通、领导和磋商是属于（ ）的技能。",[157,159,161,163],{"key":20,"text":158,"correct":22},"项目管理",{"key":24,"text":160,"correct":26},"一般管理",{"key":28,"text":162,"correct":22},"团队管理",{"key":31,"text":164,"correct":22},"执行管理",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},383984,"一般来说，要把一个项目管好，至少需要4个过程。以下不属于这4个过程的是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"技术类过程（或称工程类过程）",{"key":24,"text":172,"correct":22},"管理类过程",{"key":28,"text":174,"correct":22},"支持类过程",{"key":31,"text":176,"correct":26},"部署类过程",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},383985,"在管理信息系统项目的实施过程中，不仅需要管理过程，也需要技术过程、支持过程、过程改进和商务过程等，它们分别来自项目管理知识、项目环境知识、通用的管理知识和技能、软技能或人际关系技能以及（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"软件开发方法体系的知识、标准和规定",{"key":24,"text":184,"correct":22},"软件工具和软件工程环境的知识、标准和规定",{"key":28,"text":186,"correct":22},"用户或客户业务领域的知识、标准和规定",{"key":31,"text":188,"correct":26},"信息技术及客户业务领域的知识、标准和规定",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},383986,"项目具有（ ）的基本特征，意味着早期的共识会随着对项目的逐步细化，在实施过程不可避免地发生变化。",[193,195,197,199],{"key":20,"text":194,"correct":22},"容易变更",{"key":24,"text":196,"correct":26},"逐渐完善",{"key":28,"text":198,"correct":22},"规避风险",{"key":31,"text":200,"correct":22},"需求变化",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},383987,"结构化分析与设计是信息系统开发时常用的方法。按其生命周期特征，它应属于（ ）",[205,207,209,211],{"key":20,"text":206,"correct":22},"V模型",{"key":24,"text":208,"correct":22},"原型化模型",{"key":28,"text":210,"correct":22},"螺旋模型",{"key":31,"text":138,"correct":26},{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":31,"analysis":33},383988,"以下对项目管理和项目监理的理解中，正确的是（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"项目监理属于项目管理的监控过程组",{"key":24,"text":219,"correct":22},"项目监理属于项目管理的执行过程组",{"key":28,"text":221,"correct":22},"项目管理与项目监理是独立两个过程，没有任何关系",{"key":31,"text":223,"correct":26},"项目建设方和项目承建方都需要开展项目管理工作，而项目监理要由第三方负责",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},383989,"组织过程资产在项目管理中扮演很重要的角色，（ ）不属于组织过程资产。",[228,230,232,234],{"key":20,"text":229,"correct":26},"基础设施",{"key":24,"text":231,"correct":22},"组织的经验学习系统",{"key":28,"text":233,"correct":22},"产品组建标准",{"key":31,"text":235,"correct":22},"招聘、培养、使用和解聘技术人员的指导方针",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":31,"analysis":33},383990,"以下关于项目目标的说法错误的是（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"项目目标包括成果性目标和约束性目标。",{"key":24,"text":243,"correct":22},"项目目标有不同的优先级。",{"key":28,"text":245,"correct":22},"项目目标具有层次性。",{"key":31,"text":247,"correct":26},"项目目标冲突仅限于质量、成本和进度三个基本目标。",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},383991,"投资大、建设周期长、专业复杂、技术人员来自多个部门的大型项目，最好采用（ ）组织形式或近似的组织形式。",[252,254,256,258],{"key":20,"text":253,"correct":22},"职能型",{"key":24,"text":255,"correct":26},"项目型",{"key":28,"text":257,"correct":22},"弱矩阵型",{"key":31,"text":259,"correct":22},"紧密型",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},383992,"在软件开发的V模型中，应该在（ ）阶段制定单元测试计划。",[264,266,268,270],{"key":20,"text":265,"correct":22},"需求分析",{"key":24,"text":267,"correct":22},"概要设计",{"key":28,"text":269,"correct":22},"详细设计",{"key":31,"text":271,"correct":26},"代码编写",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},383993,"在（ ）中，项目经理的权利最小",[276,278,280,282],{"key":20,"text":277,"correct":22},"强矩阵组织",{"key":24,"text":279,"correct":26},"弱矩阵组织",{"key":28,"text":281,"correct":22},"平衡矩阵组织",{"key":31,"text":283,"correct":22},"项目型组织",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},383995,"在编写项目可行性研究报告时，风险因素及对策主要是对项目的市场风险、（ ）法律风险，经济及社会风险等因素进行评价，制定规避风险的对策，为项目的全过程的管理提供依据。",[288,290,292,294],{"key":20,"text":289,"correct":22},"技术风险，财务风险，环境风险",{"key":24,"text":291,"correct":26},"技术风险，财务风险，组织风险",{"key":28,"text":293,"correct":22},"技术风险，组织风险，环境风险",{"key":31,"text":295,"correct":22},"财务风险，组织风险，环境风险",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},383996,"某企业针对“新一代网络操作系统”开发项目进行可行性论证。在论证的最初阶段，一般情况下不会涉及到（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"调研了解新一代网络操作系统的市场需求",{"key":24,"text":303,"correct":22},"分析论证是否具备相应的开发技术",{"key":28,"text":305,"correct":26},"详细估计系统开发周期",{"key":31,"text":307,"correct":22},"结合企业财务经济情况进行论证分析",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},383997,"以下不属于项目可行性研究内容的是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":22},"投资必要性",{"key":24,"text":315,"correct":22},"财务可行性",{"key":28,"text":317,"correct":22},"经济可行性",{"key":31,"text":319,"correct":26},"自然因素及对策",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":28,"analysis":33},383998,"下列说法不正确的是（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":22},"招标投标法规定招标方式分为公开招标和邀请招标两类",{"key":24,"text":327,"correct":22},"只有不属于法规规定必须招标的项目才可以采用直接委托方式",{"key":28,"text":329,"correct":26},"建设行政主管部门派人参加开标、评标、定标的活动，监督招标按法定程序选择中标人，所派人员可作为评标委员会的成员，但不得以任何形式影响或干涉招标人依法选择中标人的活动",{"key":31,"text":331,"correct":22},"比较而言公开招标的评标工作量较大，所需招标时间长，费用高",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":28,"analysis":33},383999,"机会研究、初步可行性研究、详细可行性研究、评估与决策是项目前期的四个阶段，在实际工作中，依据项目的规模和繁简程度，其中可以省略的阶段是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"详细可行性研究、评估与决策",{"key":24,"text":339,"correct":22},"初步可行性研究、详细可行性研究",{"key":28,"text":341,"correct":26},"机会研究、初步可行性研究",{"key":31,"text":343,"correct":22},"机会研究、评估与决策",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},384000,"项目可行性研究阶段包括（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":22},"初步可行性研究；详细可行性研究；项目可行性研究报告的编写、提交和获得批准。",{"key":24,"text":351,"correct":26},"机会可行性研究；初步可行性研究；详细可行性研究；项目可行性研究报告的编写、提交和获得批准；项目评估。",{"key":28,"text":353,"correct":22},"机会可行性研究；初步可行性研究；详细可行性研究；项目评估。",{"key":31,"text":355,"correct":22},"机会可行性研究；初步可行性研究；详细可行性研究；项目可行性研究报告的编写、提交和获得批准。",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":33},384001,"有关可行性研究的叙述中错误的是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"信息系统项目开发的可行性研究要从可能性、效益性和必要性入手",{"key":24,"text":363,"correct":22},"可行性研究要遵守科学性和客观性原则",{"key":28,"text":365,"correct":26},"信息系统项目的可行性研究，应对项目采用的技术、所处的环境进行全面的评价",{"key":31,"text":367,"correct":22},"项目可行性研究可采用投资估算法、增量净效益法等方法",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},384002,"关于项目投标说法错误的是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"与招标人存在利害关系可能影响招标公正性的法人、其他组织单位或者个人，不得参加投标。",{"key":24,"text":375,"correct":22},"招标人应当在资格预审公告、招标公告或者投标邀请书中载明是否接受联合体投标。",{"key":28,"text":377,"correct":22},"联合体各方在同一招标项目中以自己名义单独投标或者参加其他联合体投标的，相关投标均无效。",{"key":31,"text":379,"correct":26},"属于同一集团、协会、商会等组织成员的投标人按照该组织要求协同投标是允许的。",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},384003,"以下关于开标与评标的叙述中，不正确的是（ ）",[384,386,388,390],{"key":20,"text":385,"correct":26},"评标委员会的数量为单数，其中技术、经济等方面专家人数不得少于成员总数的1\u002F2",{"key":24,"text":387,"correct":22},"招标人自收到评价报告之日起3日内公示中标候选人，公示期不得少于3日",{"key":28,"text":389,"correct":22},"依法必须进行招标的项目，招标人应该确定排名第一的中标候选人为中标人",{"key":31,"text":391,"correct":22},"评标报告应当有评标委员会全体成员签字",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":28,"analysis":33},384004,"下列不属于合同条款的是（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":22},"标的内容",{"key":24,"text":399,"correct":22},"当事人的名称和地址",{"key":28,"text":401,"correct":26},"价款和报价",{"key":31,"text":403,"correct":22},"违约责任和解决争议的方法",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":31,"analysis":33},384005,"确定信息系统集成项目的需求是项目成功实施的保证，项目需求确定属于（ ）的内容。",[408,410,412,414],{"key":20,"text":409,"correct":22},"初步可行性研究",{"key":24,"text":411,"correct":22},"范围说明书",{"key":28,"text":413,"correct":22},"项目范围基准",{"key":31,"text":415,"correct":26},"详细可行性研究",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},384006,"在评标过程中，（ ）是不符合招标投标法要求的。",[420,422,424,426],{"key":20,"text":421,"correct":26},"评标委员会委员由5人组成，其中招标人代表2人，经济、技术专家3人",{"key":24,"text":423,"correct":22},"评标委员会认为A投标单位的投标文件中针对某项技术的阐述不够清晰，要求A单位予以澄清",{"key":28,"text":425,"correct":22},"某单位的投标文件中某分项工程的报价存在个别漏项，评标委员会认为个别漏项属于细微偏差，投标标书有效",{"key":31,"text":427,"correct":22},"某单位虽然按招标文件要求编制了投标文件，但是个别页面没有编制页码，评标委员会认为投标标书有效。",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},384007,"以下不属于系统集成商进行项目内部立项时的内容的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"项目资源估算",{"key":24,"text":435,"correct":26},"项目资源融合",{"key":28,"text":437,"correct":22},"准备项目任命书",{"key":31,"text":439,"correct":22},"任命项目经理",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},384009,"关于项目审批说法错误的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"项目审批部门对系统集成项目的项目建议书、可行研究报告、初步设计方案和投资概算的批复文件是后续项目建设的主要依据。",{"key":24,"text":447,"correct":22},"批复中核定的建设内容、规模、标准、总投资概算和其他控制指标原则上应严格遵守。",{"key":28,"text":449,"correct":26},"项目初步设计方案和投资概算报告的编制内容与项目可行性研究报告批复内容有重大变更或变更投资超出已批复总投资额的20%的，应重新报批可行性研究报告。",{"key":31,"text":451,"correct":22},"项目可行性研究报告的编制内容与项目建议书批复内容有重大变更的，应重新报批项目建议书。",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},384010,"项目建议书是项目建设单位进行项目申请时提交的文件，其中“项目建设目标与主要内容建设”出现在项目建议书的（ ）部分。",[456,458,460,462],{"key":20,"text":457,"correct":22},"项目建设单位概况",{"key":24,"text":459,"correct":22},"项目建设必要性",{"key":28,"text":461,"correct":26},"总体建设方案",{"key":31,"text":463,"correct":22},"业务分析",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":31,"analysis":33},384011,"为项目全过程的风险管理提供依据的项目可行性研究内容的是（ ）。",[468,469,470,472],{"key":20,"text":315,"correct":22},{"key":24,"text":317,"correct":22},{"key":28,"text":471,"correct":22},"社会可行性",{"key":31,"text":473,"correct":26},"风险因素及对策",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},384012,"评估开发所需的成本和资源属于可行性研究中（ ）研究的主要内容。",[478,479,480,482],{"key":20,"text":471,"correct":22},{"key":24,"text":317,"correct":26},{"key":28,"text":481,"correct":22},"技术可行性",{"key":31,"text":483,"correct":22},"实施可行性",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":28,"analysis":33},384013,"项目立项包括：项目建议、项目可行性分析、项目审批、项目招投标、项目合同谈判5个阶段、（ ）属于项目可行性分析阶段的内容",[488,490,492,494],{"key":20,"text":489,"correct":22},"编制立项申请",{"key":24,"text":491,"correct":22},"编制项目建议书",{"key":28,"text":493,"correct":26},"项目评估",{"key":31,"text":495,"correct":22},"重新报批可研性",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},384014,"关于开标与评标的说法错误的是（ ）。",[500,502,504,506],{"key":20,"text":501,"correct":22},"投标人少于3个的，不得开标；招标人应当重新招标。",{"key":24,"text":503,"correct":22},"唱标主要公布投标报价，其他内容看招标文件要求。",{"key":28,"text":505,"correct":22},"中标候选人应当不超过3个，并标明排序。",{"key":31,"text":507,"correct":26},"评标委员会中技术、经济等方面专家人数不得少于成员总数的1\u002F3。",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":28,"analysis":33},384015,"制定合理的实施进度计划、设计合理的组织结构、选择经验丰富的管理人员、建立良好的协作关系、制定合适的培训计划等内容属于信息系统集成项目的可行性研究中（ ）研究的内容。",[512,514,515,517],{"key":20,"text":513,"correct":22},"经济及风险可行性",{"key":24,"text":471,"correct":22},{"key":28,"text":516,"correct":26},"组织可行性",{"key":31,"text":315,"correct":22},{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":24,"analysis":33},384016,"投标文件存在对招标文件响应的非实质性的微小偏差，则该投标文件应（ ）。",[522,524,526,528],{"key":20,"text":523,"correct":22},"不予淘汰，但需在订立合同前予以澄清",{"key":24,"text":525,"correct":26},"不予淘汰，但需在评估结束前予以澄清",{"key":28,"text":527,"correct":22},"不予淘汰，允许投标人重新投标",{"key":31,"text":529,"correct":22},"予以淘汰",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":20,"analysis":33},384017,"下面关于项目建议书的编写、申报和审批说法错误的是（ ）。",[534,536,538,540],{"key":20,"text":535,"correct":26},"对于规模较小的系统集成项目也不能省略项目建议书环节，更不能将其与项目可行性分析阶段合并。",{"key":24,"text":537,"correct":22},"项目建设单位组织编制项目建议书，在编制项目建议书阶段应专门组织项目需求分析，形成需求分析报告。",{"key":28,"text":539,"correct":22},"项目建设单位完成项目建议书编制工作之后，报送项目审批部门。",{"key":31,"text":541,"correct":22},"项目审批部门在征求相关部门意见，并委托有资格的咨询机构评估后审核批复，或报国务院审批后下达批复。",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":31,"analysis":33},384018,"发布项目章程，标志着项目的正式启动。以下围绕项目章程的叙述中，（ ）是不正确的。",[546,548,550,552],{"key":20,"text":547,"correct":22},"制定项目章程的工具和技术包括专家判断",{"key":24,"text":549,"correct":22},"项目章程要为项目经理提供授权，方便其使用组织资源进行项目活动",{"key":28,"text":551,"correct":22},"项目章程应当由项目发起人发布",{"key":31,"text":553,"correct":26},"项目经理应在制定项目章程后再任命",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":28,"analysis":33},384019,"在指导与管理项目工作时，可以通过会议来讨论和解决项目的相关问题。下面不属于会议分类的是（ ）。",[558,560,562,564],{"key":20,"text":559,"correct":22},"交换信息",{"key":24,"text":561,"correct":22},"头脑风暴、方案评估或方案设计",{"key":28,"text":563,"correct":26},"要点商讨",{"key":31,"text":565,"correct":22},"制定决策",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":28,"analysis":33},384020,"结束项目或阶段的输入不包括（ ）。",[570,572,574,576],{"key":20,"text":571,"correct":22},"项目管理计划",{"key":24,"text":573,"correct":22},"验收的可交付成果",{"key":28,"text":575,"correct":26},"组织过程资产更新",{"key":31,"text":577,"correct":22},"组织过程资产",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},384021,"以下各项中，（ ）不是整体变更控制的输入。",[582,584,586,588],{"key":20,"text":583,"correct":26},"己批准的纠正措施",{"key":24,"text":585,"correct":22},"己完成的可交付物",{"key":28,"text":587,"correct":22},"实际的绩效数据",{"key":31,"text":589,"correct":22},"己批准的项目管理计划",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":28,"analysis":33},384022,"变更请求是监控项目工作输出的一部分内容，则下面不属于变更的是（ ）。",[594,596,598,600],{"key":20,"text":595,"correct":22},"纠正措施",{"key":24,"text":597,"correct":22},"预防措施",{"key":28,"text":599,"correct":26},"修正措施",{"key":31,"text":601,"correct":22},"缺陷补救",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":28,"analysis":33},384023,"项目进行过程中，客户要求进度提前，围绕整体变更管理，项目经理以下做法，正确的是（ ）。",[606,608,610,612],{"key":20,"text":607,"correct":22},"进度变更和整体变更应一步到位，不要反复迭代",{"key":24,"text":609,"correct":22},"进度变更对成本、人力资源的影响，可在变更实施时再进行评价",{"key":28,"text":611,"correct":26},"先要求提出变更申请，走进度变更流程，然后根据变更后的新基线再进行相关的成本、人力资源等的变更",{"key":31,"text":613,"correct":22},"只要变更内容正确，即可执行变更",[615,618,621,624,627,630],{"id":616,"name":617,"category":7,"favorite":9},136,"法律职业试卷二(客观题 )",{"id":619,"name":620,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":622,"name":623,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":625,"name":626,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":628,"name":629,"category":7,"favorite":8},28,"安全工程师",{"id":631,"name":632,"category":7,"favorite":8},112,"安全生产法律知识"]