[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":599},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,19,50,1397,[13,34,46,58,70,82,94,106,118,129,141,153,165,176,188,200,212,220,232,244,255,266,278,290,302,313,325,337,347,359,371,380,392,404,412,424,435,444,456,468,480,492,503,515,527,539,551,563,575,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},384828,1,"单选题","某项目在招标时被分成5个标段，分别发包给不同的承包人。承包人中标后与招标人签订的是 （ ）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","单项项目承包合同",true,{"key":24,"text":25,"correct":26},"B","分包合同",false,{"key":28,"text":29,"correct":26},"C","单价合同",{"key":31,"text":32,"correct":26},"D","总承包合同","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},384829,"下述关于项目合同索赔处理的叙述中，不正确的是（ ）",[38,40,42,44],{"key":20,"text":39,"correct":26},"按业务性质分类，索赔可分为工程索赔和商务索赔",{"key":24,"text":41,"correct":22},"项目实施中的会议纪要和来往文件等不能作为索赔依据",{"key":28,"text":43,"correct":26},"建设单位向承建单位要求的赔偿称为反索赔",{"key":31,"text":45,"correct":26},"项目发生索赔事件后一般先由监理工程师调解",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},384830,"项目工作说明书是对项目提供的产品、成果或服务的描述，其内容一般不包括（）",[50,52,54,56],{"key":20,"text":51,"correct":26},"服务人员",{"key":24,"text":53,"correct":22},"技术方案选择",{"key":28,"text":55,"correct":26},"验收标准",{"key":31,"text":57,"correct":26},"收费及付款方式",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},384831,"某项目在启动阶段难以确定所需要的人员和资源，需要在实施过程中动态增加较多人员、专家和外部资源。在为该项目制订采购计划时需要确定采购合同类型，最适合该项目的合同类型是 （ ） 。",[62,64,66,68],{"key":20,"text":63,"correct":22},"时间和材料合同",{"key":24,"text":65,"correct":26},"成本加固定酬金合同",{"key":28,"text":67,"correct":26},"成本补偿合同",{"key":31,"text":69,"correct":26},"固定总价合同",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},384832,"以下关于采购工作说明书的叙述中，()是错误的",[74,76,78,80],{"key":20,"text":75,"correct":22},"采购说明书与项目范围基准没有关系",{"key":24,"text":77,"correct":26},"采购工作说明书与项目的工作说明书不同",{"key":28,"text":79,"correct":26},"应在编制采购计划的过程中编写采购工作说明书",{"key":31,"text":81,"correct":26},"采购工作说明书定义了与项目合同相关的范围",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},384833,"某项目建设方没有聘请监理，承建方项目组在编制采购计划时可包括的内容有 （ ） 。 ①第三方系统测试服务 ②设备租赁 ③建设方按照进度计划提供的货物 ④外部聘请的项目培训",[86,88,90,92],{"key":20,"text":87,"correct":26},"①②③",{"key":24,"text":89,"correct":26},"②③④",{"key":28,"text":91,"correct":26},"①③④",{"key":31,"text":93,"correct":22},"①②④",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},384834,"采购是项目管理工作的重要组成部分。以下关于采购的叙述中，（）是不正确的",[98,100,102,104],{"key":20,"text":99,"correct":26},"采购管理计划是评估卖方的衡量指标",{"key":24,"text":101,"correct":22},"采购工作说明书不是来自于项目范围基准",{"key":28,"text":103,"correct":26},"采购工作说明书描述采购产品的细节",{"key":31,"text":105,"correct":26},"采购管理计划确定采用的合同类型",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},384835,"编制询价计划的过程是为下一步招标所需要的文件做准备，并确定“选择供方”所需要的评定标准。（）不属于编制询价计划过程的输出。",[110,112,114,116],{"key":20,"text":111,"correct":22},"采购建议书",{"key":24,"text":113,"correct":26},"采购文档",{"key":28,"text":115,"correct":26},"评估标准",{"key":31,"text":117,"correct":26},"更新的工作说明书",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},384836,"某项目经理在执行项目时，在详细了解了项目所需要采购的产品和服务后，制定了包含如下所示的采购说明书模板，让采购人员填写。该工作说明书中缺少了 （ ） 。 表14-1——XX项目采购工作说明书样本 1-采购目标的详细描述2-采购工作范围 ——详细描述本次采购各个阶段要完成的工作； ——详细说明所采用的软硬件以及功能、性能。3-工作地点 ——工作进行的具体地点； ——详细阐明软硬件所使用的地方； ——员工必须在哪里和以什么方式工作。4-产品及服务的供货周期 ——详细说明每项工作的预计开始时间、结束时间和工作时间等； ——相关的进度信息。 5-适用标准",[122,124,125,127],{"key":20,"text":123,"correct":26},"拟采购产品和服务的规格说明",{"key":24,"text":55,"correct":22},{"key":28,"text":126,"correct":26},"质量要求",{"key":31,"text":128,"correct":26},"工作方式",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},384837,"某信息系统集成项目经理需要为项目采购硬件设备，那么项目经理需要在（）中对该采购物品进行描述",[133,135,137,139],{"key":20,"text":134,"correct":26},"建议邀请书",{"key":24,"text":136,"correct":26},"合同",{"key":28,"text":138,"correct":26},"合同范围说明书",{"key":31,"text":140,"correct":22},"项目工作说明书",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":28,"analysis":33},384838,"采购文件可用于识别干系人过程，因为这些文件（）",[145,147,149,151],{"key":20,"text":146,"correct":26},"是事业环境因素，并且是过程的输入",{"key":24,"text":148,"correct":26},"是组织过程资产，并且是过程的输入",{"key":28,"text":150,"correct":22},"将关键干系人标注为合同中的当事方",{"key":31,"text":152,"correct":26},"作为设立干系人优先级并将干系人分类的一种方式",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},384839,"某系统集成项目的项目经理需采购第三方软件插件，在编制询价计划时，由于待采购软件插件比较专业，为了更加明确采购需求，该项目经理需要使用的文件为（）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"供应商意见书",{"key":24,"text":160,"correct":26},"方案邀请书",{"key":28,"text":162,"correct":26},"投标邀请书",{"key":31,"text":164,"correct":26},"报价邀请书",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},384840,"在项目采购中经常使用询价过程，询价过程的输出不包括（）。",[169,171,173,174],{"key":20,"text":170,"correct":26},"合格卖方清单",{"key":24,"text":172,"correct":26},"采购工作说明书",{"key":28,"text":111,"correct":26},{"key":31,"text":175,"correct":22},"采购管理计划",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":28,"analysis":33},384841,"采购审计的主要目的是()",[180,182,184,186],{"key":20,"text":181,"correct":26},"确认合同项下收取的成本有效、正确",{"key":24,"text":183,"correct":26},"简要地审核项目",{"key":28,"text":185,"correct":22},"确定可供其他采购任务借鉴的成功之处",{"key":31,"text":187,"correct":26},"确认基本竣工",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":31,"analysis":33},384842,"下列选项中， （ ） 不是采购管理计划的内容。",[192,194,196,198],{"key":20,"text":193,"correct":26},"拟采用的合同类型",{"key":24,"text":195,"correct":26},"可能影响采购工作的制约因素和假设条件",{"key":28,"text":197,"correct":26},"如何确定采购\u002F合同工作说明书的形式和格式",{"key":31,"text":199,"correct":22},"确定项目经理的权责范围",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},384843,"某单位要对一个信息系统管理软件进行采购招标，相关负责人在制定价格因素评分细则时规定：投标人投标报价高于基准报价的，每高1%扣0．2分；同时在售后 服务因素评分细则中规定：投标人响应招标文件要求的得7分，投标人提出其他服务措施的，由评委酌情给1～3分。这些规定反映了制定招标评分标准的（ ） 原则。",[204,206,208,210],{"key":20,"text":205,"correct":26},"以客观事实为依据",{"key":24,"text":207,"correct":26},"执行国家规定、体现国家政策",{"key":28,"text":209,"correct":26},"严格控制自由裁量权",{"key":31,"text":211,"correct":22},"细则横向比较",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":28,"analysis":33},384844,"采购审计的主要目的是",[216,217,218,219],{"key":20,"text":181,"correct":26},{"key":24,"text":183,"correct":26},{"key":28,"text":185,"correct":22},{"key":31,"text":187,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":24,"analysis":33},384845,"甲公司在进行采购时选定了乙公司的产品，但在签订采购合同时没有对采购内容的交付时间进行约定，则以下说法错误的是()",[224,226,228,230],{"key":20,"text":225,"correct":26},"可以通过协议或交易习惯确定交付时间",{"key":24,"text":227,"correct":22},"不能通过协议或交易习惯确定的，则采购合同无效",{"key":28,"text":229,"correct":26},"乙公司可以随时履行交付义务",{"key":31,"text":231,"correct":26},"甲公司可以随时要求乙公司履行交付义务",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":20,"analysis":33},384846,"以下各项中，不属于定量风险分析工作成果的是 （ ） 。",[236,238,240,242],{"key":20,"text":237,"correct":22},"近期需优先应对的风险清单",{"key":24,"text":239,"correct":26},"项目的概率分析",{"key":28,"text":241,"correct":26},"经过量化的风险优先清单",{"key":31,"text":243,"correct":26},"实现成本和时间目标的概率",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":20,"analysis":33},384847,"在采购中，潜在买方的报价建议书是根据卖方的（）制定的",[248,250,251,253],{"key":20,"text":249,"correct":22},"采购文件",{"key":24,"text":115,"correct":26},{"key":28,"text":252,"correct":26},"工作说明书",{"key":31,"text":254,"correct":26},"招标通知",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":28,"analysis":33},384848,"某公司承担了一项系统集成项目，正在开发项目适用的软件系统，但是需要从其他公司购买一些硬设备。该公司的转包合同负责人应当首先准备一份()",[259,261,263,264],{"key":20,"text":260,"correct":26},"项目章程",{"key":24,"text":262,"correct":26},"项目范围说明书",{"key":28,"text":252,"correct":22},{"key":31,"text":265,"correct":26},"外包合同",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},384849,"投标人会议是在（）过程中采用的一种方法。",[270,272,274,276],{"key":20,"text":271,"correct":26},"开标",{"key":24,"text":273,"correct":22},"询价",{"key":28,"text":275,"correct":26},"评标",{"key":31,"text":277,"correct":26},"投标",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":20,"analysis":33},384850,"某公司现有的职员能轻易满足某新项目的一部分要求，但是这个项目的其他方面对该公司来说是新的。项目经理经过调研了解到一些供应商专业生产这类产品，可能能满足项目很多或全部需要。项目经理在准备项目计划和决定怎样招聘最佳人选及处理所需要的资源时，首先应该（）。",[282,284,286,288],{"key":20,"text":283,"correct":22},"进行自制\u002F外购分析",{"key":24,"text":285,"correct":26},"进行市场调查",{"key":28,"text":287,"correct":26},"通过邀请提交建议书（RFP）向供应商征求方案来决定是否将项目外包出去",{"key":31,"text":289,"correct":26},"评审公司采购部门提供的合格的卖方名单，并向选定的卖方发邀请提交建议书",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":20,"analysis":33},384851,"某企业在项目实施过程中，为降低项目成本、更好的满足客户需求，按照以下流程对项目所需的部分产品进行了采购：① 记录项目对于产品、服务或成果的需求，并且寻找潜在的供应商；② 从供应商处获取相关信息、报价和建议书；③ 审核所有建议书，在供应商中进行选择，并与选中者谈判签订最终合同；④ 管理合同以及买卖双方的关系，并管理与合同相关的变更。该企业的采购流程缺少了()环节。",[294,296,298,300],{"key":20,"text":295,"correct":22},"编制采购计划",{"key":24,"text":297,"correct":26},"编制询价计划",{"key":28,"text":299,"correct":26},"询价、招投标",{"key":31,"text":301,"correct":26},"合同管理和收尾",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":31,"analysis":33},384852,"项目采购计划的编制需要有适宜的方法，以规避项目风险，实现项目本目标，（ ）不属于项目采购计划编制采用的技术",[306,308,310,312],{"key":20,"text":307,"correct":26},"专家判断",{"key":24,"text":309,"correct":26},"合同类型",{"key":28,"text":311,"correct":26},"自制\u002F采购分析",{"key":31,"text":252,"correct":22},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},384853,"一个具有五个分包商的项目，分包商递交了变更请求，希望扩大其工作范围，根据对此请求的评审，决定对合同进行修订，该活动属于（）",[317,319,321,323],{"key":20,"text":318,"correct":22},"管理采购",{"key":24,"text":320,"correct":26},"实施采购",{"key":28,"text":322,"correct":26},"形成合同",{"key":31,"text":324,"correct":26},"解决争议",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":20,"analysis":33},384854,"()活动应在编制采购计划过程中进行。",[329,331,333,335],{"key":20,"text":330,"correct":22},"自制或外购决策",{"key":24,"text":332,"correct":26},"回答卖方的问题",{"key":28,"text":334,"correct":26},"制订合同",{"key":31,"text":336,"correct":26},"制订RFP文件",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},384855,"术部给采购部提供了一份采购产品的技术标准和要求，这份文件可被称做 （ ）",[341,343,344,346],{"key":20,"text":342,"correct":26},"项目建议书",{"key":24,"text":252,"correct":22},{"key":28,"text":345,"correct":26},"工作包",{"key":31,"text":262,"correct":26},{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":31,"analysis":33},384856,"自制或外购的决定需要考虑 （ ） 。",[351,353,355,357],{"key":20,"text":352,"correct":26},"战术成本和战略成本",{"key":24,"text":354,"correct":26},"管理成本和项目成本",{"key":28,"text":356,"correct":26},"拖延成本和滞留成本",{"key":31,"text":358,"correct":22},"直接成本和间接成本",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":24,"analysis":33},384857,"编制采购计划时，项目经理把一份“计算机的配置清单及相关的交付时间要求”提交给采购部。关于该文件与工作说明书的关系，以下表述 （ ） 是正确的。",[363,365,367,369],{"key":20,"text":364,"correct":26},"虽然能满足采购需求，但它是物品清单不是工作说明书",{"key":24,"text":366,"correct":22},"该清单不能作为工作说明书，不能满足采购验收需要",{"key":28,"text":368,"correct":26},"与工作说明书主要内容相符",{"key":31,"text":370,"correct":26},"工作说明书由于很专业应由供应商编制",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":20,"analysis":33},384858,"某项目经理要求采购管理员从外面供货商那里采购硬件设备时，需要准备一个（）以描述采购设备的相关质量技术指标、验收标准和付款方式与期待等内容。",[375,376,378,379],{"key":20,"text":252,"correct":22},{"key":24,"text":377,"correct":26},"合同范围说明",{"key":28,"text":260,"correct":26},{"key":31,"text":136,"correct":26},{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},384859,"某项目采购人员接到一个紧急采购任务后启动了询价流程。关于询价，下面说法不正确的是（）",[384,386,388,390],{"key":20,"text":385,"correct":22},"询价就是询问卖方的产品价格",{"key":24,"text":387,"correct":26},"询价主要是以卖方处获取如何满足项目需要的答复",{"key":28,"text":389,"correct":26},"询价过程是确定合格供应商名单",{"key":31,"text":391,"correct":26},"询价过程中却使卖方参与了大部分工作，买方也无需为其直接支付费用",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":31,"analysis":33},384860,"在对某项目采购供应商的评价中，评价项有：技术能力、管理水平、企业资质等，假定满分为10分，技术能力权重为20%，三个评定人的技术能力打分分别为7分，8分，9分，那么该供应商的“技术能力”的单项综合分为（）",[396,398,400,402],{"key":20,"text":397,"correct":26},"24",{"key":24,"text":399,"correct":26},"8",{"key":28,"text":401,"correct":26},"4.8",{"key":31,"text":403,"correct":22},"1.6",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":20,"analysis":33},384861,"活动应在编制采购计划过程中进行。",[408,409,410,411],{"key":20,"text":330,"correct":22},{"key":24,"text":332,"correct":26},{"key":28,"text":334,"correct":26},{"key":31,"text":336,"correct":26},{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":33},384862,"某系统集成一级企业年项目合同额近3亿元。采购部门要面临从交换机到固定螺丝及相关服务的大量采购任务，下面的采购措施中，不可取的是（）",[416,418,420,422],{"key":20,"text":417,"correct":22},"为防止采购人员可能出现经济问题，所有产品都按照统一规则、统一方法进行采购",{"key":24,"text":419,"correct":26},"按照重要程度将产品分为A类、B类、C类，分别制定采购规则，A类产品要通过招标，C类产品可简化采购手续",{"key":28,"text":421,"correct":26},"无论采购产品还是服务，都要建立对供应商的评价制度",{"key":31,"text":423,"correct":26},"建立和维护合格供应商名录来缩小采购选择的范围",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":28,"analysis":33},384863,"对于采购管理计划输入项的描述中，以下不正确的有 （ ） 。",[428,430,432,433],{"key":20,"text":429,"correct":26},"范围基准",{"key":24,"text":431,"correct":26},"合作协议",{"key":28,"text":172,"correct":22},{"key":31,"text":434,"correct":26},"风险记录",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":28,"analysis":33},384864,"在采购管理中，编制询价计划需要用到()",[439,441,442,443],{"key":20,"text":440,"correct":26},"标准表格",{"key":24,"text":115,"correct":26},{"key":28,"text":175,"correct":22},{"key":31,"text":249,"correct":26},{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":28,"analysis":33},384865,"配置项的状态可分为“草稿”“正式”和“修改”三种。以下关于配置项状态的叙述中，不正确的是 （ ） 。",[448,450,452,454],{"key":20,"text":449,"correct":26},"配置项处于“草稿”状态时，版本号格式为0.Y Z",{"key":24,"text":451,"correct":26},"配置项第一次成为“正式”文件时，版本号为1.0",{"key":28,"text":453,"correct":22},"配置项处于“修改”状态时，版本号应改回0.Y Z",{"key":31,"text":455,"correct":26},"对于配置项的任何版本都应该保存，不能抛弃旧版本",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":31,"analysis":33},384866,"《计算机软件产品开发文件编制指南》明确了软件文档分为 （ ） 三种类型。",[460,462,464,466],{"key":20,"text":461,"correct":26},"需求文档、设计文档、总结文档",{"key":24,"text":463,"correct":26},"开发文档、实施文档，验收文档",{"key":28,"text":465,"correct":26},"需求说明书、详细设计说明书、操作手册",{"key":31,"text":467,"correct":22},"开发文档、产品文档、管理文档",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},384867,"按照软件配置管理的基本指导思想，受控制的对象应是（ ）,实施软件配置管理包括4个最基本的活动，其中不包括（请作答此空）。",[472,474,476,478],{"key":20,"text":473,"correct":26},"配置项标识",{"key":24,"text":475,"correct":22},"配置项优化",{"key":28,"text":477,"correct":26},"配置状态报告",{"key":31,"text":479,"correct":26},"配置审计",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":20,"analysis":33},384868,"如果一个配置项的版本号为0.8，并即将发布，那么这个配置项处于（ ）状态。",[484,486,488,490],{"key":20,"text":485,"correct":22},"草稿",{"key":24,"text":487,"correct":26},"正式",{"key":28,"text":489,"correct":26},"修改",{"key":31,"text":491,"correct":26},"完成",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":28,"analysis":33},384869,"配置管理员（Configuration Management Officer，CMO），负责在整个项目生命周期中进行配置管理活动，具体有 （ ） 。①编写配置管理计划②建立和维护配置管理系统③审批配置基线④审批配置发布⑤对项目成员进行配置管理培训",[496,498,499,501],{"key":20,"text":497,"correct":26},"①②③④",{"key":24,"text":89,"correct":26},{"key":28,"text":500,"correct":22},"①②⑤",{"key":31,"text":502,"correct":26},"②③④⑤",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":28,"analysis":33},384870,"按照软件配置管理的基本指导思想，受控制的对象应是（请作答此空）,实施软件配置管理包括4个最基本的活动，其中不包括（ ）。",[507,509,511,513],{"key":20,"text":508,"correct":26},"软件元素",{"key":24,"text":510,"correct":26},"软件项目",{"key":28,"text":512,"correct":22},"软件配置项",{"key":31,"text":514,"correct":26},"软件过程",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},384871,"管理人员应将完成测试、准备交付的软件产品、文档和数据元素存入( )",[519,521,523,525],{"key":20,"text":520,"correct":26},"开发库",{"key":24,"text":522,"correct":22},"产品库",{"key":28,"text":524,"correct":26},"受控库",{"key":31,"text":526,"correct":26},"基线库",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":28,"analysis":33},384872,"文档的成功管理不包括（ ）",[531,533,535,537],{"key":20,"text":532,"correct":26},"文档管理制度",{"key":24,"text":534,"correct":26},"文档书写规范",{"key":28,"text":536,"correct":22},"文档加密",{"key":31,"text":538,"correct":26},"图表标号规则",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},384873,"在变更管理中，“变更初审”的目的是()",[543,545,547,549],{"key":20,"text":544,"correct":26},"确保评估所需信息准备的必要性",{"key":24,"text":546,"correct":22},"在干系人间就提出供评估的变更信息达成共识",{"key":28,"text":548,"correct":26},"以项目基准为评估依据",{"key":31,"text":550,"correct":26},"对变更实施进行监控",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":28,"analysis":33},384874,"以下关于需求变更策略的叙述中，（）是错误的。",[555,557,559,561],{"key":20,"text":556,"correct":26},"所有需求变更必须遵循变更控制过程",{"key":24,"text":558,"correct":26},"对于未获得核准的变更，不应该做变更实现工作",{"key":28,"text":560,"correct":22},"完成了对某个需求的变更之后，就可以删除或者修改变更请求的原文档",{"key":31,"text":562,"correct":26},"每一个需求变更必须能追溯到一个经核准的变更请求",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":28,"analysis":33},384875,"对变更效果的评估是变更管理中非常重要的一环， （ ） 不属于变更效果评估的内容。",[567,569,571,573],{"key":20,"text":568,"correct":26},"项目基准是评估依据",{"key":24,"text":570,"correct":26},"是否达到了变更提出时的要求",{"key":28,"text":572,"correct":22},"在干系人间就变更达成共识",{"key":31,"text":574,"correct":26},"评估变更的效率和效果",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},384876,"某大型系统集成项目由多个不同的承包商协作完成，项目涉及了分别代表7家公司的24个主要干系人、项目经理陈某直接管理的团队由7个项目小组长，每个项目小组长负责一支约15人的工作组。陈某意识到必须特别注意进行有效的整体变更控制，这表明他最应该关心的工作是()",[579,581,583,585],{"key":20,"text":580,"correct":26},"整合从项目的不同专业职能部门交付来的工作成果",{"key":24,"text":582,"correct":26},"设立一个专门的变更控制部门来监控所有的项目变更",{"key":28,"text":584,"correct":26},"保持基准计划的完整性。整合产品和项目的范围，并且协调那些跨知识领域的变更",{"key":31,"text":586,"correct":22},"关注可能引发变更的因素，确定已经发生的变更并管理实际发生的变更",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":31,"analysis":33},384877,"项目经理小王事后得知项目团队的一个成员已做了一个纠正措施，但是没有记录，小王接下来应该（）",[591,593,595,597],{"key":20,"text":592,"correct":26},"就该情况通知该成员的部门经理",{"key":24,"text":594,"correct":26},"撤销纠正措施",{"key":28,"text":596,"correct":26},"将该纠正行为记录文档",{"key":31,"text":598,"correct":22},"询问实施该纠正措施的理由",[600,604,607,610,613,616],{"id":601,"name":602,"category":7,"favorite":603},136,"法律职业试卷二(客观题 )",2,{"id":605,"name":606,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":608,"name":609,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":611,"name":612,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":614,"name":615,"category":7,"favorite":8},28,"安全工程师",{"id":617,"name":618,"category":7,"favorite":8},112,"安全生产法律知识"]