[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,18,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,271,283,295,307,319,331,343,355,367,379,391,403,415,427,439,450,462,473,485,497,506,518,530,542,553,565,573,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},384778,1,"单选题","某电信企业要建设一个CRM系统（包括呼叫中心和客服中心），系统集成一级资质企业甲和系统集成二级资质企业乙参与该系统建设。关于合同的签订，下面说法中， （ ） 是正确的。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","如电信企业和乙签订CRM建设总包合同，则乙和甲就呼叫中心的建设只能签订分包合同",true,{"key":24,"text":25,"correct":26},"B","如电信企业和乙签订客服中心建设总包合同，则电信企业和甲就CRM的建设只能签订总价合同",false,{"key":28,"text":29,"correct":26},"C","如电信企业和乙签订客服中心建设单项承包合同，则电信企业和甲就CRM的建设只能签订单项承包合同",{"key":31,"text":32,"correct":26},"D","如果电信企业和甲签订CRM建设总价合同，则甲和乙就呼叫中心的建设只能签订单价合同","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},384779,"合同一旦签署了就具有法律约束力，除非（）",[38,40,42,44],{"key":20,"text":39,"correct":26},"—方不愿意履行义务",{"key":24,"text":41,"correct":22},"损害社会公共利益",{"key":28,"text":43,"correct":26},"一方宣布合同无效",{"key":31,"text":45,"correct":26},"—方由于某种原因破产",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},384780,"合同变更控制系统用来规范合同变更，保证买卖双方在合同变更 过程中达成一致,其内容不包括( )。",[50,52,54,56],{"key":20,"text":51,"correct":26},"变更跟踪系统",{"key":24,"text":53,"correct":26},"变更书面记录",{"key":28,"text":55,"correct":26},"变更争议解决程序",{"key":31,"text":57,"correct":22},"合同审计程序",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},384781,"某项目因甲方不能提供实施环境，严重影响了项目进度，为此项 目组按下列流 程提出了索赔。图中各方指的是( )。",[62,64,66,68],{"key":20,"text":63,"correct":26},"①招标单位 ②承建单位 ③建设单位",{"key":24,"text":65,"correct":26},"①政府部门 ②建设单位 ③承建单位",{"key":28,"text":67,"correct":26},"①建设单位 ②承建单位 ③监理单位",{"key":31,"text":69,"correct":22},"①承建单位 ②建设单位 ⑧监理单位",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},384782,"对于承建单位而言，若某系统集成项目工程量较大、工期较短、涉及到众多的新集成技术，则该项目适宜选择的合同类型是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"单价合同",{"key":24,"text":77,"correct":22},"成本加酬金合同",{"key":28,"text":79,"correct":26},"固定价格合同",{"key":31,"text":81,"correct":26},"总价合同",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},384783,"如果承建单位项目经理由于工作失误导致采购的设备不能按期到货，施工合同没有按期完成，则建设单位可以要求 （ ） 承担责任。",[86,88,90,92],{"key":20,"text":87,"correct":22},"承建单位",{"key":24,"text":89,"correct":26},"监理单位",{"key":28,"text":91,"correct":26},"设备供应商",{"key":31,"text":93,"correct":26},"项目经理",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},384784,"工程建设合同纠纷的仲裁由 （ ） 的仲裁委员会仲裁。仲裁委员会做出裁决以后，当事人应当履行。",[98,100,102,104],{"key":20,"text":99,"correct":26},"工程所在地",{"key":24,"text":101,"correct":26},"建设单位所在地",{"key":28,"text":103,"correct":26},"承建单位所在地",{"key":31,"text":105,"correct":22},"合同双方选定",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},384785,"甲公司在进行采购时选定了乙公司的产品，但在签订采购合同时没有对采购内容的交付时间进行约定，则以下说法错误的是 （ ） 。",[110,112,114,116],{"key":20,"text":111,"correct":26},"可以通过协议或交易习惯确定交付时间",{"key":24,"text":113,"correct":22},"不能通过协议或交易习惯确定的，则采购合同无效",{"key":28,"text":115,"correct":26},"乙公司可以随时履行交付义务",{"key":31,"text":117,"correct":26},"甲公司可以随时要求乙公司履行交付义务",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},384786,"项目经理小张想要与客户就合同变更事宜进行沟通，他应该采取（）沟通方式比较合适。",[122,124,126,128],{"key":20,"text":123,"correct":26},"口头、非正式",{"key":24,"text":125,"correct":26},"书面、非正式",{"key":28,"text":127,"correct":26},"口头、正式",{"key":31,"text":129,"correct":22},"书面、正式",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},384787,"某小型系统集成项目，甲乙双方只订立了口头合同。工程完工后，因甲方拖欠乙方工程款项发生风险，应当认定该合同（）",[134,136,138,140],{"key":20,"text":135,"correct":22},"未成立",{"key":24,"text":137,"correct":26},"补签后成立",{"key":28,"text":139,"correct":26},"成立",{"key":31,"text":141,"correct":26},"备案登记后成立",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},384788,"根据监理委托合同规定范围和建设单位的具体要求，以 （10） 为对象而编制的。",[146,148,150,152],{"key":20,"text":147,"correct":26},"被监理的承建单位",{"key":24,"text":149,"correct":26},"监理机构",{"key":28,"text":151,"correct":22},"被监理的信息系统工程项目",{"key":31,"text":153,"correct":26},"建设单位",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},384789,"通过招标过程确定中标人后,实施合同内的合同价款应为( )。",[158,160,162,164],{"key":20,"text":159,"correct":26},"招标预算价",{"key":24,"text":161,"correct":22},"中标者的投标价",{"key":28,"text":163,"correct":26},"所有投标价的均价",{"key":31,"text":165,"correct":26},"评标委员会综合各方面因素后给出的建议价",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},384790,"为保证合同订立的合法性，关于合同签订，以下说法不正确的是（）",[170,172,174,176],{"key":20,"text":171,"correct":26},"订立合同的当事人双方应当具有相应的民事权利能力和民事行为能力",{"key":24,"text":173,"correct":26},"为保障双方利益，应在合同正文部分或附件中清晰规定质量验收标准，并可在合同签署生效后协议补充",{"key":28,"text":175,"correct":22},"对于项目完成后发生技术性问题的处理与维护，如果合同中没有相关条款，默认维护期限为一年",{"key":31,"text":177,"correct":26},"合同价款或者报酬等内容，在合同签署生效后，还可以进行协议补充",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},384791,"某机构信息系统集成项目进行到项目中期，建设单位单方面终止合作，承建单位于2010年7月1日发出索赔通知书，承建单位最迟应在（）之前向监理方提出延长工期和（或）补偿经济损失的索赔报告及有关资料",[182,184,186,188],{"key":20,"text":183,"correct":26},"40390",{"key":24,"text":185,"correct":26},"40391",{"key":28,"text":187,"correct":22},"2010年7月29日",{"key":31,"text":189,"correct":26},"40375",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},384792,"建设方和承建方甲就某信息系统建设项目进行了多次合同谈判均未达成一致，未能签定系统建设合同，但在谈判期间建设方获悉了甲的行业关键技术指标。之后建设方与另一承建方乙经过合同谈判后就系统建设签定了合同，同时将甲的关键技术指标透露给乙，导致甲蒙受损失。下列说法中，()是正确的。",[194,196,198,200],{"key":20,"text":195,"correct":22},"建设方对甲蒙受的损失应承担赔偿责任",{"key":24,"text":197,"correct":26},"建设方和甲未签定合同，对甲蒙受的损失不应承担赔偿责任",{"key":28,"text":199,"correct":26},"乙和甲未签定合同，对甲蒙受的损失不应承担赔偿责任",{"key":31,"text":201,"correct":26},"甲的损失是由于其自身保密工作未做好，其损失应全部由其自身承担",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},384793,"为出售公司软件产品，张工为公司草拟了一份合同，其中写明“软件交付以后，买方应尽快安排付款”。经理看完后让张工重新修改，原因是（）",[206,208,210,212],{"key":20,"text":207,"correct":26},"没有使用国家或行业标准的合同形式",{"key":24,"text":209,"correct":22},"用语含混不清，容易引起歧义",{"key":28,"text":211,"correct":26},"名词术语使用错误",{"key":31,"text":213,"correct":26},"措辞不够书面化",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},384794,"某软件开发项目合同规定，需求分析要经过客户确认后方可进行软件设计。但建设单位以客户代表出国、其他人员不知情为由拒绝签字，造成进度延期。软件开发单位进行索赔一般按()顺序较妥当。①由该项目的监理方进行调解②由经济合同仲裁委员会仲裁③由有关政府主管机构仲裁",[218,220,222,224],{"key":20,"text":219,"correct":26},"①②③",{"key":24,"text":221,"correct":22},"①③②",{"key":28,"text":223,"correct":26},"③①②",{"key":31,"text":225,"correct":26},"②①③",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},384795,"某系统集成商M公司于甲方签订了一份电子商务平台建设项目，合同中规定，如果系统交付后存在质量问题，系统集成商M应提供免费的及时维护服务，M公司按合同要求交付了系统，双方签订了验收报告。在此后的一年内，M公司及时响应了甲方的维护要求，一年之后，M公司向甲方提出此后的技术服务应该为有偿服务，甲方认为合同中提到的免费服务并无具体期限，M公司的收费要求是不合理的。下列说法中（）是最恰当的。",[230,232,234,236],{"key":20,"text":231,"correct":26},"因为合同中规定的免费服务并无具体期限，因此M公司要求收费不合理",{"key":24,"text":233,"correct":26},"应对甲方的服务要求进行分类，如是处理质量问题，则M公司应无限期免费服务",{"key":28,"text":235,"correct":26},"M公司已经提供了一年的免费服务，此后要求对服务收费是合理的",{"key":31,"text":237,"correct":22},"合同内容不明确，可根据有关信息化工程建设的法律、法规处理",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},384796,"以下关于合同变更的叙述中，（）是不正确的。",[242,244,246,248],{"key":20,"text":243,"correct":26},"合同变更一般处理程序如下：变更的提出、变更请求的审查、变更的批准、变更的实施",{"key":24,"text":245,"correct":22},"变更申请可以以口头形式提出，变更评估必须采取书面方式",{"key":28,"text":247,"correct":26},"对于任何变更的评估都应该有变更影响分析",{"key":31,"text":249,"correct":26},"合同变更的处理由合同变更控制系统来完成",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},384797,"某项目甲乙双方签订了建设合同，其中对工程款支付及知识产权的描述分别是“……甲方在系统安装完毕，经试运行及初验合格后，收到乙方材料XX日内，支付第二笔款XXXX元。乙方提供的材料包括：①商业发票；②……”，从上述描述可看出，支付第二笔款还必须附加的材料是()",[254,256,258,260],{"key":20,"text":255,"correct":26},"第三方测试报告",{"key":24,"text":257,"correct":22},"初验报告",{"key":28,"text":259,"correct":26},"专家评审报告",{"key":31,"text":261,"correct":26},"监理工作总结报告",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},384798,"某承建单位准备把机房项目中的消防系统工程分包出去，并准备了详细的设计图纸和各项说明。该项目工程包括：火灾自动报警、广播、火灾早期报警灭火等。该工程宜采用 ()",[266,267,268,269],{"key":20,"text":75,"correct":26},{"key":24,"text":77,"correct":26},{"key":28,"text":81,"correct":22},{"key":31,"text":270,"correct":26},"委托合同",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},384799,"索赔是合同管理中经常会碰到的问题，以下关于索赔管理的描述中，（）是正确的。",[275,277,279,281],{"key":20,"text":276,"correct":22},"一方或双方存在违约行为和事实是合同索赔的前提",{"key":24,"text":278,"correct":26},"凡是遇到客观原因造成的损失，承包商都可以申请费用补偿",{"key":28,"text":280,"correct":26},"索赔是对对方违约行为的一种惩罚",{"key":31,"text":282,"correct":26},"承建方应该将索赔通知书直接递交建设方，监理方不参与索赔管理",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":28,"analysis":33},384800,"按照我国建设部、财政部下达的通用条款，下列关于索赔的说法错误的是（）。",[287,289,291,293],{"key":20,"text":288,"correct":26},"索赔必须以合同为依据",{"key":24,"text":290,"correct":26},"索赔必须注意资料的积累",{"key":28,"text":292,"correct":22},"索赔是一种惩罚行为",{"key":31,"text":294,"correct":26},"索赔处理要及时、合理",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":20,"analysis":33},384801,"甲公司与乙公司订立了一份总货款额为20万元的设备供货合同。合同约定的违约金为货款总额总值的10%。同时，甲公司向乙公司给付定金5000元。后乙公司违约，给甲公司造成损失2万元。乙公司依法向甲公司支付违约金（）万元。",[299,301,303,305],{"key":20,"text":300,"correct":22},"2",{"key":24,"text":302,"correct":26},"2.5",{"key":28,"text":304,"correct":26},"4",{"key":31,"text":306,"correct":26},"1.5",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},384802,"合同的内容就是当事人订立合同时的各项合同条款，下列不属于项目合同主要内容的是（） 。",[311,313,315,317],{"key":20,"text":312,"correct":26},"项目费用及支付方式",{"key":24,"text":314,"correct":22},"项目干系人管理",{"key":28,"text":316,"correct":26},"违约责任",{"key":31,"text":318,"correct":26},"当事人各自权力、义务",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":28,"analysis":33},384803,"承建单位有时为了获得项目可能将信息系统的作用过分夸大，使得建设单位对信息系统的预期过髙。除此之外，建设单位对信息系统的期望可能会随着自己对系统的熟悉而提高。为避免此类情况的发生，在合同中清晰地规定（）对双方都是有益的。",[323,325,327,329],{"key":20,"text":324,"correct":26},"保密约定",{"key":24,"text":326,"correct":26},"售后服务",{"key":28,"text":328,"correct":22},"验收标准",{"key":31,"text":330,"correct":26},"验收时间",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":20,"analysis":33},384804,"()属于要约。",[335,337,339,341],{"key":20,"text":336,"correct":22},"商场的有奖销售活动",{"key":24,"text":338,"correct":26},"商业广告",{"key":28,"text":340,"correct":26},"寄送的价目表",{"key":31,"text":342,"correct":26},"招标公告",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":24,"analysis":33},384805,"某招标文件包括：招标项目的技术要求、对投标人资格审查的标准、投标报价要求、评标标准。该招标文件还缺少 （ ） 。",[347,349,351,353],{"key":20,"text":348,"correct":26},"评标组构成",{"key":24,"text":350,"correct":22},"拟签订合同的主要条款",{"key":28,"text":352,"correct":26},"特定的生产供应者",{"key":31,"text":354,"correct":26},"是否要求投标人组成联合体共同投标",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},384806,"关于中标条件的叙述中， （ ） 是最为完整正确的。",[359,361,363,365],{"key":20,"text":360,"correct":22},"能够最大限度地满足招标文件中规定的各项综合评价标准",{"key":24,"text":362,"correct":26},"能够满足招标文件的实质性要求，并且经评审的投标价格最低",{"key":28,"text":364,"correct":26},"能够很好地满足招标文件中规定的各项综合评价标准",{"key":31,"text":366,"correct":26},"能够满足招标文件的实质性要求，并且经评审的投标价格合理",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":31,"analysis":33},384807,"招标人采用邀请招标方式的，应当向三个以上具备承担招标项目的能力、资信良好 （ ） 发出投标邀请书。",[371,373,375,377],{"key":20,"text":372,"correct":26},"不特定的法人",{"key":24,"text":374,"correct":26},"特定的法人",{"key":28,"text":376,"correct":26},"不特定的法人或者其他组织",{"key":31,"text":378,"correct":22},"特定的法人或者其他组织",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":28,"analysis":33},384808,"合同法律关系是指由合同法律规范调整的在民事流转过程中形成的()",[383,385,387,389],{"key":20,"text":384,"correct":26},"买卖关系",{"key":24,"text":386,"correct":26},"监督关系",{"key":28,"text":388,"correct":22},"权利义务关系",{"key":31,"text":390,"correct":26},"管控关系",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},384809,"开发合同中索赔的性质属于（ ）",[395,397,399,401],{"key":20,"text":396,"correct":22},"经济补偿",{"key":24,"text":398,"correct":26},"经济惩罚",{"key":28,"text":400,"correct":26},"经济制裁",{"key":31,"text":402,"correct":26},"经济补偿和经济制裁",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},384810,"对于工作模式或产品界定不甚明确的外包项目，承建方一般愿意采用的合同形式是（ ）",[407,409,411,413],{"key":20,"text":408,"correct":26},"固定总价合同",{"key":24,"text":410,"correct":26},"成本补偿合同",{"key":28,"text":412,"correct":22},"工时和材料合同",{"key":31,"text":414,"correct":26},"采购单",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},384811,"对承建方来说，固定单价合同适用于 （ ） 的项目。",[419,421,423,425],{"key":20,"text":420,"correct":26},"工期长，工程量变化幅度很大",{"key":24,"text":422,"correct":26},"工期长，工程量变化幅度不太大",{"key":28,"text":424,"correct":22},"工期短，工程量变化幅度不太大",{"key":31,"text":426,"correct":26},"工期短，工程量变化幅度很大",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":31,"analysis":33},384812,"系统集成合同管理是管理建设方与承建方的关系，保证承建方的实际工作满足合同要求的过程。其内容不包括（）。",[431,433,435,437],{"key":20,"text":432,"correct":26},"合同签订管理",{"key":24,"text":434,"correct":26},"合同履行管理",{"key":28,"text":436,"correct":26},"合同变更管理",{"key":31,"text":438,"correct":22},"合同违法管理",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":28,"analysis":33},384813,"按照付款方式的不同，工程合同分为 （ ） 。① 总价合同 ② 单价合同 ③ 分包合同 ④ 成本加酬金合同",[443,445,446,448],{"key":20,"text":444,"correct":26},"①②③④",{"key":24,"text":219,"correct":26},{"key":28,"text":447,"correct":22},"①②④",{"key":31,"text":449,"correct":26},"①③④",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":28,"analysis":33},384814,"合同管理是项目管理中一个重要的组成部分、其中合同（）管理是合同管理的基础。",[454,456,458,460],{"key":20,"text":455,"correct":26},"索赔",{"key":24,"text":457,"correct":26},"履行",{"key":28,"text":459,"correct":22},"档案",{"key":31,"text":461,"correct":26},"变更",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},384815,"某机构信息系统集成项目进行到项目中期，建设单位单方面终止合作，承建单位于2010年7月1日发出索赔通知书，承建单位最迟应在 （ ） 之前向监理方提出延长工期和（或）补偿经济损失的索赔报告及有关资料。",[466,468,470,471],{"key":20,"text":467,"correct":26},"2010年7月31日",{"key":24,"text":469,"correct":26},"2010年8月1日",{"key":28,"text":187,"correct":22},{"key":31,"text":472,"correct":26},"2010年7月16日",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},384816,"在合同谈判前，要制定切合实际的谈判目标，要抓住实质问题，要营造一个平等协商的氛围。这些工作在合同管理中属于（）管理。",[477,479,481,483],{"key":20,"text":478,"correct":22},"合同签订",{"key":24,"text":480,"correct":26},"合同履行",{"key":28,"text":482,"correct":26},"合同变更",{"key":31,"text":484,"correct":26},"合同档案",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},384817,"当一方当事人不履行仲裁裁决时，另一方当事人可以依照民事诉讼法的有关规定向 （ ） 申请执行。",[489,491,493,495],{"key":20,"text":490,"correct":26},"当地人民政府",{"key":24,"text":492,"correct":22},"人民法院",{"key":28,"text":494,"correct":26},"仲裁委员会",{"key":31,"text":496,"correct":26},"调节委员会",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},384818,"合同变更控制系统规定合同修改的过程，包括 （） 。① 文书工作 ② 跟踪系统 ③ 争议解决程序 ④ 合同索赔处理",[501,502,504,505],{"key":20,"text":219,"correct":22},{"key":24,"text":503,"correct":26},"②③④",{"key":28,"text":447,"correct":26},{"key":31,"text":449,"correct":26},{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},384819,"某机构将一大型信息系统集成项目分成3个包进行招标，共有3家承包商中标，发包人与承包商应签署（）",[510,512,514,516],{"key":20,"text":511,"correct":26},"技术转让合同",{"key":24,"text":513,"correct":22},"单项项目承包合同",{"key":28,"text":515,"correct":26},"分包合同",{"key":31,"text":517,"correct":26},"总承包合同",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":28,"analysis":33},384820,"某视频监控项目建设到中期，建设方于2015年8月1日单方面宣布停工，承建单位最迟应在（）之前向监理方以书面形式提出索赔意向通知。",[522,524,526,528],{"key":20,"text":523,"correct":26},"2015年8月31日",{"key":24,"text":525,"correct":26},"2015年8月21日",{"key":28,"text":527,"correct":22},"2015年8月29日",{"key":31,"text":529,"correct":26},"2015年8月16日",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":20,"analysis":33},384821,"某项工程需在室外进行线缆铺设，但由于连续大雨造成承建方一直无法施工，开工日期比计划晚了2 周(合同约定持续 1 周以内的天气异常不属于反常天气)，给承建方造成一定的经济损失。承建方若寻求补偿，应当 （）",[534,536,538,540],{"key":20,"text":535,"correct":22},"要求延长工期补偿",{"key":24,"text":537,"correct":26},"要求费用补偿",{"key":28,"text":539,"correct":26},"要求延长工期补偿、费用补偿",{"key":31,"text":541,"correct":26},"自己克服",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":24,"analysis":33},384822,"下列关于索赔的描述中，错误的是（）",[546,547,549,551],{"key":20,"text":288,"correct":26},{"key":24,"text":548,"correct":22},"索赔的性质属于经济惩罚行为",{"key":28,"text":550,"correct":26},"项目发生索赔事件后，合同双方可以通过协商方式解决",{"key":31,"text":552,"correct":26},"合同索赔是规范合同行为的一种约束力和保障措施",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},384823,"当 （ ） 时，合同可能认定为无效。",[557,559,561,563],{"key":20,"text":558,"correct":22},"合同甲乙双方损害了社会共同利益",{"key":24,"text":560,"correct":26},"合同中缺少违约条款",{"key":28,"text":562,"correct":26},"合同标的规格约定不清",{"key":31,"text":564,"correct":26},"合同中包括对人身伤害的免责条款",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":31,"analysis":33},384824,"某系统集成商M公司与甲方签订了一份电子商务平台建设项目，合同中规定，如果系统交付后存在质量问题，系统集成商M应提供免费的及时维护服务，M公司按合同要求交付了系统，双方签订了验收报告。在此后的一年内，M公司及时响应了甲方的维护请求，一年之后，M公司向甲方提出此后的技术服务应该为有偿服务，甲方认为合同中提到的免费服务并无具体期限，M公司的收费要求是不合理的。下列说法中， （ ） 是最恰当的。",[569,570,571,572],{"key":20,"text":231,"correct":26},{"key":24,"text":233,"correct":26},{"key":28,"text":235,"correct":26},{"key":31,"text":237,"correct":22},{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":31,"analysis":33},384825,"M公司委托T公司开发一套新的管理信息系统，T公司未能按合同规定的日期交付最终产品，给M公司照成巨大的运营损失，因此M公司向T公司提出索赔，其中不包括()",[577,579,581,583],{"key":20,"text":578,"correct":26},"清算赔偿金",{"key":24,"text":580,"correct":26},"间接损失赔偿金",{"key":28,"text":582,"correct":26},"补偿性赔偿金",{"key":31,"text":584,"correct":22},"惩罚性赔偿金",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":28,"analysis":33},384826,"系统集成商与建设方在一个ERP项目的谈判过程中，建设方提出如下要求：系统初验时间为2010年6月底（付款50%）；正式验收时间为2010年10月底（累计付款80%）；系统运行服务期限为一年（可能累计付款100%）；并希望长期提供应用软件技术支持。系统集成商在起草项目建设合同时，合同期限设定到 （ ） 为妥。",[589,591,593,595],{"key":20,"text":590,"correct":26},"2010年10月底",{"key":24,"text":592,"correct":26},"2011年6月底",{"key":28,"text":594,"correct":22},"2011年10月底",{"key":31,"text":596,"correct":26},"长期",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":31,"analysis":33},384827,"某办公大楼的开发商将办公楼的智能楼宇系统承包给H公司，双方签订了合同，开发商还聘请了监理方对此项目进行监理。期间，消防子系统验收延误，开发商认为是H公司的责任，向监理方提出了索赔要求。关于索赔流程，下列说法中， （ ） 是正确的。",[601,603,605,607],{"key":20,"text":602,"correct":26},"开发商应在验收延误事件发生后20天内提出索赔意向通知",{"key":24,"text":604,"correct":26},"监理方收到索赔通知后，应在28天内帮助开发商编制出索赔报告",{"key":28,"text":606,"correct":26},"监理方应在索赔报告中充分论证该事件的确为开发商带来了损失，并提出具体的赔偿方案",{"key":31,"text":608,"correct":22},"如果H公司不同意监理方做出的索赔决定，可提请仲裁或法律诉讼",[610,614,617,620,623,626],{"id":611,"name":612,"category":7,"favorite":613},136,"法律职业试卷二(客观题 )",2,{"id":615,"name":616,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":618,"name":619,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":621,"name":622,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":624,"name":625,"category":7,"favorite":8},28,"安全工程师",{"id":627,"name":628,"category":7,"favorite":8},112,"安全生产法律知识"]