[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,17,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,188,197,209,221,233,245,257,269,281,293,305,313,325,333,345,357,369,377,389,401,413,425,437,449,461,473,485,497,509,521,533,541,553,565,577,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},384727,1,"单选题","项目经理的权力有多种来源，其中（ ）是由于他人对你的认可和敬佩从而愿意模仿和服从你，以及希望自己成为你那样的人而产生的，这是一种人格魅力。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","职位权利",false,{"key":24,"text":25,"correct":22},"B","奖励权利",{"key":27,"text":28,"correct":22},"C","专业权力",{"key":30,"text":31,"correct":32},"D","参照权力",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},384728,"某项目经理在编制干系人管理计划,绘制的如下表格是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"干系人职责分配矩阵干",{"key":24,"text":41,"correct":22},"干系人优先矩阵干",{"key":27,"text":43,"correct":32},"干系人参与评估矩阵",{"key":30,"text":45,"correct":22},"干系人亲和图",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},384729,"关于项目沟通方式的叙述，不正确的是（ ）",[50,52,54,56],{"key":20,"text":51,"correct":32},"沟通方式的选择与沟通渠道有关，与沟通技术无关",{"key":24,"text":53,"correct":22},"常用的沟通方式有书面沟通，口头沟通",{"key":27,"text":55,"correct":22},"口头的沟通方式比较为人性化，容易使沟通双方充分了解",{"key":30,"text":57,"correct":22},"必要时要用正式会议的形式进行沟通",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},384730,"根据项目干系人权利\u002F利益的分类，针对项目有重大影响，同时项目执行对其有明显利益关系的干系人应采用（ ）的管理策略。",[62,64,66,68],{"key":20,"text":63,"correct":22},"监督",{"key":24,"text":65,"correct":22},"随时告知",{"key":27,"text":67,"correct":22},"令其满意",{"key":30,"text":69,"correct":32},"重点管理",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},384731,"在沟通管理中，沟通方式的选择是一项重要的工作。（）不是书面沟通的特点。",[74,76,78,80],{"key":20,"text":75,"correct":32},"沟通速度快",{"key":24,"text":77,"correct":22},"歧义性少",{"key":27,"text":79,"correct":22},"内容清晰",{"key":30,"text":81,"correct":22},"信息充分",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},384732,"某公司正在编制项目干系人沟通的计划，以下选项中（）属于干系人沟通计划的内容。①干系人需要哪些信息 ②各类项目文件的访问路径③各类项目文件的内容 ④各类项目文件的接受格式 ⑤各类文件的访问权限",[86,88,90,92],{"key":20,"text":87,"correct":22},"①②③④⑤",{"key":24,"text":89,"correct":22},"①②③④",{"key":27,"text":91,"correct":32},"①②④⑤",{"key":30,"text":93,"correct":22},"②③④⑤",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},384733,"在沟通过程中,当发送方自认为已经掌握了足够的信息,有了自 己的想法且不需要进一步听取多方意见时, 一般会选择( )进行沟通。",[98,100,102,104],{"key":20,"text":99,"correct":22},"征询方式",{"key":24,"text":101,"correct":22},"参与讨论方式",{"key":27,"text":103,"correct":22},"推销方式",{"key":30,"text":105,"correct":32},"叙述方式",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},384734,"沟通是项目管理和团队建设中的重要环节。下面关于沟通的说法中（）是正确的。",[110,112,114,116],{"key":20,"text":111,"correct":22},"正式沟通优于非正式沟通，项目经理不应鼓励团队成员的非正式沟通和交流。",{"key":24,"text":113,"correct":22},"水平沟通优于垂直沟通，项目经理不应鼓励团队成员的垂直沟通。",{"key":27,"text":115,"correct":32},"集中办公和会议有利于提高沟通效率，是团队建设的有效手段。",{"key":30,"text":117,"correct":22},"沟通的及时性是沟通的第一目标，项目的所有问题需第一时间与干系人沟通。",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},384735,"某公司刚刚宣布下个月将要裁员，并且极可能包括张工项目团队里的一些成员。团队成员议论纷纷，已无心正常工作。张工告诉团队：“让我们冷静下来，回到工作上去，也许我们下个月的绩效可以保住我们的工作”。此时，张工采取的解决冲突技术是 （ ） 。",[122,124,126,128],{"key":20,"text":123,"correct":22},"妥协",{"key":24,"text":125,"correct":22},"强制",{"key":27,"text":127,"correct":22},"安抚",{"key":30,"text":129,"correct":32},"撤退",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},384736,"在项目管理中，进行信息分发时， （ ） 的特点是：复杂程度高，往往不受当事人的控制",[134,136,138,140],{"key":20,"text":135,"correct":22},"正式沟通",{"key":24,"text":137,"correct":22},"非正式沟通",{"key":27,"text":139,"correct":22},"垂直沟通",{"key":30,"text":141,"correct":32},"水平沟通",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},384737,"以下关于项目沟通原则的叙述中， （ ） 是不正确的。",[146,148,150,152],{"key":20,"text":147,"correct":32},"面对面的会议是唯一有效地沟通和解决干系人之间问题的方法",{"key":24,"text":149,"correct":22},"非正式的沟通有利于关系的融洽",{"key":27,"text":151,"correct":22},"有效地沟通方式通常是采用对方能接受的沟通风格",{"key":30,"text":153,"correct":22},"有效利用沟通的升级原则",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},384738,"( )是制订项目沟通管理计划的输入。",[158,160,162,164],{"key":20,"text":159,"correct":22},"沟通技术",{"key":24,"text":161,"correct":22},"项目可行性分析",{"key":27,"text":163,"correct":22},"成本控制",{"key":30,"text":165,"correct":32},"项目范围说明书",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},384739,"状态会议的目的是()",[170,172,174,176],{"key":20,"text":171,"correct":32},"交换项目信息",{"key":24,"text":173,"correct":22},"让团队成员汇报正在执行的工作",{"key":27,"text":175,"correct":22},"签发工作授权",{"key":30,"text":177,"correct":22},"确认团队提交的成本的准确性",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},384740,"在信息分发过程中，如果为了使沟通更加清晰、减少二义性，并且可以留下备忘录，那么应该采取的沟通方式是（）。",[182,184,186,187],{"key":20,"text":183,"correct":32},"书面沟通",{"key":24,"text":185,"correct":22},"电话录音",{"key":27,"text":139,"correct":22},{"key":30,"text":141,"correct":22},{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":20,"analysis":33},384741,"在项目沟通管理过程中存在若干影响因素，其中潜在的技术影响因素包括（）①对信息需求的迫切性②资金是否到位③预期的项目人员配备④项目环境⑤项目时间的长短",[192,194,195,196],{"key":20,"text":193,"correct":32},"①③④⑤",{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":22},{"key":30,"text":93,"correct":22},{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":30,"analysis":33},384742,"项目经理小张想要与客户就合同变更事宜进行沟通，他应该采取 （ ） 沟通方式比较合适。",[201,203,205,207],{"key":20,"text":202,"correct":22},"口头、非正式",{"key":24,"text":204,"correct":22},"书面、非正式",{"key":27,"text":206,"correct":22},"口头、正式",{"key":30,"text":208,"correct":32},"书面、正式",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":24,"analysis":33},384743,"在实际沟通中，（ ）更有利于被询问者表达自己的见解和情绪",[213,215,217,219],{"key":20,"text":214,"correct":22},"封闭式问题",{"key":24,"text":216,"correct":32},"开放式问题",{"key":27,"text":218,"correct":22},"探询式问题",{"key":30,"text":220,"correct":22},"假设性问题",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":24,"analysis":33},384744,"项目沟通管理计划的主要内容中不包括（）。",[225,227,229,231],{"key":20,"text":226,"correct":22},"信息的传递方式",{"key":24,"text":228,"correct":32},"项目问题的解决",{"key":27,"text":230,"correct":22},"更新沟通管理计划的方法",{"key":30,"text":232,"correct":22},"项目干系人沟通要求",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":27,"analysis":33},384745,"项目经理老王负责组织内部的一个系统集成项目。因为组织内部的很多人对该系统及其进展感兴趣，他决定准备一份项目沟通管理计划。准备这一计划的第一步是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"建立所有项目文件的信息库以便于快速查找",{"key":24,"text":240,"correct":22},"描述计划分配的信息",{"key":27,"text":242,"correct":32},"进行项目干系人分析以评价对信息的需求",{"key":30,"text":244,"correct":22},"确定一个生产进度来显示什么时间进行什么类型的沟通",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":24,"analysis":33},384746,"某项目经理在与项目干系人的沟通过程中运用了多种沟通方法，有项目日志、项目例会、甲方代表参与的项目会议等，但仍有些关键问题未能与用户达成一致。根据沟通原则，可建议承建单位采用 （ ） 方法。",[249,251,253,255],{"key":20,"text":250,"correct":22},"给用户发送绩效报告",{"key":24,"text":252,"correct":32},"双方高层沟通",{"key":27,"text":254,"correct":22},"提交仲裁",{"key":30,"text":256,"correct":22},"请用户参加娱乐活动",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":27,"analysis":33},384747,"召开会议就某一事项进行讨论是有效的项目沟通方法之一，确保会议成功的措施包括提前确定会议目的、按时开始会议等， （ ） 不是确保会议成功的措施。",[261,263,265,267],{"key":20,"text":262,"correct":22},"项目经理在会议召开前一天，将会议议程通过电子邮件发给参会人员",{"key":24,"text":264,"correct":22},"在技术方案的评审会议中，某专家发言时间超时严重，会议主持人对会议进程进行控制",{"key":27,"text":266,"correct":32},"某系统验收会上，为了避免专家组意见太发散，项目经理要求会议主持人给出结论性意见",{"key":30,"text":268,"correct":22},"项目经理指定文档管理员负责会议记录",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":27,"analysis":33},384748,"某项目的现状是：已经被按照沟通计划发布了项目信息；一些项目可交付物成果发生了变更；这些变更是按照变更控制计划做出的；一位干系人在得知以前曾经公布过的项目可交付物成果变更时，感觉十分惊讶；其余干系人都收到了变更通知的消息。针对这种情况，项目经理应该()",[273,275,277,279],{"key":20,"text":274,"correct":22},"告知干系人信息公布的日期",{"key":24,"text":276,"correct":22},"审核沟通计划，确定为什么干系人不理解自己的职责",{"key":27,"text":278,"correct":32},"对沟通计划进行审核，如需要，对沟通计划进行修改",{"key":30,"text":280,"correct":22},"在下次项目工作会议上说明该问题，以便其他干系人不会遗忘公布的变更信息",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},384749,"对项目干系人管理的主要目标是（）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"调查项目干系人的需求和期望，以了解项目干系人的目标、目的和沟通层次",{"key":24,"text":288,"correct":32},"充分理解项目干系人的需求以便充分与干系人合作，以达到项目的目标",{"key":27,"text":290,"correct":22},"使用沟通管理计划中为每个项目干系人确定的沟通方式讨论、解决问题",{"key":30,"text":292,"correct":22},"促进干系人对项目的理解与支持，使干系人了解项目的进展和有可能带来的影响",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},384750,"在实施某项目时,由于地域限制,必须建立一个虚拟团队,此时制 定( )就显得更加重要。",[297,299,301,303],{"key":20,"text":298,"correct":32},"一个可行的沟通计划",{"key":24,"text":300,"correct":22},"一个可行的风险计划",{"key":27,"text":302,"correct":22},"一个可行的采购计划",{"key":30,"text":304,"correct":22},"一个可行的质量计划",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},384751,"权力\u002F利益方格根据干系人权力的大小,以及利益大小(或项目关 注度)对干系人进行分类, 是干系人分析的方法之一。 对于那些对项 目有很高的权力同时又非常关注项目结果的干系人，项目经理应采取的干系人管理策略是( )。",[309,310,311,312],{"key":20,"text":67,"correct":22},{"key":24,"text":69,"correct":32},{"key":27,"text":65,"correct":22},{"key":30,"text":63,"correct":22},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":30,"analysis":33},384752,"在编制沟通计划时，干系人登记册是沟通计划编制的输入，（ ）不是干系人登记册的内容。",[317,319,321,323],{"key":20,"text":318,"correct":22},"主要沟通对象",{"key":24,"text":320,"correct":22},"关键影响人",{"key":27,"text":322,"correct":22},"次要沟通对象",{"key":30,"text":324,"correct":32},"组织结构与干系人的责任关系",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":20,"analysis":33},384753,"在项目沟通管理过程中存在若干影响因素，其中潜在的技术影响因素包括 （58） 。 ①对信息需求的迫切性 ②资金是否到位 ③预期的项目人员配备 ④项目环境 ⑤项目时间的长短",[329,330,331,332],{"key":20,"text":193,"correct":32},{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":22},{"key":30,"text":93,"correct":22},{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":30,"analysis":33},384754,"项目经理编制了一份项目沟通计划。其主要内容包括项目干系人要求，发布信息的描述、传达信息所需的技术方法和沟通频次。这份计划中还欠缺的最主要内容是 （ ） 。",[337,339,341,343],{"key":20,"text":338,"correct":22},"信息接收的个人和组织",{"key":24,"text":340,"correct":22},"沟通计划检查要求",{"key":27,"text":342,"correct":22},"沟通备忘录",{"key":30,"text":344,"correct":32},"干系人分析",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":30,"analysis":33},384755,"某项目建设方没有聘请监理，承建方项目组在编制采购计划时可包括的内容有（）。①第三方系统测试服务 ②设备租赁③建设方按照进度计划提供的货物④外部聘请的项目培训",[349,351,353,355],{"key":20,"text":350,"correct":22},"①②③",{"key":24,"text":352,"correct":22},"②③④",{"key":27,"text":354,"correct":22},"①③④",{"key":30,"text":356,"correct":32},"①②④",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":27,"analysis":33},384756,"项目沟通管理涉及到项目管理的诸多内容。一般而言，（）不属于项目沟通管理计划的主要内容。",[361,363,365,367],{"key":20,"text":362,"correct":22},"项目干系人沟通需求",{"key":24,"text":364,"correct":22},"传递信息的技术和方法",{"key":27,"text":366,"correct":32},"项目会议频率",{"key":30,"text":368,"correct":22},"通用词语表",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},384757,"小张最近被任命为公司某信息系统开发项目的项目经理，正着手制定沟通管理计划，下列选项中（）属于小张应该采取的主要活动。①找到业主，了解业主的沟通需求②明确文档的结构③确定项目范围 ④明确发送信息的格式",[373,374,375,376],{"key":20,"text":89,"correct":22},{"key":24,"text":356,"correct":32},{"key":27,"text":354,"correct":22},{"key":30,"text":352,"correct":22},{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},384758,"某公司正在计划实施一项用于公司内部的办公自动化系统项目，由于该系统的实施涉及到公司很多内部人员，因此项目经理打算制定一个项目沟通管理计划，他应采取的第一个工作步骤是 ()",[381,383,385,387],{"key":20,"text":382,"correct":22},"设计一份日程表，标记进行每种沟通的时间",{"key":24,"text":384,"correct":32},"分析所有项目干系人的信息需求",{"key":27,"text":386,"correct":22},"构建一个文档库并保存所有的项目文件",{"key":30,"text":388,"correct":22},"描述准备发布的信息",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":30,"analysis":33},384759,"关于项目沟通管理计划编制的叙述，不正确的是（ ）",[393,395,397,399],{"key":20,"text":394,"correct":22},"沟通管理计划编制是确定干系人的信息与沟通需求的过程",{"key":24,"text":396,"correct":22},"沟通管理计划应描述信息收集和文件归档的结构",{"key":27,"text":398,"correct":22},"沟通管理计划中应明确发送信息和重要信息的格式",{"key":30,"text":400,"correct":32},"编制沟通计划的最后一步是项目干系人分析",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":27,"analysis":33},384760,"小张草拟了一份信息系统定制开发合同，其中写明“合同签订后建设单位应在7个工作日内向承建单位支付60%合同款；系统上线并运行稳定后，建设单位应在7个工作日内向承建单位支付30%合同款”。上述条款中存在的主要问题为（）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"格式不符合行业标准的要求",{"key":24,"text":408,"correct":22},"措辞不够书面化",{"key":27,"text":410,"correct":32},"条款描述不清晰、不准确",{"key":30,"text":412,"correct":22},"名词术语不规范",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},384762,"某电信企业要建设一个CRM系统（包括呼叫中心和客服中心），系统集成一级资质企业甲和系统集成二级资质企业乙参与该系统建设。关于合同的签订，下面说法中，()是正确的。",[417,419,421,423],{"key":20,"text":418,"correct":32},"如电信企业和乙签订CRM建设总包合同，则乙和甲就呼叫中心的建设只能签订分包合同",{"key":24,"text":420,"correct":22},"如电信企业和乙签订客服中心建设总包合同，则电信企业和甲就CRM的建设只能签定总价合同",{"key":27,"text":422,"correct":22},"如电信企业和乙签订客服中心建设单项承包合同，则电信企业和甲就CRM的建设只能签定单项承包合同",{"key":30,"text":424,"correct":22},"如电信企业和甲签订CRM建设总价合同，则甲和乙就呼叫中心帕建设只能签订单价合同",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":20,"analysis":33},384763,"某项目在启动阶段难以确定所需要的人员和资源，需要在实施过程中动态增加较多人员、专家和外部资源。在为该项目制订采购计划时需要确定采购合同类型，最适合该项目的合同类型是（）",[429,431,433,435],{"key":20,"text":430,"correct":32},"时间和材料合同",{"key":24,"text":432,"correct":22},"成本加固定酬金合同",{"key":27,"text":434,"correct":22},"成本补偿合同",{"key":30,"text":436,"correct":22},"固定总价合同",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":24,"analysis":33},384764,"按照索赔程序，索赔方要在索赔通知书发出后 （）内，向监理方提出延长工期和(或)补偿经济损失的索赔报告及有关资料。",[441,443,445,447],{"key":20,"text":442,"correct":22},"2 周",{"key":24,"text":444,"correct":32},"28 天",{"key":27,"text":446,"correct":22},"30 天",{"key":30,"text":448,"correct":22},"3 周",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":20,"analysis":33},384765,"某项目在招标时被分成5个标段，分别发包给不同的承包人。承包人中标后与招标人签订的是()",[453,455,457,459],{"key":20,"text":454,"correct":32},"单项项目承包合同",{"key":24,"text":456,"correct":22},"分包合同",{"key":27,"text":458,"correct":22},"单价合同",{"key":30,"text":460,"correct":22},"总承包合同",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},384766,"以下关于项目合同签订的描述中，正确的是 （ ） 。",[465,467,469,471],{"key":20,"text":466,"correct":22},"具有相应民事权力能力的自然人、法人或其他组织均可订立合同",{"key":24,"text":468,"correct":32},"如果合同中对技术支持服务期限未作出任何规定，则认为企业所有的维护要求都要另行付费",{"key":27,"text":470,"correct":22},"对于当事人在订立合同过程中知悉的商业秘密，一旦造成泄密的，必须承担经济损害赔偿",{"key":30,"text":472,"correct":22},"为了避免合同纠纷，当事人必须将签订的合同进行公证，使之获得法律强制执行效力",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},384767,"某信息系统集成项目实施期间，因建设单位指定的系统部署地点所处的大楼进行线路改造，导致项目停工一个月，由于建设单位未提前通知承建单位，导致双方在项目启动阶段协商通过的项目计划无法如期履行。根据我国有关规定，承建单位（）",[477,479,481,483],{"key":20,"text":478,"correct":32},"可申请延长工期补偿，也可申请费用补偿",{"key":24,"text":480,"correct":22},"可申请延长工期补偿，不可申请费用补偿",{"key":27,"text":482,"correct":22},"可申请费用补偿，不可申请延长工期补偿",{"key":30,"text":484,"correct":22},"无法取得补偿",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},384768,"以下关于不同项目合同类型的叙述中,不正确的是:( )。",[489,491,493,495],{"key":20,"text":490,"correct":22},"成本补偿合同也称成本加酬金合同,承包人无成本风险",{"key":24,"text":492,"correct":32},"总价合同又称固定价格合同,适用于工期短、风险大的项目",{"key":27,"text":494,"correct":22},"工时和材料合同又称单价合同,是综合了固定价格合同和成本补偿 合同两者优点的一种合同类型",{"key":30,"text":496,"correct":22},"固定单价合同中合同单价一次性明确,固定不变,即不再因为环境 的变化和工程量的增减而变化",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":30,"analysis":33},384769,"根据合同法规定，（）不属于违约责任的承担方式",[501,503,505,507],{"key":20,"text":502,"correct":22},"继续履行",{"key":24,"text":504,"correct":22},"采取补救措施",{"key":27,"text":506,"correct":22},"支付约定违约金或定金",{"key":30,"text":508,"correct":32},"终止合同",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},384770,"小王为本公司草拟了一份计算机设备采购合同，其中写到“乙方需按通常的行业标准提供技术支持服务”。经理审阅后要求小王修改，原因是 （ ） 。",[513,515,517,519],{"key":20,"text":514,"correct":22},"文字表达不通顺",{"key":24,"text":516,"correct":22},"格式不符合国家或行业标准的要求",{"key":27,"text":518,"correct":32},"对合同标的的描述不够清晰、准确",{"key":30,"text":520,"correct":22},"术语使用不当",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},384771,"按照索赔程序，索赔方要在索赔通知书发出后 （ ） 内，向监理方提出延长工期和（或）补偿经济损失的索赔报告及有关资料。",[525,527,529,531],{"key":20,"text":526,"correct":22},"2周",{"key":24,"text":528,"correct":32},"28天",{"key":27,"text":530,"correct":22},"30天",{"key":30,"text":532,"correct":22},"3周",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},384772,"在信息系统建设中，建设方与承建方的合同可用于 （ ）。① 作为监理工作的基本依据②规定了总监理工程师的职责③ 确定了项目的工期④规定了双方的经济关系⑤ 规定了扣除招标公司费用的比例",[537,538,539,540],{"key":20,"text":350,"correct":22},{"key":24,"text":354,"correct":32},{"key":27,"text":93,"correct":22},{"key":30,"text":87,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":27,"analysis":33},384773,"签订信息系统工程项目合同时有许多注意事项，下列选项中， （ ） 在合同签订时不用考虑。",[545,547,549,551],{"key":20,"text":546,"correct":22},"当事人的法律资格",{"key":24,"text":548,"correct":22},"验收标准",{"key":27,"text":550,"correct":32},"项目管理计划",{"key":30,"text":552,"correct":22},"技术支持服务",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":27,"analysis":33},384774,"项目合同管理不包括（）",[557,559,561,563],{"key":20,"text":558,"correct":22},"合同签订",{"key":24,"text":560,"correct":22},"合同履行",{"key":27,"text":562,"correct":32},"合同纠纷仲裁",{"key":30,"text":564,"correct":22},"合同档案管理",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},384775,"（ ）属于要约。",[569,571,573,575],{"key":20,"text":570,"correct":32},"商场的有奖销售活动",{"key":24,"text":572,"correct":22},"商业广告",{"key":27,"text":574,"correct":22},"寄送的价目表",{"key":30,"text":576,"correct":22},"招标公告",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":27,"analysis":33},384776,"索赔是合同管理的重要环节，甲单位在进行某一工程项目时，于2015年3月1日发生了一项索赔的事项，则需在（ ）提出索赔意向通知。",[581,583,585,587],{"key":20,"text":582,"correct":22},"2015年3月29日前向建设方项目经理",{"key":24,"text":584,"correct":22},"2015年3月31日前向监理工程师",{"key":27,"text":586,"correct":32},"2015年3月29日前向监理工程师",{"key":30,"text":588,"correct":22},"2015年3月31日前向建设方项目经理",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":20,"analysis":33},384777,"某系统集成项目的项目经理需采购第三方软件插件，在编制询价计划时，由于待采购软件插件比较专业，为了更加明确采购需求，该项目经理需要使用的文件为 （ ） 。",[593,595,597,599],{"key":20,"text":594,"correct":32},"供应商意见书",{"key":24,"text":596,"correct":22},"方案邀请书",{"key":27,"text":598,"correct":22},"投标邀请书",{"key":30,"text":600,"correct":22},"报价邀请书",[602,606,609,612,615,618],{"id":603,"name":604,"category":7,"favorite":605},136,"法律职业试卷二(客观题 )",2,{"id":607,"name":608,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":610,"name":611,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":613,"name":614,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":616,"name":617,"category":7,"favorite":8},28,"安全工程师",{"id":619,"name":620,"category":7,"favorite":8},112,"安全生产法律知识"]