[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":582},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,16,50,1397,[13,34,46,58,70,82,94,104,115,127,135,147,159,171,183,195,207,219,231,243,255,267,279,291,303,312,323,335,343,355,363,373,384,393,405,417,429,441,453,465,473,485,494,502,514,526,538,546,558,570],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},384677,1,"单选题","进行团队建设时可以采取的方式有（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","培训、拓展训练，认可和奖励",true,{"key":24,"text":25,"correct":26},"B","冲突管理、观察和对话、绩效评估",false,{"key":28,"text":29,"correct":26},"C","冲突管理、观察帮对话、认可和奖励",{"key":31,"text":32,"correct":26},"D","谈判、采购、虚拟团队","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},384678,"（）不属于编制人力资源计划的工具与技术。",[38,40,42,44],{"key":20,"text":39,"correct":26},"OBS",{"key":24,"text":41,"correct":26},"RAM",{"key":28,"text":43,"correct":26},"RBS",{"key":31,"text":45,"correct":22},"SWOT",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},384679,"一家公司为了满足员工社会交往的需要会经常组织一些聚会和社会活动，还为没有住房的员工提供抵押贷款，这些激励员工的理论基础是（）",[50,52,54,56],{"key":20,"text":51,"correct":26},"期望理论",{"key":24,"text":53,"correct":26},"X 理论和Y 理论",{"key":28,"text":55,"correct":26},"赫茨伯格的双因素理论",{"key":31,"text":57,"correct":22},"马斯洛需要层次理论",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},384680,"项目团队建设对项目的成功至关重要，在项目经理的下述做法中，有可能不利于团队建设的是()",[62,64,66,68],{"key":20,"text":63,"correct":26},"鼓励团队成员间的沟通",{"key":24,"text":65,"correct":22},"奖励加班的成员",{"key":28,"text":67,"correct":26},"尽早建立团队基本规则",{"key":31,"text":69,"correct":26},"尽早发现冲突，利用私下、直接但合法的方式处理",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},384681,"塔库曼的团队建设理论认为，项目团队建设的生命周期中不包括（ ）阶段。",[74,76,78,80],{"key":20,"text":75,"correct":26},"形成（forming）",{"key":24,"text":77,"correct":22},"磨合（running）",{"key":28,"text":79,"correct":26},"震荡（storming）",{"key":31,"text":81,"correct":26},"规范（norming）",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},384682,"项目经理在项目管理时使用了下图，该图是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"责任分配矩阵",{"key":24,"text":89,"correct":26},"沟通计划表",{"key":28,"text":91,"correct":26},"列表式WBS",{"key":31,"text":93,"correct":26},"组织结构分解图",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},384683,"在进行项目团队的激励时，一般不会采用的方法是 （ ） 。",[98,100,101,103],{"key":20,"text":99,"correct":26},"马斯洛的需要层次理论",{"key":24,"text":55,"correct":26},{"key":28,"text":102,"correct":22},"人际网络管理",{"key":31,"text":51,"correct":26},{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":31,"analysis":33},384684,"一个公司的新员工被分配到一个正处在计划编制阶段的项目中工作，她必须决定是否接受分配到这个项目或者要求被分配到另一个不同的项目。但是项目经理没有上班并且也联系不上。项目团队成员可以查看（）以帮助她确认分配的工作。",[108,110,112,114],{"key":20,"text":109,"correct":26},"活动定义",{"key":24,"text":111,"correct":26},"项目计划",{"key":28,"text":113,"correct":26},"工作说明",{"key":31,"text":87,"correct":22},{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":31,"analysis":33},384685,"关于项目管理环境中的冲突管理的叙述中， （ ） 是正确的。",[119,121,123,125],{"key":20,"text":120,"correct":26},"通过建立团队基本规则及实施可行的项目管理经验，冲突是可以避免的",{"key":24,"text":122,"correct":26},"解决冲突最理想方法是求同存异",{"key":28,"text":124,"correct":26},"冲突管理的最终目的是消除意见分歧",{"key":31,"text":126,"correct":22},"不管冲突对项目的影响是正面的还是负面的，项目里都有责任处理它",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},384686,"进行项目团队建设时可以采取的方式有 （ ） 。",[131,132,133,134],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":26},{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":24,"analysis":33},384687,"在项目人力资源计划编制中，一般会涉及到组织结构图和职位描述。其中，根据组织现有的部门、单位或团队进行分解，把工作包和项目的活动列在负责的部门下面的图采用的是 （ ） 。",[139,141,143,145],{"key":20,"text":140,"correct":26},"工作分解结构（WBS）",{"key":24,"text":142,"correct":22},"组织分解结构（OBS）",{"key":28,"text":144,"correct":26},"资源分解结构（RBS）",{"key":31,"text":146,"correct":26},"责任分配矩阵（RAM）",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":24,"analysis":33},384688,"当工作环境、工资薪水、公司政策、人际关系等因素不健全时，人们就会产生不满意感，但即使这些因素很好时，也仅仅可以消除工作中的不满意，却无法增加人们对工作的满意感。这种激励理论是（）。",[151,153,155,157],{"key":20,"text":152,"correct":26},"马斯洛的需求层次理论",{"key":24,"text":154,"correct":22},"赫兹伯格的双因素理论",{"key":28,"text":156,"correct":26},"维克多·弗洛姆",{"key":31,"text":158,"correct":26},"道格拉斯.麦格雷戈的X-Y理论",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":28,"analysis":33},384689,"在组建项目团队时，人力资源要满足项目要求。以下说法， （ ） 是不妥当的。",[163,165,167,169],{"key":20,"text":164,"correct":26},"对关键岗位要有技能标准，人员达标后方可聘用",{"key":24,"text":166,"correct":26},"与技能标准有差距的员工进行培训，合格后可聘用",{"key":28,"text":168,"correct":22},"只要项目经理对团队成员认可就可以",{"key":31,"text":170,"correct":26},"在组建团队时要考虑能力、经验、兴趣、成本等人员因素",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":20,"analysis":33},384690,"项目团队人员转移首先应满足的条件是（）",[175,177,179,181],{"key":20,"text":176,"correct":22},"项目人力资源管理计划中所描述的人员转移条件已触发",{"key":24,"text":178,"correct":26},"项目团队成员所承担的任务已完成，提交了经过确认的可交付物并已完成工作交接",{"key":28,"text":180,"correct":26},"项目经理与项目团队成员确认该成员的工作衔接已经告一段落或者已经完成",{"key":31,"text":182,"correct":26},"项目经理签发项目团队成员转移确认文件",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":20,"analysis":33},384691,"责任分配矩阵式一种常用的描述项目角色和职责的方式，关于责任分配的说法错误的是（）",[187,189,191,193],{"key":20,"text":188,"correct":22},"在反映团队成员个人与其承担的工作时，责任分别配矩阵不够直观",{"key":24,"text":190,"correct":26},"责任分配矩阵可以分成多个层级",{"key":28,"text":192,"correct":26},"高层级的责任分配矩阵可以界定团队中的哪个小组负责工作分解中的哪一部分工作",{"key":31,"text":194,"correct":26},"底层级的责任分配矩阵用来在小组内为具体活动分配角色、职责层次",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":24,"analysis":33},384692,"公司要求项目团队中的成员能够清晰地看到与自己相关的所有活动以及和某个活动相关的所有成员。项目经理在编制该项目人力资源计划时应该选用的组织结构图类型是（）。",[199,201,203,205],{"key":20,"text":200,"correct":26},"层次结构图",{"key":24,"text":202,"correct":22},"矩阵图",{"key":28,"text":204,"correct":26},"树形图",{"key":31,"text":206,"correct":26},"文本格式描述",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":20,"analysis":33},384693,"人员配备管理计划描述何时以及怎样满足人力资源需求。关于人员配备管理计划的叙述中， （ ） 是正确的。",[211,213,215,217],{"key":20,"text":212,"correct":22},"制定人员配备管理计划可采用工作分解结构、组织分解结构和资源分解结构等描述工具",{"key":24,"text":214,"correct":26},"项目人力资源计划可以是正式或非正式的，但人员配备管理计划是不能省略的正式计划",{"key":28,"text":216,"correct":26},"人员配备管理计划通常制订人员需求和人力资源时间安排，不涉及人员培训和奖惩措施",{"key":31,"text":218,"correct":26},"项目人力资源计划是项目人员配备管理计划的一个分计划",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":31,"analysis":33},384694,"某公司刚刚宣布下个月将要裁员，并且极可能包括张工项目团队里的一些成员。团队成员议论纷纷，已无心正常工作。张工告诉团队：“让我们冷静下来，回到工作上去，也许我们下个月的绩效可以保住我们的工作”。此时，张工采取的冲突解决技术是（）。",[223,225,227,229],{"key":20,"text":224,"correct":26},"妥协",{"key":24,"text":226,"correct":26},"强制",{"key":28,"text":228,"correct":26},"安抚",{"key":31,"text":230,"correct":22},"撤退",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":20,"analysis":33},384695,"某项目组的小组长王某和程序员李某在讨论确定一个功能模块的技术解决方案时发生激烈争执，此时作为项目经理应该首先采用 （ ） 的方法来解决这一冲突。",[235,237,239,241],{"key":20,"text":236,"correct":22},"请两人先冷静下来，淡化争议，然后在讨论问题时求同存异",{"key":24,"text":238,"correct":26},"帮助两人分析对错，然后解决问题",{"key":28,"text":240,"correct":26},"要求李某服从小组长王某的意见",{"key":31,"text":242,"correct":26},"请两人把当前问题搁置起来，避免争吵",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":24,"analysis":33},384696,"为了满足员工的归属感需求，某公司经常为新员工组织一些聚会或者社会活动。按照马斯洛的需要层次理论，这属于满足员工的 （ ） 的需求。",[247,249,251,253],{"key":20,"text":248,"correct":26},"安全",{"key":24,"text":250,"correct":22},"社会交往",{"key":28,"text":252,"correct":26},"自尊",{"key":31,"text":254,"correct":26},"自我实现",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":24,"analysis":33},384697,"由于在执行任务时，遇到了超出想象的困难，项目团队成员之间开始争执互相指责，并开始怀疑项目经理的能力。按照项目团队建设的阶段来划分，该阶段属于（）。",[259,261,263,265],{"key":20,"text":260,"correct":26},"形成阶段",{"key":24,"text":262,"correct":22},"震荡阶段",{"key":28,"text":264,"correct":26},"规范阶段",{"key":31,"text":266,"correct":26},"发挥阶段",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":31,"analysis":33},384698,"项目人力资源计划编制完成以后，不能得到的是（）",[271,273,275,277],{"key":20,"text":272,"correct":26},"角色和职责的分配",{"key":24,"text":274,"correct":26},"项目的组织结构图",{"key":28,"text":276,"correct":26},"人员配置管理计划",{"key":31,"text":278,"correct":22},"项目团队成员的人际关系",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":20,"analysis":33},384699,"项目经理管理项目团队有时需要解决冲突，()属于解决冲突的范畴",[283,285,287,289],{"key":20,"text":284,"correct":22},"强制、妥协、撤退",{"key":24,"text":286,"correct":26},"强制、求同存异、观察",{"key":28,"text":288,"correct":26},"妥协、求同存异、增加权威",{"key":31,"text":290,"correct":26},"妥协、撤退、预防",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":28,"analysis":33},384700,"在管理项目团队时，项目经理可以运用 （ ） 等方法来解决冲突。",[295,297,299,301],{"key":20,"text":296,"correct":26},"求同存异、观察、强制",{"key":24,"text":298,"correct":26},"求同存异、妥协、增加权威",{"key":28,"text":300,"correct":22},"强制、问题解决、撤退",{"key":31,"text":302,"correct":26},"强制、妥协、预防",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":24,"analysis":33},384701,"一些公司为了满足公司员工社会交往的需要会经常组织一些聚会和社会活动，还为没有住房的员工提供住处。这种激励员工的理论属于（）。",[307,308,309,310],{"key":20,"text":55,"correct":26},{"key":24,"text":57,"correct":22},{"key":28,"text":51,"correct":26},{"key":31,"text":311,"correct":26},"X理论和Y理论",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":31,"analysis":33},384702,"（ ）是通过考察人们的努力行为与其所获得的最终奖酬之间的因果关系来说明激励过程，并以选择合适的行为达到最终的奖酬目标的理论。",[316,318,320,322],{"key":20,"text":317,"correct":26},"马斯洛需求层次理论",{"key":24,"text":319,"correct":26},"赫茨伯格双因素理论",{"key":28,"text":321,"correct":26},"X 理论和 Y 理论",{"key":31,"text":51,"correct":22},{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":28,"analysis":33},384703,"在当今高科技环境下，为了成功激励一个IT项目团队， 可以被项目经理用来激励项目团队保持气氛活跃、高效率的士气。",[327,329,331,333],{"key":20,"text":328,"correct":26},"期望理论和X理论",{"key":24,"text":330,"correct":26},"Y理论和马斯洛理论",{"key":28,"text":332,"correct":22},"Y理论、期望理论和赫兹伯格的卫生理论",{"key":31,"text":334,"correct":26},"赫兹伯格的卫生理论和期望理论",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":31,"analysis":33},384704,"一般来说，团队发展会经历 5 个阶段。“团队成员之间相互依靠，平稳高效地解决问题，团队成员的集体荣誉感非常强”是（ ）的主要特征。",[339,340,341,342],{"key":20,"text":260,"correct":26},{"key":24,"text":262,"correct":26},{"key":28,"text":264,"correct":26},{"key":31,"text":266,"correct":22},{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":20,"analysis":33},384705,"当需要确保每一个工作包只有一个明确的责任人, 而且每一个 项目团队成员都非常清楚自己的角色和职责时, 应采用的工具和技术是( )。",[347,349,351,353],{"key":20,"text":348,"correct":22},"组织结构图和职位描述",{"key":24,"text":350,"correct":26},"人际交往",{"key":28,"text":352,"correct":26},"组织理论",{"key":31,"text":354,"correct":26},"专家判断",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":31,"analysis":33},384706,"（ ） 不属于编制人力资源计划的工具与技术。",[359,360,361,362],{"key":20,"text":39,"correct":26},{"key":24,"text":41,"correct":26},{"key":28,"text":43,"correct":26},{"key":31,"text":45,"correct":22},{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":20,"analysis":33},384707,"人们对自我的要求是不断提升的，下列理论中， （ ） 将人的需求分为不同等级。",[367,368,369,371],{"key":20,"text":99,"correct":22},{"key":24,"text":55,"correct":26},{"key":28,"text":370,"correct":26},"维克多?弗洛姆的期望理论",{"key":31,"text":372,"correct":26},"道格拉斯?麦格雷戈的X-Y理论",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":20,"analysis":33},384708,"项目经理小李作为某大型项目的负责人，近期发现所处的项目团队中有两名成员因琐事经常发生口角，如果你是小李，应采用 （ ） 最有效的方法来处理这种情况。",[377,379,380,382],{"key":20,"text":378,"correct":22},"解决问题",{"key":24,"text":224,"correct":26},{"key":28,"text":381,"correct":26},"合作",{"key":31,"text":383,"correct":26},"求同存异",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":20,"analysis":33},384709,"在冲突管理中，经常要集合多方观点和意见，得出一个多数人接受和承诺的解决方案。这种冲突管理的方法被称为（）。",[388,389,390,391],{"key":20,"text":381,"correct":22},{"key":24,"text":226,"correct":26},{"key":28,"text":224,"correct":26},{"key":31,"text":392,"correct":26},"回避",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":24,"analysis":33},384710,"信息系统集成项目的技术性很强，是智力密集，劳动密集型项目，必须在人才激励和团队管理的问题上给与足够的重视。（ ）不是造成信息系统项目必须注重团队管理的主要原因",[397,399,401,403],{"key":20,"text":398,"correct":26},"项目成员的机构对系统集成项目的质量有重要的影响",{"key":24,"text":400,"correct":22},"信息系统集成项目通常包括软硬件集成",{"key":28,"text":402,"correct":26},"项目成员的责任心和稳定性对系统集成项目是否成功有决定性的影响。",{"key":31,"text":404,"correct":26},"团队成员专业分工合理",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":24,"analysis":33},384711,"项目团队建设活动的首要目的是提高团队绩效，而很多活动所产生的附属效应也能够提高团队绩效。以下活动中，（）就代表了这种情况。",[409,411,413,415],{"key":20,"text":410,"correct":26},"建立一套以团队为基础的奖励与表彰系统",{"key":24,"text":412,"correct":22},"让非管理层的团队成员参与到项目计划制订过程中",{"key":28,"text":414,"correct":26},"确定团队绩效的目标，并审查达到这些目标的最佳方法",{"key":31,"text":416,"correct":26},"为所有团队成员安排一间大办公室进行集中工作",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":28,"analysis":33},384712,"对于一个新分配来的项目团队成员，()应该负责确保他得到适当的培训。",[421,423,425,427],{"key":20,"text":422,"correct":26},"项目发起人",{"key":24,"text":424,"correct":26},"职能经理",{"key":28,"text":426,"correct":22},"项目经理",{"key":31,"text":428,"correct":26},"培训协调员",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":33},384713,"项目经理管理项目团队有时需要解决冲突， （） 属于解决冲突的范畴。",[433,435,437,439],{"key":20,"text":434,"correct":22},"竞争、合作、回避",{"key":24,"text":436,"correct":26},"强制、问题解决、观察",{"key":28,"text":438,"correct":26},"合作、问题解决、增加权威",{"key":31,"text":440,"correct":26},"合作、竞争、预防",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},384714,"项目人力资源管理计划一般不包括（ ）",[445,447,449,451],{"key":20,"text":446,"correct":26},"项目中的角色和职责",{"key":24,"text":448,"correct":22},"绩效报告",{"key":28,"text":450,"correct":26},"项目组织结构图",{"key":31,"text":452,"correct":26},"人员配备管理计划",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},384715,"下列工具或方法均可用来描述项目组织，以下说法中，不正确的是 （ ） 。",[457,459,461,463],{"key":20,"text":458,"correct":22},"组织分解结构（OBS）与工作分解结构（WBS）形式上相似，是根据项目的交付物进行分解的，把项目的活动和工作包列在负责的部门下面",{"key":24,"text":460,"correct":26},"资源分解结构（RBS）用于分解项目中各类型的资源，除了包含人力资源之外还可以包括各种资源类型，例如材料和设备",{"key":28,"text":462,"correct":26},"工作分解结构（WBS）可以用来确定项目的范围，也可以同来描述不同层次的职责",{"key":31,"text":464,"correct":26},"团队成员职责需要详细描述时，可以采用文档文字形式，详细提供职责、权力、能力和资格等信息",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},384716,"某项目小组的两位技术观感分别提出了一套技术解决方案并因此发生激烈争论。项目经理绝对召开团队会议，让两人进行公开讨论，直到最终选择出一套最佳方案。该项目经理所采用的冲突管理方法是()",[469,470,471,472],{"key":20,"text":378,"correct":22},{"key":24,"text":230,"correct":26},{"key":28,"text":224,"correct":26},{"key":31,"text":381,"correct":26},{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":28,"analysis":33},384717,"项目团队建设的内容一般不包括（ ）",[477,479,481,483],{"key":20,"text":478,"correct":26},"培训",{"key":24,"text":480,"correct":26},"认可和奖励",{"key":28,"text":482,"correct":22},"职责分配",{"key":31,"text":484,"correct":26},"同地办公",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},384718,"在制定人力资源计划时，不适合采用的工具或技术是()",[489,490,491,493],{"key":20,"text":350,"correct":26},{"key":24,"text":352,"correct":26},{"key":28,"text":492,"correct":26},"组织结构图与职位描述",{"key":31,"text":354,"correct":22},{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},384719,"为了满足员工的归属感需要，某公司经常为新员工组织一些聚会或者社会活动，按照马斯洛的需要层次理论，这属于满足员工的（）的需要。",[498,499,500,501],{"key":20,"text":248,"correct":26},{"key":24,"text":250,"correct":22},{"key":28,"text":252,"correct":26},{"key":31,"text":254,"correct":26},{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},384720,"团队建设一般要经历几个阶段，这几个阶段的大致顺序是()",[506,508,510,512],{"key":20,"text":507,"correct":26},"震荡期、形成期、正规期、表现期",{"key":24,"text":509,"correct":26},"形成期、震荡期、表现期、正规期",{"key":28,"text":511,"correct":26},"表现期、震荡期、形成期、正规期",{"key":31,"text":513,"correct":22},"形成期、震荡期、正规期、表现期",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},384721,"一个优秀项目团队的形成，一般需要经历5个阶段，按次序分别是（）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"形成震荡规范 发挥结束",{"key":24,"text":521,"correct":26},"形成发挥震荡规范结束",{"key":28,"text":523,"correct":26},"形成震荡发挥规范结束",{"key":31,"text":525,"correct":26},"形成规范震荡发挥结束",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},384722,"()不是组建项目团队的工具和技术。",[530,532,534,536],{"key":20,"text":531,"correct":26},"事先分派",{"key":24,"text":533,"correct":22},"资源日历",{"key":28,"text":535,"correct":26},"采购",{"key":31,"text":537,"correct":26},"虚拟团队",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},384723,"某项目组的小组长王某和程序员李某在讨论确定一个功能模块的技术解决方案时发生激烈争执，此时作为项目经理应该首先采用()的方法来解决这一冲突",[542,543,544,545],{"key":20,"text":236,"correct":22},{"key":24,"text":238,"correct":26},{"key":28,"text":240,"correct":26},{"key":31,"text":242,"correct":26},{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":28,"analysis":33},384724,"下列关于冲突及其解决方式的描述中，不正确的是()",[550,552,554,556],{"key":20,"text":551,"correct":26},"冲突是自然的团队问题，不是某人的个人问题",{"key":24,"text":553,"correct":26},"冲突的产生原因有项目的高压环境、责任划分不清楚、存在多个上级或者新科技的使用等",{"key":28,"text":555,"correct":22},"冲突的解决方法有合作、强制、妥协等，但不能将冲突搁置起来，从中撤退",{"key":31,"text":557,"correct":26},"冲突应早被发现，利用私下但直接的、合作的方式来处理冲突",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":20,"analysis":33},384725,"一个优秀项目团队的形成，一般需要经历5个阶段，按次序分别是 （ ） 。",[562,564,566,568],{"key":20,"text":563,"correct":22},"形成、震荡、规范、发挥、结束",{"key":24,"text":565,"correct":26},"形成、发挥、震荡、规范、结束",{"key":28,"text":567,"correct":26},"形成、震荡、发挥、规范、结束",{"key":31,"text":569,"correct":26},"形成、规范、震荡、发挥、结束",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},384726,"一个五人组成的项目团队已经进入到了项目团队的正规期，但是由于项目任务较紧张，又增添了两名新成员进入团队，则此时项目团队处于 （ ） 。",[574,576,578,580],{"key":20,"text":575,"correct":26},"震荡期",{"key":24,"text":577,"correct":22},"形成期",{"key":28,"text":579,"correct":26},"表现期",{"key":31,"text":581,"correct":26},"正规期",[583,587,590,593,596,599],{"id":584,"name":585,"category":7,"favorite":586},136,"法律职业试卷二(客观题 )",2,{"id":588,"name":589,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":591,"name":592,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":594,"name":595,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":597,"name":598,"category":7,"favorite":8},28,"安全工程师",{"id":600,"name":601,"category":7,"favorite":8},112,"安全生产法律知识"]