[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":559},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,15,50,1397,[13,34,46,58,68,80,92,104,116,127,139,148,160,168,179,191,201,210,222,233,243,253,265,275,286,296,308,318,330,341,353,365,374,386,395,404,416,428,440,451,459,471,483,495,506,516,525,533,543,551],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},384626,1,"单选题","在制定项目质量计划中， （ ） 运用统计方法帮助项目确定影响特定变量的因素，经常用于项目产品的分析",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","基准比较",false,{"key":24,"text":25,"correct":22},"B","质量成本分析",{"key":27,"text":28,"correct":22},"C","流程图",{"key":30,"text":31,"correct":32},"D","实验设计",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},384627,"某公司的质量目标是每千行代码缺陷数不大于2.5个，项目组为确保目标的达成，并能对软件开发项目组5个代码编写人员各自的质量进行趋势分析，适合质量工具是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"散点图",{"key":24,"text":41,"correct":22},"矩阵图",{"key":27,"text":43,"correct":32},"控制图",{"key":30,"text":45,"correct":22},"亲和图",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},384628,"一个项目经理和他的团队正在使用鱼骨图(Ishikawa图)讨论所发现的一个重大质量问题的原因，这属于质量管理中的()",[50,52,54,56],{"key":20,"text":51,"correct":22},"质量计划编制",{"key":24,"text":53,"correct":22},"质量工具",{"key":27,"text":55,"correct":22},"质量保证",{"key":30,"text":57,"correct":32},"质量控制",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},384629,"甲公司承担的某系统开发项目，在进入开发阶段后，出现了一系列质量问题。为此，项目经理召集项目团队，列出问题，并分析问题产生的原因。结果发现，绝大多数的问题都是由几个原因造成的，项目组有针对性地采取了一些措施。这种方法属于（）法。",[62,64,65,67],{"key":20,"text":63,"correct":22},"因果图",{"key":24,"text":43,"correct":22},{"key":27,"text":66,"correct":32},"排列图",{"key":30,"text":41,"correct":22},{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":27,"analysis":33},384630,"以下关于项目质量保证和项目质量控制的描述，错误的是（ ）。",[72,74,76,78],{"key":20,"text":73,"correct":22},"质量计划是质量控制与质量保证的共同依据",{"key":24,"text":75,"correct":22},"达到质量要求是质量控制与质量保证的共同目标",{"key":27,"text":77,"correct":32},"一定时间内质量保证的结果也是质量控制的审计对象",{"key":30,"text":79,"correct":22},"项目管理班子和组织的管理层应关注项目质量保证的结果",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":24,"analysis":33},384631,"单位在项目执行过程中，由于质量管理方面的问题造成了局部范围的返工，单位失去了承建另外一个项目的机会，这属于 （ ） 。",[84,86,88,90],{"key":20,"text":85,"correct":22},"质量成本",{"key":24,"text":87,"correct":32},"机会成本",{"key":27,"text":89,"correct":22},"时间成本",{"key":30,"text":91,"correct":22},"无形成本",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":27,"analysis":33},384632,"项目的质量保证不包括 （ ）。",[96,98,100,102],{"key":20,"text":97,"correct":22},"产品的质量保证",{"key":24,"text":99,"correct":22},"系统的质量保证",{"key":27,"text":101,"correct":32},"人员的质量保证",{"key":30,"text":103,"correct":22},"服务的质量保证",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},384633,"下图是质量控制中常用到的 SIPOC 模型，数字 1、2 部分代表的模型内容为（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"建设方 承建方",{"key":24,"text":111,"correct":32},"供应商 客户",{"key":27,"text":113,"correct":22},"买方 卖方",{"key":30,"text":115,"correct":22},"生产者 消费者",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":27,"analysis":33},384634,"在质量规划中， （ ） 是一种统计分析技术，可用来帮助人们识别并找出哪些变量对项目结果的影响最大。",[120,122,124,125],{"key":20,"text":121,"correct":22},"成本\u002F效益分析",{"key":24,"text":123,"correct":22},"标杆对照",{"key":27,"text":31,"correct":32},{"key":30,"text":126,"correct":22},"质量审计",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":27,"analysis":33},384635,"以下关于软件质量保证和质量评价的描述中，不正确的是()",[131,133,135,137],{"key":20,"text":132,"correct":22},"软件质量保证过程通过计划制定、实施和完成一组活动提供保证，这些活动保证项目生命周期中的软件产品和过程符合其规定的需求",{"key":24,"text":134,"correct":22},"验证和确认过程确定某一开发和维护活动的产品是否符合活动需求，最终的产品是否满足用户需求",{"key":27,"text":136,"correct":32},"检查的目的是评价软件产品，以确定其对使用意图的适合性，目的是识别规范说明与标准的差异，并向管理提供证据",{"key":30,"text":138,"correct":22},"软件审计的目的是提供软件产品和过程对于应用的规则、标准、指南、计划和流程的遵从性的独立评价",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":27,"analysis":33},384636,"在项目管理中经常需要在成本与进度之间做出 权衡，尽管聘用高级程序员的花费要比初级程序员高得多，却可以获得更高的生产效率。如果项目经理在编制项目质量计划时，希望确定聘用高级程序员和初级程序 员的最佳人数比例，同时还要明确质量标准以及达到标准的最佳方法，最适合采用的方法是()",[143,144,146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":145,"correct":22},"效益\u002F成本分析",{"key":27,"text":31,"correct":32},{"key":30,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":20,"analysis":33},384637,"项目的质量保证不包括人员的质量保证采用的方法和技术不包括（）.",[152,154,156,158],{"key":20,"text":153,"correct":32},"确定质量目标",{"key":24,"text":155,"correct":22},"确定保证范围的等级",{"key":27,"text":157,"correct":22},"质量检验",{"key":30,"text":159,"correct":22},"制定质量保证规划",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":30,"analysis":33},384638,"在制定项目质量计划中，（）运用统计方法帮助项目确定影响特定变量的因素，经常用于项目产品的分析。",[164,165,166,167],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":32},{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":30,"analysis":33},384639,"()不是进行项目质量保证采用的方法和技术。",[172,173,175,177],{"key":20,"text":159,"correct":22},{"key":24,"text":174,"correct":22},"质量活动分解",{"key":27,"text":176,"correct":22},"建立质量保证体系",{"key":30,"text":178,"correct":32},"统计抽样",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":30,"analysis":33},384640,"甲公司最近中标某市应急指挥系统建设，为保证项目质量，项目经理在明确系统功能和性能的过程中，以本省应急指挥系统为标杆，定期将该项目的功能和性能与之比较。这种方法属于 （ ） 。",[183,185,187,189],{"key":20,"text":184,"correct":22},"实验设计法",{"key":24,"text":186,"correct":22},"相互关系图法",{"key":27,"text":188,"correct":22},"优先矩阵图法",{"key":30,"text":190,"correct":32},"基准比较法",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":20,"analysis":33},384641,"下列选项中，不属于质量控制工具的是 （ ） 。",[195,197,199,200],{"key":20,"text":196,"correct":32},"甘特图",{"key":24,"text":198,"correct":22},"趋势分析",{"key":27,"text":43,"correct":22},{"key":30,"text":63,"correct":22},{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},384642,"为了实现项目质量控制，经常用到各种图形工具，下面是 （ ） 。",[205,206,207,209],{"key":20,"text":63,"correct":22},{"key":24,"text":28,"correct":32},{"key":27,"text":208,"correct":22},"直方图",{"key":30,"text":43,"correct":22},{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":30,"analysis":33},384643,"项目质量保证活动的参与者应为（ ）",[214,216,218,220],{"key":20,"text":215,"correct":22},"项目经理",{"key":24,"text":217,"correct":22},"负责执行项目的管理层",{"key":27,"text":219,"correct":22},"负责项目执行的一线工作人员",{"key":30,"text":221,"correct":32},"全体工作人员",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":30,"analysis":33},384644,"项目具体结果包括项目的最终产品和服务，也包括项目过程中的结果。项目过程结果的质量需要由 （ ） 进行控制。",[226,228,230,231],{"key":20,"text":227,"correct":22},"质量控制职能部门",{"key":24,"text":229,"correct":22},"质检员",{"key":27,"text":215,"correct":22},{"key":30,"text":232,"correct":32},"项目管理组织的成员",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":30,"analysis":33},384645,"在质量管理中,( )可以识别造成大多数问题的少数重要原因。",[237,238,239,241],{"key":20,"text":208,"correct":22},{"key":24,"text":43,"correct":22},{"key":27,"text":240,"correct":22},"核査表",{"key":30,"text":242,"correct":32},"帕累托图",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":30,"analysis":33},384646,"（）一般不是用于质量控制的方法和技术。",[247,248,250,251],{"key":20,"text":198,"correct":22},{"key":24,"text":249,"correct":22},"检验",{"key":27,"text":43,"correct":22},{"key":30,"text":252,"correct":32},"制定参数基准",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":24,"analysis":33},384647,"项目质量保证(Q A)的目的是（ ）。",[257,259,261,263],{"key":20,"text":258,"correct":22},"致力于满足项目施工需求的能力",{"key":24,"text":260,"correct":32},"致力于提供质量要求得到满意的信任",{"key":27,"text":262,"correct":22},"致力于满足质量要求",{"key":30,"text":264,"correct":22},"制定质量目标、规定过程和资源，以实现其目的",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":20,"analysis":33},384648,"某系统集成公司制订了一系列完备的质量管理制度，其中一项是要求每个项目在各个阶段的最后都必须进行质量审计。这种审计活动是（）过程的一部分工作。",[269,270,272,273],{"key":20,"text":55,"correct":32},{"key":24,"text":271,"correct":22},"质量改进",{"key":27,"text":57,"correct":22},{"key":30,"text":274,"correct":22},"质量计划",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":30,"analysis":33},384649,"质量管理体系文件包括质量手册、程序文件和 （ ）。",[279,280,282,284],{"key":20,"text":274,"correct":22},{"key":24,"text":281,"correct":22},"质量目标",{"key":27,"text":283,"correct":22},"质量方针",{"key":30,"text":285,"correct":32},"质量记录",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},384650,"某项目质量管理员希望采用一些有助于分析问题发生原因的工具来帮助项目组对各出现的质量问题进行预测并制订应对措施，以下工具中，能够满足其需要的是()",[290,291,292,294],{"key":20,"text":43,"correct":22},{"key":24,"text":28,"correct":32},{"key":27,"text":293,"correct":22},"树形图",{"key":30,"text":295,"correct":22},"活动网络图",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},384651,"以下有关质量保证的叙述，错误的是 （ ） 。",[300,302,304,306],{"key":20,"text":301,"correct":32},"质量保证主要任务是识别与项目相关的各种质量标准",{"key":24,"text":303,"correct":22},"质量保证应该贯穿整个项目生命期",{"key":27,"text":305,"correct":22},"质量保证给质量的持续改进过程提供保证",{"key":30,"text":307,"correct":22},"质量审计是质量保证的有效手段",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":27,"analysis":33},384652,"项目经理在制定项目质量计划时，从客户对项目交付物的质量要求出发，先识别客户在功能方面的要求，然后把功能要求与产品的特性对应起来，形成功能要求与产品特性的关系矩阵，进而确定产品的技术参数。他采用的方法是()",[312,313,314,316],{"key":20,"text":25,"correct":22},{"key":24,"text":145,"correct":22},{"key":27,"text":315,"correct":32},"质量功能展开",{"key":30,"text":317,"correct":22},"过程决策程序图法",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":27,"analysis":33},384653,"控制图中的控制上限和控制下限标明()",[322,324,326,328],{"key":20,"text":323,"correct":22},"客户将要接受的界限",{"key":24,"text":325,"correct":22},"可能出现的过程的偏差范围",{"key":27,"text":327,"correct":32},"可以接受的过程的偏差范围",{"key":30,"text":329,"correct":22},"判断项目成败的统计控制点",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":27,"analysis":33},384654,"质量保证是项目管理中非常重要的活动，质量保证除了为项目提供支持外，还为（ ） 创造了条件。",[334,336,338,339],{"key":20,"text":335,"correct":22},"产品改进",{"key":24,"text":337,"correct":22},"过程改进",{"key":27,"text":57,"correct":32},{"key":30,"text":340,"correct":22},"成本控制",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":20,"analysis":33},384655,"在某信息化项目建设过程中，客户对于最终的交付物不认可，给出的原因是系统信号强度超过用户设备能接受的上限。请问在项目执行过程中，如果客户对于项目文 件中的验收标准无异议，则可能是①环节出了问题；如果客户对于项目文件中的验收标准有异议，而项目内所有工作流程均无问题，则可能是②环节出了问题。上述 ①和②依次序应该填入（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":32},"质量控制、范围确认",{"key":24,"text":348,"correct":22},"质量保证、变更控制",{"key":27,"text":350,"correct":22},"WBS分解过程、质量控制",{"key":30,"text":352,"correct":22},"范围确认、WBS分解过程",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},384656,"质暈管理六西格玛标准的优越之处不包括（）",[357,359,361,363],{"key":20,"text":358,"correct":32},"从结果中检验控制质量",{"key":24,"text":360,"correct":22},"减少了检控质量的步骤",{"key":27,"text":362,"correct":22},"培养了员工的质量意识",{"key":30,"text":364,"correct":22},"减少了由于质量问题带来的返工成本",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":30,"analysis":33},384657,"在制定项目质量计划时对实现既定目标的过程加以全面分析，估计到各种可能出现的障碍及结果，设想并制定相应的应变措施和应变计划，保持计划的灵活性。这种方法属于（）。",[369,371,372,373],{"key":20,"text":370,"correct":22},"流程图法",{"key":24,"text":184,"correct":22},{"key":27,"text":315,"correct":22},{"key":30,"text":317,"correct":32},{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},384658,"为保证项目的质量，要对项目进行质量管理，项目质量管理过程的第一步是（）",[378,380,382,384],{"key":20,"text":379,"correct":32},"制定项目质量计划",{"key":24,"text":381,"correct":22},"确立质量标准体系",{"key":27,"text":383,"correct":22},"对项目实施质量监控",{"key":30,"text":385,"correct":22},"将实际与标准对照",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":30,"analysis":33},384659,"质量计划的工具和技术不包括 （ ） 。",[390,392,393,394],{"key":20,"text":391,"correct":22},"成本分析",{"key":24,"text":123,"correct":22},{"key":27,"text":85,"correct":22},{"key":30,"text":126,"correct":32},{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":24,"analysis":33},384660,"某项目质量管理员希望采用一些有助于分析问题发生原因的工具，来帮助项目组对各 （ ） 出现的质量问题进行预测并制订应对措施。以下工具中，能够满足其需要的是B。",[399,400,401,403],{"key":20,"text":43,"correct":22},{"key":24,"text":28,"correct":32},{"key":27,"text":402,"correct":22},"树状图",{"key":30,"text":295,"correct":22},{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":27,"analysis":33},384661,"项目质量管理包括制定质量管理计划、质量保证、质量控制，其中质量控制一般在项目管理过程组的（ ）中进行。",[408,410,412,414],{"key":20,"text":409,"correct":22},"启动过程组",{"key":24,"text":411,"correct":22},"执行过程组",{"key":27,"text":413,"correct":32},"监督和控制过程组",{"key":30,"text":415,"correct":22},"收尾过程组",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":27,"analysis":33},384662,"某公司对本单位负责的信息系统集成项目实施失败原因进行分析后，发现约80%的原因都是用户需求不明确、授权不清晰、以及采用了不适宜的技术，而其他十几种原因造成的失败较少。根据这些分析结果，该公司所采用项目质量控制的方法是（）",[420,422,424,426],{"key":20,"text":421,"correct":22},"散点图法",{"key":24,"text":423,"correct":22},"直方图法",{"key":27,"text":425,"correct":32},"帕累托法",{"key":30,"text":427,"correct":22},"控制图法",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":27,"analysis":33},384663,"在某操作系统中，47%的错误时由该系统4%的程序模块产生的，该现象（）特征。",[432,434,436,438],{"key":20,"text":433,"correct":22},"蒙特卡洛",{"key":24,"text":435,"correct":22},"大数定律",{"key":27,"text":437,"correct":32},"帕累托定律",{"key":30,"text":439,"correct":22},"PDP",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},384664,"过程改进计划详细说明了对项目管理过程和产品开发过程进行分析的各个步骤，有助于识别增值活动。在项目管理知识领域，过程改进计划产生于（ ）阶段。",[444,446,448,450],{"key":20,"text":445,"correct":32},"质量规划",{"key":24,"text":447,"correct":22},"实施质量保证",{"key":27,"text":449,"correct":22},"控制质量",{"key":30,"text":271,"correct":22},{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":30,"analysis":33},384665,"质量管理体系文件包括质量手册、程序文件和()。",[455,456,457,458],{"key":20,"text":274,"correct":22},{"key":24,"text":281,"correct":22},{"key":27,"text":283,"correct":22},{"key":30,"text":285,"correct":32},{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":27,"analysis":33},384666,"排列图（帕累托图）可以用来进行质量控制是因为 （ ） 。",[463,465,467,469],{"key":20,"text":464,"correct":22},"它按缺陷的数量多少画出一条曲线，反映了缺陷的变化趋势",{"key":24,"text":466,"correct":22},"它将缺陷数量从大到小进行了排列，是人们关注数量最多的缺陷",{"key":27,"text":468,"correct":32},"它将引起缺陷的原因从大到小排列，项目团队应关注造成最多缺陷的原因",{"key":30,"text":470,"correct":22},"它反映了按时间顺序抽取的样本的数值点，能够清晰地看出过程实现的状态",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":24,"analysis":33},384667,"承建方项目经理向监理方提交正式审核所用的项目管理计划。其中必须包括 （ ） 。",[475,477,479,481],{"key":20,"text":476,"correct":22},"范围管理计划",{"key":24,"text":478,"correct":32},"质量管理计划",{"key":27,"text":480,"correct":22},"人力资源管理计划",{"key":30,"text":482,"correct":22},"成本管理计划",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":27,"analysis":33},384668,"关于项目质量审计的叙述中，（ ）是不正确的。",[487,489,491,493],{"key":20,"text":488,"correct":22},"质量审计是对其他质量管理活动的结构化和独立的评审方法",{"key":24,"text":490,"correct":22},"质量审计可以内部完成，也可以委托第三方完成",{"key":27,"text":492,"correct":32},"质量审计应该是预先计划的，不应该是随机的",{"key":30,"text":494,"correct":22},"质量审计用于判断项目活动是否遵从于项目定义的过程",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},384669,"以下关于质量保证的叙述中，不正确的是（ ）。",[499,500,502,504],{"key":20,"text":303,"correct":22},{"key":24,"text":501,"correct":32},"质量保证活动属于监控过程组",{"key":27,"text":503,"correct":22},"质量保证是对质量规划和质量控制过程的质量控制，可分为内部质量控制和外部质量控制",{"key":30,"text":505,"correct":22},"质量保证决定了项目质量控制的结果",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},384670,"为了识别项目中使用的无效和低效政策、过程和程序，可以采用（）方法。",[510,512,513,514],{"key":20,"text":511,"correct":22},"检查",{"key":24,"text":126,"correct":32},{"key":27,"text":123,"correct":22},{"key":30,"text":515,"correct":22},"过程分析",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":30,"analysis":33},384672,"在进行项目质量控制时，统计方法强调一切用资料说话，而（）则主要用事实说话，靠“灵感”发现新思想、解决新问题。",[520,521,522,524],{"key":20,"text":242,"correct":22},{"key":24,"text":293,"correct":22},{"key":27,"text":523,"correct":22},"相互关系图",{"key":30,"text":45,"correct":32},{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":20,"analysis":33},384673,"项目质量保证采用的方法和技术不包括 （ ） 。",[529,530,531,532],{"key":20,"text":153,"correct":32},{"key":24,"text":155,"correct":22},{"key":27,"text":157,"correct":22},{"key":30,"text":159,"correct":22},{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":30,"analysis":33},384674,"（ ）是对其他质量管理活动的结构化和独立的评审方法，用于判断项目活动的执行是否遵从于组织及项目定义的方针、过程和规程。",[537,539,540,542],{"key":20,"text":538,"correct":22},"绩效衡量",{"key":24,"text":157,"correct":22},{"key":27,"text":541,"correct":22},"风险审计",{"key":30,"text":126,"correct":32},{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":30,"analysis":33},384675,"下图所表示的质量控制工具为 （ ） 。",[547,548,549,550],{"key":20,"text":421,"correct":22},{"key":24,"text":63,"correct":22},{"key":27,"text":242,"correct":22},{"key":30,"text":43,"correct":32},{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":30,"analysis":33},384676,"（ ） 不是进行项目质量保证采用的方法和技术。",[555,556,557,558],{"key":20,"text":159,"correct":22},{"key":24,"text":174,"correct":22},{"key":27,"text":176,"correct":22},{"key":30,"text":178,"correct":32},[560,564,567,570,573,576],{"id":561,"name":562,"category":7,"favorite":563},136,"法律职业试卷二(客观题 )",2,{"id":565,"name":566,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":568,"name":569,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":571,"name":572,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":574,"name":575,"category":7,"favorite":8},28,"安全工程师",{"id":577,"name":578,"category":7,"favorite":8},112,"安全生产法律知识"]