[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":594},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,14,50,1397,[13,34,46,58,70,82,91,102,114,122,130,142,154,166,178,186,198,210,222,234,246,254,266,278,290,302,314,326,338,350,362,374,386,396,407,419,431,443,455,467,479,487,499,511,523,535,547,558,570,582],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},384576,1,"单选题","某项目经理正在负责某政府的一个大项目，采用自下而上的估算方法进行成本估算，一般而言，项目经理首先应该（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","确定一种计算机化的工具，帮助其实现这个过程",false,{"key":24,"text":25,"correct":22},"B","利用以前的项目成本估算来帮助其实现",{"key":27,"text":28,"correct":29},"C","识别并估算每一个工作包或细节最详细的活动成本",true,{"key":31,"text":32,"correct":22},"D","向这个方向的专家咨询，并将他们的建议作为估算基础","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},384577,"某项目经理在进行成本估算时采用 （ ） 方法，制定出如下的人力资源成本估算表。",[38,40,42,44],{"key":20,"text":39,"correct":22},"类比估算",{"key":24,"text":41,"correct":22},"自下而上的估算",{"key":27,"text":43,"correct":29},"参数估算",{"key":31,"text":45,"correct":22},"成本汇总",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},384578,"WBS 工作包中一般不包括的成本是 （） 。",[50,52,54,56],{"key":20,"text":51,"correct":29},"管理成本",{"key":24,"text":53,"correct":22},"设备采购成本",{"key":27,"text":55,"correct":22},"项目人员成本",{"key":31,"text":57,"correct":22},"直接成本",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},384579,"如果挣值EV是300万元，实际成本AC是350万元，计划值PV是375万元。进度执行指数显示 （ ） 。",[62,64,66,68],{"key":20,"text":63,"correct":22},"仅以原始计划速率的86%进行项目",{"key":24,"text":65,"correct":22},"正在以原始计划速率的93%进行项目",{"key":27,"text":67,"correct":22},"正在以原始计划速率的107%进行项目",{"key":31,"text":69,"correct":29},"仅以原始计划速率的80%进行项目",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},384580,"在管理项目及投资决策过程中, 需要考虑很多成本因差, 比如人 员的工资、项目过程中需要的物料、设备等,但是在投资决策的时候我们不需要考虑( )，还应尽量排除它的干扰 。",[74,76,78,80],{"key":20,"text":75,"correct":22},"机会成本",{"key":24,"text":77,"correct":29},"沉没成本",{"key":27,"text":79,"correct":22},"可变成本",{"key":31,"text":81,"correct":22},"间接成本",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},384581,"每次项目投标，都需要向招标方交纳一定比例的押金，由此产生的费用属于（）",[86,88,89,90],{"key":20,"text":87,"correct":22},"固定成本",{"key":24,"text":57,"correct":22},{"key":27,"text":75,"correct":22},{"key":31,"text":81,"correct":29},{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":31,"analysis":33},384582,"项目经理创建了某软件开发项目的WBS工作包，其中一个工作包举例如下：130（注：工作包编号，下同）需求阶段；131需求调研；132需求分析；133需求定义。通过成本估算，131预计花费3万元；132预计花费2万元；133预计花费2.5万元。根据各工作包的成本估算，采用（）方法，能最终形成整个项目的预算。",[95,97,99,101],{"key":20,"text":96,"correct":22},"资金限制平衡",{"key":24,"text":98,"correct":22},"准备金分析",{"key":27,"text":100,"correct":22},"成本参数估算",{"key":31,"text":45,"correct":29},{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":27,"analysis":33},384583,"下图是某项目成本风险的蒙特卡罗分析图。以下说法中不正确的是 （ ）",[106,108,110,112],{"key":20,"text":107,"correct":22},"蒙特卡罗分析法也叫随机模拟法",{"key":24,"text":109,"correct":22},"该图用于风险分析时，可以支持定量分析",{"key":27,"text":111,"correct":29},"根据该图，41万元完成的概率是12%，如果要达到75%的概率，需要增加5.57万元作为应急储备",{"key":31,"text":113,"correct":22},"该图显示，用45万元的成本也可能完成计划",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":20,"analysis":33},384584,"企业为某客户实施电子商务平台建设项目，需要采购5台交付给客户使用服务器，这部分成本属于该项目的()",[118,119,120,121],{"key":20,"text":57,"correct":29},{"key":24,"text":81,"correct":22},{"key":27,"text":87,"correct":22},{"key":31,"text":75,"correct":22},{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":24,"analysis":33},384585,"某单位规定对所有承担的项目全部按其报价的15%提出公司管理费，该项费用对于项目而言属于()",[126,127,128,129],{"key":20,"text":57,"correct":22},{"key":24,"text":81,"correct":29},{"key":27,"text":87,"correct":22},{"key":31,"text":79,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},384586,"某项目经理已经完成了WBS和每个工作包的成本估算。要根据这些数据编制项目成本估算，该项目经理要()",[134,136,138,140],{"key":20,"text":135,"correct":22},"使用WBS的最高层次进行类比估算",{"key":24,"text":137,"correct":29},"计算工作包和风险储备估算的总和",{"key":27,"text":139,"correct":22},"把工作包估算累计成为项目估算总和",{"key":31,"text":141,"correct":22},"获得专家对项目成本总计划意见",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},384587,"某土方工程总挖方量为4000立方米。预算单价为45元\u002F立方米。计划用10天完成，每天400立方米。开工后第7天早晨刚上班时业主项目管理人员前去测量，取得了两个数据；已完成挖方2000立方米，支付给承包单位的工程进度款累计已支付120000元，那么此时项目CPI和SPI分别为（）",[146,148,150,152],{"key":20,"text":147,"correct":22},"CPI=0.75： SP1=0.75",{"key":24,"text":149,"correct":22},"CPI=0.83： SPI=0.83",{"key":27,"text":151,"correct":29},"CPI=0.75： SPI=0.83",{"key":31,"text":153,"correct":22},"CPI=0.83: SPIU=0.75",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},384588,"控制图中的控制上限和控制下限标明 （ ） 。",[158,160,162,164],{"key":20,"text":159,"correct":22},"客户将要接受的界限",{"key":24,"text":161,"correct":22},"可能出现的过程的偏差",{"key":27,"text":163,"correct":29},"可以接受的过程的偏差范围",{"key":31,"text":165,"correct":22},"判断项目成败的统计控制点",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},384589,"某信息化施工项目一共要进行30天，预算总成本60万元，其中5万元为管理成本，40万元为物料使用费，其余为人工成本。按照管理计划，每5天进行一次挣值分析以评价项目绩效。在第5天绩效评价时计算得到CPI（绩效评价指数）为0.95，则说明在前5天的施工中，实际成本①预算成本；如果要使下一次绩效评价时CPI为1，且人工、物料使用成本不能改变，以免影响施工质量，则在这两次绩效评价间，每天平均可花费的管理成本为②元。上述①和②依次序应该填写()（假设所有成本按照天数平均分配，工程进度不存在延时或提前情况）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"①低于②614元",{"key":24,"text":173,"correct":29},"①高于②614元",{"key":27,"text":175,"correct":22},"①低于②1052元",{"key":31,"text":177,"correct":22},"①高于②1052元",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},384590,"企业的保安费用对于项目而言属于（）",[182,183,184,185],{"key":20,"text":79,"correct":22},{"key":24,"text":87,"correct":22},{"key":27,"text":81,"correct":29},{"key":31,"text":57,"correct":22},{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},384591,"（）不是系统集成项目的直接成本",[190,192,194,196],{"key":20,"text":191,"correct":22},"进口设备报关费",{"key":24,"text":193,"correct":22},"第三方测试费用",{"key":27,"text":195,"correct":22},"差旅费",{"key":31,"text":197,"correct":29},"员工福利",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},384592,"一般情况下，随着项目的逐渐进展，成本和人员投入水平呈现出①的态势，而项目干系人对于项目最终产品的特征和项目最终费用的影响会②，变更和缺陷修改的费用通常会③。①、②和③分别是 （ ） 。",[202,204,206,208],{"key":20,"text":203,"correct":29},"①先增后减，②逐渐减小，③逐渐增加",{"key":24,"text":205,"correct":22},"①先减后增，②逐渐增加，③逐渐减少",{"key":27,"text":207,"correct":22},"①先增后减，②逐渐增加，③逐渐增加",{"key":31,"text":209,"correct":22},"①先减后增，②逐渐减少，③逐渐减少",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":27,"analysis":33},384593,"自下而上估算方法是指估算单个工作包或细节详细活动的成本，然后简写详细的成本汇总到更高层级估算的方法，下面关于该方法的描述中（）是错误的。",[214,216,218,220],{"key":20,"text":215,"correct":22},"其精确性取决于估算对象的规模和复杂程度",{"key":24,"text":217,"correct":22},"便于报告和跟踪",{"key":27,"text":219,"correct":29},"适于对项目情况了解较少时采用",{"key":31,"text":221,"correct":22},"该估算方法的准确性通常高于其他估算方法",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},384594,"项目经理在制定项目成本预算时采取以下步骤：①估算项目的总成本；②将项目的总成本分解到WBS工作包；③将各个工作包成本再分解到相关活动；④公司对预算草案进行审批围绕该步骤，下列说法中，（）是正确的",[226,228,230,232],{"key":20,"text":227,"correct":22},"项目经理不应该将各个工作包成本再分解到相关活动",{"key":24,"text":229,"correct":22},"项目经理采用至上而下分解成本的方法是不对的，应该直接对工作包进行估算",{"key":27,"text":231,"correct":29},"该流程中缺乏成本预算支出的时间计划",{"key":31,"text":233,"correct":22},"预算由项目经理批准即可，不必公司批准",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},384595,"根据以下布线计划及完成进度表，在2010年6月2日完工后对工程进度和费用进行预测，按此进度，完成尚需估算（ET C）为 （ ） 。",[238,240,242,244],{"key":20,"text":239,"correct":22},"18 000元",{"key":24,"text":241,"correct":29},"36 000元",{"key":27,"text":243,"correct":22},"20 000元",{"key":31,"text":245,"correct":22},"54 000元",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":27,"analysis":33},384596,"某项目经理正在负责某政府的一个大项目，采用自下而上的估算方法进行成本估算，一般而言，项目经理首先应该（）",[250,251,252,253],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":32,"correct":22},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":27,"analysis":33},384597,"某公司有一个项目，发生的财包括： 1. 项目团队人员工作50万元 2. 项目团队差旅费10万元 3. 项目税金10万元 4. 项目分摊公司保卫费5万元 5. 项目物料及设备使用费20万元 其中直接成本包括（ ）",[258,260,262,264],{"key":20,"text":259,"correct":22},"12345",{"key":24,"text":261,"correct":22},"123",{"key":27,"text":263,"correct":29},"125",{"key":31,"text":265,"correct":22},"1324",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":20,"analysis":33},384598,"在某项目进行的第三个月，累计计划费用是25万元人民币，而实际支出为28万元，以下关于这个项目进展的叙述，正确的是（）。",[270,272,274,276],{"key":20,"text":271,"correct":29},"提供的信息不全，无法评估",{"key":24,"text":273,"correct":22},"由于成本超支，项目面临困难",{"key":27,"text":275,"correct":22},"项目将在原预算内完成",{"key":31,"text":277,"correct":22},"项目计划提前",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":31,"analysis":33},384599,"某正在进行中的项目，当前的PV=2200元、EV=2000元、AC=2500元，当前项目的SV和项目状态是 （ ）",[282,284,286,288],{"key":20,"text":283,"correct":22},"-300元；项目提前完成",{"key":24,"text":285,"correct":22},"+200元；项目提前完成",{"key":27,"text":287,"correct":22},"+8000元；项目按时完成",{"key":31,"text":289,"correct":29},"-200元；项目比原计划滞后",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":20,"analysis":33},384600,"在某一时刻，项目CPI为1.05，这表示（）",[294,296,298,300],{"key":20,"text":295,"correct":29},"项目100元的成本创造了105元的价值",{"key":24,"text":297,"correct":22},"项目100元的成本创造了100元的价值",{"key":27,"text":299,"correct":22},"项目进度提前了5%",{"key":31,"text":301,"correct":22},"项目进度落后了5%",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":27,"analysis":33},384601,"在进行成本估算时，将工作的计划数量与单位数量的历史成本相乘得到估算成本的方法称为（）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"自下而上估算法",{"key":24,"text":309,"correct":22},"类比估算法",{"key":27,"text":311,"correct":29},"参数估算法",{"key":31,"text":313,"correct":22},"质量成本估算法",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":20,"analysis":33},384602,"下图是一项布线工程计划和实际完成的示意图，2009年3月23日的PV、EV、AC分别是 （ ）",[318,320,322,324],{"key":20,"text":319,"correct":29},"PV=4 000元、EV=2 000元、AC=3 800元",{"key":24,"text":321,"correct":22},"PV=4 000元、EV=3 800元、AC=2 000元",{"key":27,"text":323,"correct":22},"PV=3 800元、EV=4 000元、AC=2 000元",{"key":31,"text":325,"correct":22},"PV=3 800元、EV=3 800元、AC=2 000元",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":20,"analysis":33},384603,"某信息系统集成项目采用净值分析技术进行成本控制，假设当前状况数据如下表所示，则该项目的CPI、EA C、当前项目的状态分别是 （ ） 。",[330,332,334,336],{"key":20,"text":331,"correct":29},"0.8，12 500元，进度滞后且成本超支",{"key":24,"text":333,"correct":22},"0.8，10 000元，进度提前且成本超支",{"key":27,"text":335,"correct":22},"1.25，12 500元，进度滞后且成本低于预算",{"key":31,"text":337,"correct":22},"1.25，10 000元，进度提前且成本低于预算",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},384604,"软件开发项目规模度量（size measurement）是估算软件项目工作量、编制成本预算、策划合理项目进度的基础。在下列方法中，()可用于软件的规模估算，帮助软件开发团队把握开发时间、费用分布等。",[342,344,346,348],{"key":20,"text":343,"correct":29},"德尔菲法",{"key":24,"text":345,"correct":22},"V模型方法",{"key":27,"text":347,"correct":22},"原型法",{"key":31,"text":349,"correct":22},"用例设计",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":24,"analysis":33},384605,"项目经理王某对其负责的系统集成项目进行了成本估算和进度安排，根据团队成员的情况分配了任务，并制定出计划执行预算成本的基准。由于公司高层领导非常重视该项目，特地调配了几名更有经验（薪水更高）的技术骨干参与项目，这种变化对项目绩效造成的最可能影响是 （33） 。",[354,356,358,360],{"key":20,"text":355,"correct":22},"正的成本偏差CV，正的进度偏差SV",{"key":24,"text":357,"correct":29},"负的成本偏差CV，正的进度偏差SV",{"key":27,"text":359,"correct":22},"正的成本偏差CV，负的进度偏差SV",{"key":31,"text":361,"correct":22},"负的成本偏差CV，负的进度偏差SV",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},384606,"在完成项目估算后，要制定项目的成本预算，其基本流程是：①将项目总成本分推到各个工作包；②()；③确定各项成本再分配的时间；④确定项目成本预算计划。",[366,368,370,372],{"key":20,"text":367,"correct":29},"将工作包成本再分解到相关活动上",{"key":24,"text":369,"correct":22},"进行准备金分析并分解到相关活动上",{"key":27,"text":371,"correct":22},"进行挣值分析和绩效预估",{"key":31,"text":373,"correct":22},"提出项目资金需求",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},384607,"项目的成本估算要经过识别并分析成本的构成科目、估算每一科目的成本大小、分析成本估算结果三个步骤。在第一个步骤中无法形成的是（）。",[378,380,382,384],{"key":20,"text":379,"correct":29},"低成本的替代方案",{"key":24,"text":381,"correct":22},"会计科目表",{"key":27,"text":383,"correct":22},"项目资源矩阵",{"key":31,"text":385,"correct":22},"项目资源数据表",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":27,"analysis":33},384608,"进行项目估算时,需要根据项目的特点等因素,决定采用何种估 算方法。( )方法的准确性会受到所采用估算模型的成熟度和基础 数据可靠性的影响 。",[390,392,393,394],{"key":20,"text":391,"correct":22},"专家判断",{"key":24,"text":39,"correct":22},{"key":27,"text":43,"correct":29},{"key":31,"text":395,"correct":22},"自下而上估算",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":20,"analysis":33},384609,"项目经理正在估算某个ERP项目的成本，此时尚未掌握项目的全部细节，项目经理此时可用（ ）来估算成本",[400,401,403,405],{"key":20,"text":309,"correct":29},{"key":24,"text":402,"correct":22},"自上而下估算法",{"key":27,"text":404,"correct":22},"蒙特卡洛分析",{"key":31,"text":406,"correct":22},"参数模型",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},384610,"某软件系统项目成本控制采用了挣值分析技术，假设当前状况数据是PV=4400元，EV=4000元，AC=5000元，BAC=10000元。则该项目的CPI、EA C、当前的项目的状态分别是 （） 。",[411,413,415,417],{"key":20,"text":412,"correct":29},"0.8，12500元，进度滞后、成本超支",{"key":24,"text":414,"correct":22},"0.8，10000元，进度提前且成本超支",{"key":27,"text":416,"correct":22},"1.25，12500元，进度滞后且成本低于预算",{"key":31,"text":418,"correct":22},"1.25，10000元，进度提前且成本低于预算",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":31,"analysis":33},384611,"甲公司最近中标某市应急指挥系统建设，为保证项目质量，项目经理在明确系统功能和性能的过程中，以本省应急指挥系统为标杆，定期将该项目的功能和性能与之比较。这种方法属于（）",[423,425,427,429],{"key":20,"text":424,"correct":22},"实验设计法",{"key":24,"text":426,"correct":22},"相互关系图法",{"key":27,"text":428,"correct":22},"优先矩阵图法",{"key":31,"text":430,"correct":29},"基准比较法",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},384612,"某项目有40%的概率获利10 万元，30%概率会亏损 8 万元，30%的概率既不获利也不亏损。该项目的预期货币价值分析(EMV)是（ ）",[435,437,439,441],{"key":20,"text":436,"correct":22},"0 元",{"key":24,"text":438,"correct":29},"1.6 万元",{"key":27,"text":440,"correct":22},"2 万元",{"key":31,"text":442,"correct":22},"6.4 万元",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":20,"analysis":33},384613,"某ERP软件开发项目共有12个模块，项目经理对较件进行了成本预算，预算每个模块的开发成本为5万元，按照项目管理计划，每月开发一个模块，12个月完成开发工作。在项目进行到第3个月底的时候，项目经理对照计划，发现刚完成了2个模块的开发工作，经统计，实际花费的成本为15万元。若按照目前的绩效情况，到所有模块开发完成时预计托费的总成本为()",[447,449,451,453],{"key":20,"text":448,"correct":29},"90万",{"key":24,"text":450,"correct":22},"75万",{"key":27,"text":452,"correct":22},"70万",{"key":31,"text":454,"correct":22},"66.7万",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},384614,"某项目计划成本为400万元，计划工期为4年，项目进行到两年时，监理发现预算成本为200万元，实际成本为100万元，挣值为50万元，则项目成本偏差为 （ ） 万元。",[459,461,463,465],{"key":20,"text":460,"correct":22},"150",{"key":24,"text":462,"correct":29},"-50",{"key":27,"text":464,"correct":22},"-150",{"key":31,"text":466,"correct":22},"50",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":20,"analysis":33},384615,"项目管理计划应整合其他规划过程的所有子计划和基准，一经确定即成为项目的基准。在项目管理中通常将()合并为一个绩效测量基准，这些基准可应用于挣值测量从而判断项目的整体绩效。",[471,473,475,477],{"key":20,"text":472,"correct":29},"范围基准、成本基准、进度基准",{"key":24,"text":474,"correct":22},"质量基准、成本基准、范围基准",{"key":27,"text":476,"correct":22},"质量基准、进度基准、范围基准",{"key":31,"text":478,"correct":22},"质量基准、进度基准、成本基准",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":31,"analysis":33},384616,"在项目的各种成本中，税金、额外福利属于（）。",[483,484,485,486],{"key":20,"text":79,"correct":22},{"key":24,"text":87,"correct":22},{"key":27,"text":57,"correct":22},{"key":31,"text":81,"correct":29},{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":31,"analysis":33},384617,"在各种绩效报告工具或技巧中，通过（）方法可综合范围、成本（或资源）和进度信息作为关键因素。",[491,493,495,497],{"key":20,"text":492,"correct":22},"绩效评审",{"key":24,"text":494,"correct":22},"趋势分析",{"key":27,"text":496,"correct":22},"偏差分析",{"key":31,"text":498,"correct":29},"挣值分析",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":31,"analysis":33},384618,"质量保证部门最近对某项目进行了质量审计，给出了一些建议和规定，一项建议看来关键应该采纳执行。因为它将影响到这个项目是成功地交给客户。如果建议不被执行，产品就不能满足需要。该项目的项目经理下一步应该（）",[503,505,507,509],{"key":20,"text":504,"correct":22},"开一个项目团队会议，以确定谁对这个问题负责",{"key":24,"text":506,"correct":22},"重新分配任务并且发现这个错误负有责任队员",{"key":27,"text":508,"correct":22},"立即进行产品的返工",{"key":31,"text":510,"correct":29},"发布一项变更申请以采取必要的纠正措施",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},384619,"在质量管理中可使用下列各图作为管理工具，这4种图按顺序号从小到大依次是 （ ） 。",[515,517,519,521],{"key":20,"text":516,"correct":22},"相互关系图、控制图、流程图、排列图",{"key":24,"text":518,"correct":29},"网络活动图、因果图、流程图、直方图",{"key":27,"text":520,"correct":22},"网络活动图、因果图、过程决策程序图、直方图",{"key":31,"text":522,"correct":22},"相互关系图、控制图、过程决策程序图、排列图",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":20,"analysis":33},384620,"质量管理人员在安排时间进度时，为了能够从全局出发、抓住关键路径、统筹安排、集中力量，从而达到按时或提前完成计划的目标，可以使用 ()",[527,529,531,533],{"key":20,"text":528,"correct":29},"活动网络图",{"key":24,"text":530,"correct":22},"因果图",{"key":27,"text":532,"correct":22},"优先矩阵图",{"key":31,"text":534,"correct":22},"检查表",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},384621,"项目经理在进行项目质量规划时应设计出符合项目要求的质量管理流程和标准，由此而产生的质量成本属于()",[539,541,543,545],{"key":20,"text":540,"correct":22},"纠错成本",{"key":24,"text":542,"correct":29},"预防成本",{"key":27,"text":544,"correct":22},"评估成本",{"key":31,"text":546,"correct":22},"缺陷成本",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":31,"analysis":33},384622,"（）不是质量控制的方法、技术和工具。",[551,553,554,556],{"key":20,"text":552,"correct":22},"趋势图",{"key":24,"text":534,"correct":22},{"key":27,"text":555,"correct":22},"控制图",{"key":31,"text":557,"correct":29},"制定参数基准表",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":20,"analysis":33},384623,"六西格玛管理方法的核心是将所有的工作作为一种流程，采取量化的方法分析流程中影响质量的因素，找出最关键的因素加以改进从而提高客户满意度。具体的改进流程为 （ ） 。",[562,564,566,568],{"key":20,"text":563,"correct":29},"①确定②测量③分析 ④改进 ⑤控制",{"key":24,"text":565,"correct":22},"①测量②分析③确定 ④改进 ⑤控制",{"key":27,"text":567,"correct":22},"①测量②分析③改进 ④确定 ⑤控制",{"key":31,"text":569,"correct":22},"①控制②测量③分析 ④改进 ⑤确定",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":20,"analysis":33},384624,"应用Pareto图可以（）",[574,576,578,580],{"key":20,"text":575,"correct":29},"将精力集中到最关键的因素上",{"key":24,"text":577,"correct":22},"量化风险",{"key":27,"text":579,"correct":22},"帮助预测未来的问题",{"key":31,"text":581,"correct":22},"改进风险管理",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},384625,"项目质量管理的质量基准和过程改进计划等管理文件或手册，是承担该项目实施任务各方应共同遵循的管理依据，它在 （ ） 过程中形成。",[586,588,590,592],{"key":20,"text":587,"correct":22},"制订系统质量管理制度",{"key":24,"text":589,"correct":29},"编制系统质量管理计划",{"key":27,"text":591,"correct":22},"分析系统质量管理界面",{"key":31,"text":593,"correct":22},"明确系统质量管理网络",[595,599,602,605,608,611],{"id":596,"name":597,"category":7,"favorite":598},136,"法律职业试卷二(客观题 )",2,{"id":600,"name":601,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":603,"name":604,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":606,"name":607,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":609,"name":610,"category":7,"favorite":8},28,"安全工程师",{"id":612,"name":613,"category":7,"favorite":8},112,"安全生产法律知识"]