[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,13,50,1397,[13,34,46,58,69,81,93,105,117,129,141,153,165,177,189,200,212,224,236,248,260,272,284,296,308,320,332,343,355,367,379,391,403,415,427,439,451,460,472,484,496,508,520,532,544,556,567,579,591,603],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},384526,1,"单选题","范围管理计划中一般不会描述",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","如何定义项目范围",false,{"key":24,"text":25,"correct":22},"B","制定详细的范围说明书",{"key":27,"text":28,"correct":29},"C","需求说明书的编制方法和要求",true,{"key":31,"text":32,"correct":22},"D","确认和控制范围","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},384527,"对项目范围管理是通过五个管理过程来实现的，最后一步是 （） 。",[38,40,42,44],{"key":20,"text":39,"correct":22},"编制范围管理计划",{"key":24,"text":41,"correct":22},"范围定义",{"key":27,"text":43,"correct":22},"创建工作分解结构",{"key":31,"text":45,"correct":29},"范围控制",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},384528,"详细的项目范围说明书是指导项目成功实施的关键文件。 （ ） 不应该属于范围定义的输入。",[50,52,54,56],{"key":20,"text":51,"correct":22},"项目章程",{"key":24,"text":53,"correct":22},"项目范围管理计划",{"key":27,"text":55,"correct":22},"批准的变更申请",{"key":31,"text":57,"correct":29},"项目合同文本",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},384529,"（）是客户等项目干系人正式验收并接受已完成的项目可交付物的过程。",[62,64,65,67],{"key":20,"text":63,"correct":29},"范围确认",{"key":24,"text":45,"correct":22},{"key":27,"text":66,"correct":22},"范围基准",{"key":31,"text":68,"correct":22},"里程碑清单",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":27,"analysis":33},384530,"下面关于项目范围确认描述，()是正确的",[73,75,77,79],{"key":20,"text":74,"correct":22},"范围确认是一项对项目范围说明书进行评审的活动",{"key":24,"text":76,"correct":22},"范围确认活动通常由项目组和质量管理员参与执行即可",{"key":27,"text":78,"correct":29},"范围确认过程中可能会产生变更申请",{"key":31,"text":80,"correct":22},"范围确认属于一项质量控制活动",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":24,"analysis":33},384531,"项目范围基准应用于识别风险过程，其 （ ） 。",[85,87,89,91],{"key":20,"text":86,"correct":22},"识别了所有必须完成的工作，因此包括了项目的所有风险",{"key":24,"text":88,"correct":29},"识别了项目假设",{"key":27,"text":90,"correct":22},"有助于把项目中所有必须完成的工作组织起来",{"key":31,"text":92,"correct":22},"包含以往项目的风险信息",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":27,"analysis":33},384532,"在范围定义的工具和技术中,( )通过产品分解、系统分析、价 值工程等技术厘清产品范围, 并把对产品的要求转化成项目的要求。",[97,99,101,103],{"key":20,"text":98,"correct":22},"焦点小组",{"key":24,"text":100,"correct":22},"各选方案生成",{"key":27,"text":102,"correct":29},"产品分析",{"key":31,"text":104,"correct":22},"引导式研讨会",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":27,"analysis":33},384533,"围绕创建工作分解结构，关于下表的判断正确的是 （ ） 。",[109,111,113,115],{"key":20,"text":110,"correct":22},"该表只是一个文件的目录，不能作为WBS的表示形式",{"key":24,"text":112,"correct":22},"该表如果再往下继续分解才能作为WBS",{"key":27,"text":114,"correct":29},"该表是一个列表形式的WBS",{"key":31,"text":116,"correct":22},"该表是一个树型的OBS",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},384534,"进行范围确认是项目管理中一项非常重要的工作,制定和执行确 认程序时,第一项工作一般是( )。",[121,123,125,127],{"key":20,"text":122,"correct":29},"确定需要进行确认范围的时间",{"key":24,"text":124,"correct":22},"识别确认范围需要哪些投入",{"key":27,"text":126,"correct":22},"确定确认范围正式被接受的标准和要素",{"key":31,"text":128,"correct":22},"确定确认范围会议的组织步骤",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":27,"analysis":33},384535,"软件项目管理是保证软件项目成功的重要手段，其中（ ）要确定哪些工作是项目应该做的，哪些工作不应包含在项目中。",[133,135,137,139],{"key":20,"text":134,"correct":22},"进度管理",{"key":24,"text":136,"correct":22},"风险管理",{"key":27,"text":138,"correct":29},"范围管理",{"key":31,"text":140,"correct":22},"配置管理",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},384536,"在没有现成的WBS模板情况下，为准备WBS，项目经理首先应该 （ ） 。",[145,147,149,151],{"key":20,"text":146,"correct":22},"确定每个项目阶段的估计成本和时间",{"key":24,"text":148,"correct":29},"确定主要的项目可交付成果",{"key":27,"text":150,"correct":22},"确定每个项目阶段的组成部分",{"key":31,"text":152,"correct":22},"确定要完成的关键工作",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},384537,"在项目验收时，建设方代表要对项目范围进行确认。下列围绕范围确认的叙述正确的是（）",[157,159,161,163],{"key":20,"text":158,"correct":22},"范围确认是确定交付物是否齐全，确认齐全后再进行质量验收",{"key":24,"text":160,"correct":29},"范围确认时，承建方要向建设方提交项目成果文件，如竣工图纸等",{"key":27,"text":162,"correct":22},"范围确认只能在系统终验时进行",{"key":31,"text":164,"correct":22},"范围确认和检查不同，不会用到诸如审查、产品评审、审计和走查等方法",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},384538,"在“可交付物”层次上明确了要完成项目需要做的相应工作的文档是 （ ） 。",[169,171,173,175],{"key":20,"text":170,"correct":29},"项目范围说明书",{"key":24,"text":172,"correct":22},"工作分解结构",{"key":27,"text":174,"correct":22},"项目建议书",{"key":31,"text":176,"correct":22},"项目申请书",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},384539,"以下关于项目范围确认的叙述中，（）是正确的。",[181,183,185,187],{"key":20,"text":182,"correct":22},"范围确认工作只针对项目产品的接受和移交",{"key":24,"text":184,"correct":22},"范围确认的结果是接受或拒绝项目交付物",{"key":27,"text":186,"correct":22},"范围确认的目的是核实项目范围说明书及WBS和WBS字典是否正确",{"key":31,"text":188,"correct":29},"合同项目进行范围确认活动时应邀请客户参加",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},384540,"（ ）不属于项目范围定义的输入",[193,194,196,198],{"key":20,"text":53,"correct":22},{"key":24,"text":195,"correct":22},"组织过程资产",{"key":27,"text":197,"correct":29},"项目工作分解结构WBS",{"key":31,"text":199,"correct":22},"项目章程和初步的范围说明书",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},384541,"（）是定义项目批准、定义项目组织，设定项目产品质量和规格、估算和控制项目费用",[204,206,208,210],{"key":20,"text":205,"correct":22},"WBS",{"key":24,"text":207,"correct":22},"详细范围说明书",{"key":27,"text":209,"correct":22},"WBS字典",{"key":31,"text":211,"correct":29},"工作包",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":27,"analysis":33},384542,"项目范围确实是项目管理过程中的重要工作，（ ）是其使用的工具和技术",[216,218,220,222],{"key":20,"text":217,"correct":22},"分解",{"key":24,"text":219,"correct":22},"专家判断",{"key":27,"text":221,"correct":29},"检查",{"key":31,"text":223,"correct":22},"偏差分析",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":27,"analysis":33},384543,"范围变更控制系统 。",[228,230,232,234],{"key":20,"text":229,"correct":22},"是用以确定正式修改项目文件所必须遵循步骤的正式存档程序",{"key":24,"text":231,"correct":22},"是用于在技术与管理方面监督指导有关报告内容，以及控制变更的确定与记录工作并确保其符合要求的存档程序",{"key":27,"text":233,"correct":29},"是一套用于对项目范围做出变更的程序，包括文书工作，跟踪系统以及授权变更所需的认可",{"key":31,"text":235,"correct":22},"可强制用于各项目工作以确保项目范围管理计划在未经事先审查与签字的情况下不得做出变更",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},384544,"王工是公司一个物联网网关开发项目的项目经理。他根据项目计划将其中的某个软件模块转包给了一个分包商。小李是分包商的新项目经理。王工应建议小李首先（）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"遵照王工为项目制定的WBS",{"key":24,"text":243,"correct":29},"针对这个软件模块的开发工作编制一个分项目WBS",{"key":27,"text":245,"correct":22},"建立类似的编码结构，以便于应用公共项目管理信息系统",{"key":31,"text":247,"correct":22},"建立一个WBS词典来显示详细的人员分工",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},384545,"项目绩效审计不包括()",[252,254,256,258],{"key":20,"text":253,"correct":29},"决算审计",{"key":24,"text":255,"correct":22},"经济审计",{"key":27,"text":257,"correct":22},"效率审计",{"key":31,"text":259,"correct":22},"效果审计",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},384546,"项目绩效报告就是要搜集项目（）并向项目干系人提供绩效信息",[264,266,268,270],{"key":20,"text":265,"correct":22},"干系人偏好",{"key":24,"text":267,"correct":22},"资源使用情况",{"key":27,"text":269,"correct":22},"团队绩效",{"key":31,"text":271,"correct":29},"所有基准数据",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":27,"analysis":33},384547,"挣值管理是一种综合了范围、时间、成本绩效测量的方法，通过与计划完成的工作量、实际挣得的收益、实际的成本进行比较，可以确定成本进度是否按计划执行。下图中标号所标示的区间依次应填写 （ ） 。",[276,278,280,282],{"key":20,"text":277,"correct":22},"①进度落后②成本差CV③进度差SV",{"key":24,"text":279,"correct":22},"①成本差CV②进度差SV③进度落后时间",{"key":27,"text":281,"correct":29},"①进度差SV②成本差CV③进度落后时间",{"key":31,"text":283,"correct":22},"①进度落后②进度差SV③成本差CV",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},384548,"甲公司生产急需5000个零件，承包给乙工厂进行加工，每个零件的加工费预算为20元，计划2周（每周工作5天）完成。甲公司负责人在开工后第9天早上到乙工厂检查进度，发现已完成加工3600个零件，支付款项81000元。经计算（）",[288,290,292,294],{"key":20,"text":289,"correct":22},"该项目的费用偏差为-18000元",{"key":24,"text":291,"correct":22},"该项目的进度偏差为-18000元",{"key":27,"text":293,"correct":22},"该项目的CPI为0.80",{"key":31,"text":295,"correct":29},"该项目的SPI为0.90",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},384549,"项目经理认为到目前为止的费用在某种程度上是项目将发生的剩余工作所需成本的指示器，则EAC的公式为（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":29},"EAC＝ACc－I－(BAC－EV)\u002FCPIc",{"key":24,"text":303,"correct":22},"EAC＝ACc＋ETC",{"key":27,"text":305,"correct":22},"EAC＝AC＋BAC－EV",{"key":31,"text":307,"correct":22},"EAC＝ACc＋EV",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":24,"analysis":33},384550,"进行该项目财务评价时，如果动态投资回收期Pt小于计算期n，则财务净现值 （ ） 。",[312,314,316,318],{"key":20,"text":313,"correct":22},"＜0项目不可行",{"key":24,"text":315,"correct":29},"＞0项目可行",{"key":27,"text":317,"correct":22},"＜0项目可行",{"key":31,"text":319,"correct":22},"＞0项目不可行",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":27,"analysis":33},384551,"某信息化建设项目的状态数据为：实际成本（A C）=44150元，计划值（PV）=28800，挣值（EV）=36610元，则成本执行（绩效）指数是（）。",[324,326,328,330],{"key":20,"text":325,"correct":22},"-7540",{"key":24,"text":327,"correct":22},"-4190",{"key":27,"text":329,"correct":29},"0.83",{"key":31,"text":331,"correct":22},"0.9",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":27,"analysis":33},384552,"（ ） 技术是确定为了完成项目工作所需的资源和技能水平的最佳方法。",[336,338,340,341],{"key":20,"text":337,"correct":22},"预测",{"key":24,"text":339,"correct":22},"挣值",{"key":27,"text":219,"correct":29},{"key":31,"text":342,"correct":22},"帕累托图",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":24,"analysis":33},384553,"单位在项目执行过程中，由于质量管理方面的问题造成了局部范围的返工，单位便失去了承建另外一个项目的机会，这属于（）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"质量成本",{"key":24,"text":350,"correct":29},"机会成本",{"key":27,"text":352,"correct":22},"时间成本",{"key":31,"text":354,"correct":22},"无形成本",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},384554,"某项目的绩效报告给出了该项目的PV、Ev、A C、CV、SV，CPI、SPI，据此可判断出该项目的 （ ） 。",[359,361,363,365],{"key":20,"text":360,"correct":29},"成本偏差、进度偏差",{"key":24,"text":362,"correct":22},"成本绩效指数、质量绩效指数",{"key":27,"text":364,"correct":22},"进度绩效指数、质量绩效指数",{"key":31,"text":366,"correct":22},"质量偏差、进度偏差",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},384555,"王工是一个智能大型建设项目的造价工程师。为准备预算，基于类似项目创建了一个模板，可以用于3~25层建筑物成本预算。它把成本分解成每平方米墙壁、地面、窗户、公用工程的成本。这属于（）。",[371,373,375,377],{"key":20,"text":372,"correct":22},"以量化为基础的估算",{"key":24,"text":374,"correct":29},"参数模型估算",{"key":27,"text":376,"correct":22},"自上而下的估算",{"key":31,"text":378,"correct":22},"类比估算",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},384556,"某软件公司项目的利润分析如下表所示。设贴现率为 10%，则第二年结束时的利润总额净现值为 （ ） 元。",[383,385,387,389],{"key":20,"text":384,"correct":22},"231000",{"key":24,"text":386,"correct":29},"200000",{"key":27,"text":388,"correct":22},"220000",{"key":31,"text":390,"correct":22},"210000",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},384557,"（ ）不是成本估算的方法",[395,397,399,401],{"key":20,"text":396,"correct":22},"估算法",{"key":24,"text":398,"correct":22},"确定资源费率",{"key":27,"text":400,"correct":22},"工料清单法",{"key":31,"text":402,"correct":29},"挣值分析法",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},384558,"项目绩效评审的主要目标是 。",[407,409,411,413],{"key":20,"text":408,"correct":22},"根据项目的基准计划来决定完成该项目需要多少资源",{"key":24,"text":410,"correct":22},"根据过去的绩效调整进度和成本基准",{"key":27,"text":412,"correct":22},"得到客户对项目绩效认同",{"key":31,"text":414,"correct":29},"决定项目是否应该进入下一个阶段",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":27,"analysis":33},384559,"企业管理费属于信息工程项目投资的（）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"工程前期费",{"key":24,"text":422,"correct":22},"直接费用",{"key":27,"text":424,"correct":29},"间接费用",{"key":31,"text":426,"correct":22},"措施费",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":27,"analysis":33},384560,"某工厂生产雷达，成品无效的历史数据是4%，在工厂测试每个雷达的成本为10 000元，工厂测试后重新组装每个测试合格雷达的成本是2000元，工厂测试后修理并重新组装每个不合格雷达的成本是23 000元，而修理安装每个现场的不合格雷达的成本是350 000元。利用决策树分析。若决定对500个雷达进行100%测试，预期支出需要 （ ） 万元",[431,433,435,437],{"key":20,"text":432,"correct":22},"550",{"key":24,"text":434,"correct":22},"596",{"key":27,"text":436,"correct":29},"642",{"key":31,"text":438,"correct":22},"700",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":27,"analysis":33},384561,"（ ）是制定成本管理计划阶段的主要工作任务。",[443,445,447,449],{"key":20,"text":444,"correct":22},"编制完成项目活动所需资源的大致成本",{"key":24,"text":446,"correct":22},"计算各个活动或工作包的估算成本，以建立成本基准",{"key":27,"text":448,"correct":29},"制定了项目成本结构、估算、预算和控制的标准",{"key":31,"text":450,"correct":22},"分析造成成本偏差的因素，控制项目预算的变更",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":27,"analysis":33},384562,"某信息化建设项目的状态数据为：实际成本（A C）=44 150元，计划值（PV）= 40 678元，挣值（EV）=36 610元，则成本执行（绩效）指数是 （ ） 。",[455,456,457,458],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":22},{"key":27,"text":329,"correct":29},{"key":31,"text":459,"correct":22},"0.90",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":27,"analysis":33},384563,"下图是某项目成本风险的蒙特卡罗分析图。以下说法中不正确的是（）",[464,466,468,470],{"key":20,"text":465,"correct":22},"蒙特卡罗分析法也叫随机模拟法",{"key":24,"text":467,"correct":22},"该图用于风险分析时，可以支持定量分析",{"key":27,"text":469,"correct":29},"根据该图，41万元完成的概率是12%，如果要达到75%的概率，需要增加5.根据该图，41万元完成的概率是12%，如果要达到75%的概率，需要增加5.57万元作为应急储备",{"key":31,"text":471,"correct":22},"该图显示，用45万元的成本也可能完成计划",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":24,"analysis":33},384564,"公司按照项目核算成本，在针对某化工厂信息化咨询项目中，需进行10天的驻场研究，产生成本如下：①公司管理费用的项目分摊成本；②咨询顾问每人每天出差补贴500元，入工资结算；③顾问如需进入生产车间，每人额外增加健康补助100元\u002F天。按照成本类型分类，上述三类成本应分别列入()",[476,478,480,482],{"key":20,"text":477,"correct":22},"①间接成本②间接成本③可变成本",{"key":24,"text":479,"correct":29},"①间接成本②直接成本③可变成本",{"key":27,"text":481,"correct":22},"①直接成本②直接成本③固定成本",{"key":31,"text":483,"correct":22},"①直接成本②间接成本③固定成本",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":27,"analysis":33},384565,"以下各项中，不能作为项目成本预算工具或技术的是()",[488,490,492,494],{"key":20,"text":489,"correct":22},"参数估算",{"key":24,"text":491,"correct":22},"资金限制平衡",{"key":27,"text":493,"correct":29},"挣值分析",{"key":31,"text":495,"correct":22},"准备金分析",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},384566,"下表是项目甲、乙、丙三个项目的进度数据，则（ ）最有可能在成本的约束内完成。",[500,502,504,506],{"key":20,"text":501,"correct":29},"项目甲",{"key":24,"text":503,"correct":22},"项目乙",{"key":27,"text":505,"correct":22},"项目丙",{"key":31,"text":507,"correct":22},"项目甲和项目丙",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":27,"analysis":33},384567,"项目预算中包含应急储备的目的是（）",[512,514,516,518],{"key":20,"text":513,"correct":22},"降低范围变更的概率",{"key":24,"text":515,"correct":22},"杜绝范围变更",{"key":27,"text":517,"correct":29},"降低成本超支的概率",{"key":31,"text":519,"correct":22},"杜绝成本超支",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":24,"analysis":33},384568,"项目经理在运行预算方案编制时，收集到的基础数据如下：工作包的成本估算为40万元；工作包的应急储备金为4万元；管理储备金为2万元。该项目的成本基准是（）万元。",[524,526,528,530],{"key":20,"text":525,"correct":22},"40",{"key":24,"text":527,"correct":29},"44",{"key":27,"text":529,"correct":22},"42",{"key":31,"text":531,"correct":22},"46",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":27,"analysis":33},384569,"某正在进行中的项目，当前的PV=2200元、EV=2000元、AC=2500元，该项目的CPI和成本绩效是 （ ） 。",[536,538,540,542],{"key":20,"text":537,"correct":22},"0.20；实际成本与计划的一致",{"key":24,"text":539,"correct":22},"0.80；实际成本比计划成本要低",{"key":27,"text":541,"correct":29},"0.80；实际成本超出了计划成本",{"key":31,"text":543,"correct":22},"1.25；实际成本超出了计划成本",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},384570,"绩效报告是指搜集所有基准数据并向项目干系人提供项目绩效信息，为了形成绩效报告，首先要收集材料，这些材料不包括（）。",[548,550,552,554],{"key":20,"text":549,"correct":22},"被评价项目资料的清单",{"key":24,"text":551,"correct":29},"项目绩效预测",{"key":27,"text":553,"correct":22},"调查问卷",{"key":31,"text":555,"correct":22},"征询函",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},384571,"公司刚承接了一个系统集成及运行维护的项目，在做集成验收活动的资源估算时，需要综合考虑完成活动的工程师的经验及技能，各种大小或类型的机器，各种测试工具（手工操作或自动化工具），以及所需资源的自制或购买决策等，此种资源估算法为（ ）",[560,562,564,565],{"key":20,"text":561,"correct":22},"自上而下估算",{"key":24,"text":563,"correct":29},"多方案分析",{"key":27,"text":219,"correct":22},{"key":31,"text":566,"correct":22},"项目管理软件",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":31,"analysis":33},384572,"项目进行到某阶段时，项目经理进行了绩效分析，计算出 CPI 值为 0．91。这表示()",[571,573,575,577],{"key":20,"text":572,"correct":22},"项目的每9l 元人民币投资中可创造相当于 100 元的价值",{"key":24,"text":574,"correct":22},"当项目完成时将会花费投资额的91％",{"key":27,"text":576,"correct":22},"项目仅进展到计划进度的91％",{"key":31,"text":578,"correct":29},"项目的每 100 元人民币投资中只创造相当于 91 元的价值",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},384573,"成本基准是对项目进行成本管控的重要措施，成本基准是指按时间分段的项目（）",[583,585,587,589],{"key":20,"text":584,"correct":22},"成本估算",{"key":24,"text":586,"correct":29},"成本预算",{"key":27,"text":588,"correct":22},"实际成本",{"key":31,"text":590,"correct":22},"隐形成本",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":27,"analysis":33},384574,"以下关于项目成本预算的描述，错误的是（ ）。",[595,597,599,601],{"key":20,"text":596,"correct":22},"当项目的具体工作无法确定时，无法进行成本预算",{"key":24,"text":598,"correct":22},"成本基准计划可以作为度量项目绩效的依据",{"key":27,"text":600,"correct":29},"管理储备是为范围和成本的潜在变化而预留的预算，因此需要体现在项目成本基线里",{"key":31,"text":602,"correct":22},"成本预算过程完成后，可能会引起项目管理计划的更新",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":24,"analysis":33},384575,"现有一项目投资12万元，在3月末时进行评估时发现，完成30%的工作量，花费了2万元，项目计划工期1年。下列描述中正确的是 （ ） 。",[607,609,611,613],{"key":20,"text":608,"correct":22},"成本已经超支",{"key":24,"text":610,"correct":29},"节约了成本",{"key":27,"text":612,"correct":22},"不能判断",{"key":31,"text":614,"correct":22},"以上都不正确",[616,620,623,626,629,632],{"id":617,"name":618,"category":7,"favorite":619},136,"法律职业试卷二(客观题 )",2,{"id":621,"name":622,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":624,"name":625,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":627,"name":628,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":630,"name":631,"category":7,"favorite":8},28,"安全工程师",{"id":633,"name":634,"category":7,"favorite":8},112,"安全生产法律知识"]