[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":599},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,12,50,1397,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,198,210,222,234,246,257,269,281,292,303,315,327,339,351,359,371,383,393,405,415,427,439,451,463,473,485,497,509,521,533,545,553,565,575,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},384476,1,"单选题","下列关于工作分解结构（WBS）的叙述中，错误的是()",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","项目经理在分解结构时，严格地将一个工作单元隶属于某个上层工作单元，完全避免交叉从属",false,{"key":24,"text":25,"correct":22},"B","项目管理部依照项目经理分解的WBS进行项目成本估算，但最后发现成本超过预计投资",{"key":27,"text":28,"correct":22},"C","项目经理将项目管理工作也编制成为WBS的一部分",{"key":30,"text":31,"correct":32},"D","项目经理在执行某复杂项目时，在项目开始阶段一次性将项目分解成为精确的WBS，最后按计划完成了任务，受到领导好评",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},384477,"某项目经理在对项目历时进行估算时，认为正常情况下完成项目需要42天，同时也分析了影响项目工期的因素，认为最快可以在35天内完成工作，而在最不利的条件下则需要55天完成任务。采用三点估算得到的工期是（）天",[38,40,42,44],{"key":20,"text":39,"correct":22},"42",{"key":24,"text":41,"correct":32},"43",{"key":27,"text":43,"correct":22},"44",{"key":30,"text":45,"correct":22},"55",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},384478,"项目管理是保证项目成功的核心手段，在项目实施过程中具有重大作用。项目开发计划是项目管理的重要元素，是项目实施的基础；范围管理要确定哪些工作是项目应该做的，哪些工作不应该包含在项目中；（）采用科学的方法，在与质量、成本目标等要素相协调的基础上按期实现项目目标。",[50,52,54,56],{"key":20,"text":51,"correct":32},"进度管理",{"key":24,"text":53,"correct":22},"风险管理",{"key":27,"text":55,"correct":22},"范围管理",{"key":30,"text":57,"correct":22},"配置管理",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},384479,"以下关于关键路径法的叙述，()是不正确的",[62,64,66,68],{"key":20,"text":63,"correct":22},"如果关键路径中的一个活动延迟，将会影响整个项目计划",{"key":24,"text":65,"correct":32},"关键路径包括所有项目进度控制点",{"key":27,"text":67,"correct":22},"如果有两个或两个以上的路径长度一样，就有可能存在多个关键路径",{"key":30,"text":69,"correct":22},"关键路径可随项目的进展而改变",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},384480,"一个新测试中心将在两年内建成。项目发起人和项目经理已经确定并且高层次估算已经开始。预计该项目可以在预算内按进度计划完成。唯一的难点是获得完成工作所需的具有正确专门技能的人力资源。在这种情况下，项目经理应花更多时间建立（）",[74,76,78,80],{"key":20,"text":75,"correct":22},"风险分析",{"key":24,"text":77,"correct":22},"责任分配矩阵",{"key":27,"text":79,"correct":22},"责任图",{"key":30,"text":81,"correct":32},"受资源限制的进度计划",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},384481,"在根据计划对项目进展情况进行跟踪时，项目经理发现最终可交付成果按照管理层规定的交付日期完工。这时，项目经理应 （ ） 。",[86,88,90,92],{"key":20,"text":87,"correct":22},"驱动项目团队更加快速工作，以便弥补丢失的时间",{"key":24,"text":89,"correct":22},"不要同意管理层要求的不合理的工期",{"key":27,"text":91,"correct":32},"通过削减最终可交付成果的规模或延长项目工期的某种结合重新洽谈",{"key":30,"text":93,"correct":22},"重新计算项目进度，并按照沟通计划进行分发",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},384482,"项目时间管理包括使项目按时完成所必需的管理过程，活动定义是其中的一个重要过程。通常可以使用（ ）来进行活动定义。",[98,100,102,104],{"key":20,"text":99,"correct":22},"鱼骨图",{"key":24,"text":101,"correct":32},"工作分解结构",{"key":27,"text":103,"correct":22},"层次分解结构",{"key":30,"text":105,"correct":22},"功能分解图",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},384483,"某项目经理正在进行活动资源估算，他可以采用的方法或技术中不包括()",[110,112,114,116],{"key":20,"text":111,"correct":22},"已有案例的估算资料",{"key":24,"text":113,"correct":22},"项目管理软件",{"key":27,"text":115,"correct":22},"多方案分析",{"key":30,"text":117,"correct":32},"后备分析",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},384484,"某项目计划08年12月5日开始进入首批交付的产品测试工作，估算工作量为8（人）×10（天），误差为2天，则以 理解正确（天指工作日）",[122,124,126,128],{"key":20,"text":123,"correct":22},"表示活动至少需要8人天，最多不超过10人天",{"key":24,"text":125,"correct":32},"表示活动至少需要8天，最多不超过12天",{"key":27,"text":127,"correct":22},"表示活动至少需要64人天，最多不超过112人天",{"key":30,"text":129,"correct":22},"表示活动至少需要64天，最多不超过112天",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},384485,"项目经理在对所负责项目检查时发现，项目的CPI=0.8，SV=-3 600元，则说明项目的绩效是 （ ） 。",[134,136,138,140],{"key":20,"text":135,"correct":22},"项目成本超支，进度提前",{"key":24,"text":137,"correct":32},"项目成本超支，进度延后",{"key":27,"text":139,"correct":22},"项目成本节约，进度提前",{"key":30,"text":141,"correct":22},"项目成本节约，进度延后",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":30,"analysis":33},384486,"某项目完成估计需要12个月。在进一步分析后认为最少将花8个月，最糟糕的情况下将花28个月。那么，这个估计的PERT值是 个月。",[146,148,150,152],{"key":20,"text":147,"correct":22},"9",{"key":24,"text":149,"correct":22},"11",{"key":27,"text":151,"correct":22},"13",{"key":30,"text":153,"correct":32},"14",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},384487,"A公司的某项目即将开始，项目经理估计该项目10天即可完成，如果出现问题耽搁了也不会超过20天完成，最快6天即可完成。根据项目历时估计中的三点估算法，该项目历时的估算方差为（）",[158,160,162,164],{"key":20,"text":159,"correct":22},"2.1天",{"key":24,"text":161,"correct":22},"2.2天",{"key":27,"text":163,"correct":32},"2.3天",{"key":30,"text":165,"correct":22},"2.4天",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":30,"analysis":33},384488,"在项目某阶段的实施过程中，A活动需要2天2人完成，B活动需要2天2人完成，C活动需要5天4人完成，D活动需要3天2人完成，E活动需要1天1人完成，该阶段的时标网络图如下。该项目组共有8人，且负责 A、E活动的人因另有安排，无法帮助其他人完成相应工作，且项目整个工期刻不容缓。以下 安排是恰当的，能够使实施任务顺利完成",[170,172,174,176],{"key":20,"text":171,"correct":22},"活动提前两天开始",{"key":24,"text":173,"correct":22},"B活动推迟两天开始",{"key":27,"text":175,"correct":22},"D活动提前两天开始",{"key":30,"text":177,"correct":32},"D活动推迟两天开始",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},384489,"在某项目进行的第三个月，累计计划费用是25万元人民币，而实际支出为28万元，以下关于这个项目进展的叙述，正确的是 （） 。",[182,184,186,188],{"key":20,"text":183,"correct":32},"提供的信息不全，无法评估",{"key":24,"text":185,"correct":22},"由于成本超支，项目面临困难",{"key":27,"text":187,"correct":22},"项目将在原预算内完成",{"key":30,"text":189,"correct":22},"项目计划提前",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},384490,"项目管理是保证项目成功的核心手段，在项目实施过程中具有重大作用。项目开发计划是项目管理的重要元素，是项目实施的基础； （请作答此空） 要确定哪些工作是项目应该做的，哪些工作部应该包含在项目中； （ ） 采用科学的方法，在与质量、成本目标等要素相协调的基础上按期实现项目目标。",[194,195,196,197],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":32},{"key":30,"text":57,"correct":22},{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":30,"analysis":33},384491,"在创建WBS时，()是不恰当的",[202,204,206,208],{"key":20,"text":203,"correct":22},"把项目生命周期的各阶段作为分解的第一层，交付物安排在第二层",{"key":24,"text":205,"correct":22},"把项目的重要交付物作为分解的第一层",{"key":27,"text":207,"correct":22},"把子项目安排在第一层",{"key":30,"text":209,"correct":32},"把项目中的各类资源安排在第一层",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":20,"analysis":33},384492,"一个新软件产品的构建阶段即将完工。下一个阶段是测试和执行。这个进度计划提前了两周。在进入最后阶段之前，项目经理最应该关注（）。",[214,216,218,220],{"key":20,"text":215,"correct":32},"范围确认",{"key":24,"text":217,"correct":22},"风险控制",{"key":27,"text":219,"correct":22},"绩效报告",{"key":30,"text":221,"correct":22},"成本控制",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},384493,"通常把被批准的详细的项目范围说明书和与之相关的 （ ） 作为项目的范围基准，并在整个项目的生命期内对之进行监控、核实和确认。",[226,228,230,232],{"key":20,"text":227,"correct":22},"产品需求",{"key":24,"text":229,"correct":22},"项目管理计划",{"key":27,"text":231,"correct":32},"WBS以及WBS字典",{"key":30,"text":233,"correct":22},"合同",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":27,"analysis":33},384494,"变更是项目干系人常常由于项目环境或者是其他各种原因要求对项目的范围基准等进行修改。如某项目由于行业标准变化导致变更，这属于（）",[238,240,242,244],{"key":20,"text":239,"correct":22},"项目实施组织本身发生变化",{"key":24,"text":241,"correct":22},"客户对项目、项目产品或服务的要求发生变化",{"key":27,"text":243,"correct":32},"项目外部环境发生变化",{"key":30,"text":245,"correct":22},"项目范围的计划编制不周密详细",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},384495,"（）一般不属于项目范围管理活动。",[250,252,254,256],{"key":20,"text":251,"correct":32},"制订初步的范围说明书",{"key":24,"text":253,"correct":22},"范围定义",{"key":27,"text":255,"correct":22},"创建WBS",{"key":30,"text":215,"correct":22},{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":24,"analysis":33},384496,"在一个设计项目开始两个月后，客户要求对项目产品进行修改并在没有通知项目经理的前提下就做了这项变更，在最后测试阶段，发现测试结果与当初计划不同。这种情况主要是由于()",[261,263,265,267],{"key":20,"text":262,"correct":22},"测试计划定义不完善",{"key":24,"text":264,"correct":32},"没有做好范围变更控制",{"key":27,"text":266,"correct":22},"质量管理计划的开发不完善",{"key":30,"text":268,"correct":22},"没有坚持沟通计划",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":27,"analysis":33},384497,"围绕范围管理，下列说法中， （ ） 是正确的。",[273,275,277,279],{"key":20,"text":274,"correct":22},"为确保客户满意，交付物一定要比范围说明书规定的多",{"key":24,"text":276,"correct":22},"为节省成本，非关键交付物可根据情况决定是否交付",{"key":27,"text":278,"correct":32},"要严格按照范围基准落实工作，提供相关交付物",{"key":30,"text":280,"correct":22},"由于客户不一定关注WBS内容，可由工作包负责人自行",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":27,"analysis":33},384498,"项目范围的定义和管理过程将影响到整个项目是否成功。每个项目都必须慎重地权衡工具、数据来源、方法论、过程和程序以及其他一些因素，以确保在管理项目范围时所做的努力与项目的规模、复杂性和重要性相符。因此，项目经理应该重点关注 （ ） 这个过程。",[285,287,289,291],{"key":20,"text":286,"correct":22},"范围控制",{"key":24,"text":288,"correct":22},"范围变更",{"key":27,"text":290,"correct":32},"编制范围管理计划",{"key":30,"text":215,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":30,"analysis":33},384499,"在某信息化项目建设过程中，客户对于最终的交付物不认可，给出的原因是系统信号强度超过用户设备能接受的上限。如果客户对于项目文件中的验收标准有异议，而项目内所有工作流程均无问题，则可能是 （ ） 环节出了问题。",[296,298,300,302],{"key":20,"text":297,"correct":22},"质量控制",{"key":24,"text":299,"correct":22},"WBS分解过程",{"key":27,"text":301,"correct":22},"变更控制",{"key":30,"text":215,"correct":32},{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},384500,"某项目的项目经理在进行项目范围变更时，在对项目的技术和管理文件做了必要的修改后，他下一步应该 （ ）",[307,309,311,313],{"key":20,"text":308,"correct":32},"及时通知项目干系人",{"key":24,"text":310,"correct":22},"修改公司的知识管理系统",{"key":27,"text":312,"correct":22},"获取客户的正式认可",{"key":30,"text":314,"correct":22},"获得政府认可",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":24,"analysis":33},384501,"某项目经理已经完成了WBS和每个工作包的成本估算。要根据这些数据编制项目成本估算，该项目经理要 （ ）",[319,321,323,325],{"key":20,"text":320,"correct":22},"使用WBS的最高层次进行类比估算",{"key":24,"text":322,"correct":32},"计算工作包和风险储备估算的总和",{"key":27,"text":324,"correct":22},"把工作包估算累计成为项目估算总和",{"key":30,"text":326,"correct":22},"获得专家对项目成本总计的意见",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":24,"analysis":33},384502,"小王所在单位的项目管理委员会每月开一次项目评审会，负责对任何预算在一百万元以上项目的实施情况进行评审。小王最近被提升为高级项目经理并负责管理一个大型项目，项目管理委员会要求小王介绍项目目标、边界和配置管理等材料。为此，小王需要准备 （ ）。",[331,333,335,337],{"key":20,"text":332,"correct":22},"总体设计方案",{"key":24,"text":334,"correct":32},"项目范围说明书",{"key":27,"text":336,"correct":22},"产品描述",{"key":30,"text":338,"correct":22},"WBS和WBS字典",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":27,"analysis":33},384503,"某公司最近在一家大型企业 OA 项目招标中胜出，小张被指定为该项目的项目经理。公司发布了项目章程，小张依据该章程等项目资料编制了由项目目标、可交付成果、项目边界及成本和质量测量指标等内容组成的 （）。",[343,345,347,349],{"key":20,"text":344,"correct":22},"项目工作说明书",{"key":24,"text":346,"correct":22},"范围管理计划",{"key":27,"text":348,"correct":32},"范围说明书",{"key":30,"text":350,"correct":22},"WBS",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":30,"analysis":33},384504,"在创建WBS时，（ ）是不恰当的。",[355,356,357,358],{"key":20,"text":203,"correct":22},{"key":24,"text":205,"correct":22},{"key":27,"text":207,"correct":22},{"key":30,"text":209,"correct":32},{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":27,"analysis":33},384505,"某项目经理在生成WBS时，按照（）方法将项目分解为“需求分析、方案设计、实施准备、测试和验收”等几个过程。",[363,365,367,369],{"key":20,"text":364,"correct":22},"子项目",{"key":24,"text":366,"correct":22},"工作任务",{"key":27,"text":368,"correct":32},"生命周期",{"key":30,"text":370,"correct":22},"可交付物",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":20,"analysis":33},384506,"在项目结项后的项目审计中，审计人员要求项目经理提交 （ ） 作为该项目的范围确认证据。",[375,377,379,381],{"key":20,"text":376,"correct":32},"系统的终验报告",{"key":24,"text":378,"correct":22},"该项目的第三方测试报告",{"key":27,"text":380,"correct":22},"项目的监理报告",{"key":30,"text":382,"correct":22},"该项目的项目总结报告",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},384507,"项目范围管理过程包括：范围计划、 （ ） 、创建WBS、范围确认、范围控制5个主要过程。",[387,389,390,391],{"key":20,"text":388,"correct":22},"需求管理",{"key":24,"text":253,"correct":32},{"key":27,"text":288,"correct":22},{"key":30,"text":392,"correct":22},"编制范围说明书",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":20,"analysis":33},384508,"小王正在负责管理一个产品开发项目。开始时产品被定义为“最先进的个人数码产品”，后来被描述为“先进个人通信工具”。在市场人员的努力下该产品与某市交通局签订了采购意向书，随后与用户、市场人员和研发工程师进行了充分的讨论后，被描述为“成本在1000元以下，能通话、播放MP3、能运行Win CE的个人掌上电脑”。这表明产品的特征正在不断改进，但是小王还需将()与其相协调。",[397,399,401,403],{"key":20,"text":398,"correct":32},"项目范围定义",{"key":24,"text":400,"correct":22},"项目干系人利益",{"key":27,"text":402,"correct":22},"范围变更控制系统",{"key":30,"text":404,"correct":22},"用户的战略计划",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":27,"analysis":33},384509,"用于项目范围确认的是（）",[409,410,412,414],{"key":20,"text":334,"correct":22},{"key":24,"text":411,"correct":22},"工作包",{"key":27,"text":413,"correct":32},"范围基准",{"key":30,"text":350,"correct":22},{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":24,"analysis":33},384510,"项目的工作分解结构（WBS）是管理项目范围的基础，在进行项目工作分解的时候，一般要遵从以下几个步骤： ① 识别和确认项目的阶段和主要可交付物； ② 确认项目主要交付成果的组成要素； ③ 分解并确认每一组成部分是否分解得足够详细； ④ 核实分解的正确性。 这几个步骤中正确的操作顺序应该是 （ ） 。",[419,421,423,425],{"key":20,"text":420,"correct":22},"①②③④",{"key":24,"text":422,"correct":32},"①③②④",{"key":27,"text":424,"correct":22},"①③④②",{"key":30,"text":426,"correct":22},"①④③②",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},384511,"李某负责的一个信息系统项目，在与客户共同进行的质量审查中发现有一个功能模块与客户需求不一致，经过追溯后并未发现相应的变更请求，李某最终只好对该模块进行了重新设计和编码。造成此次返工的具体原因可能是 （ ）",[431,433,435,437],{"key":20,"text":432,"correct":22},"没有进行变更管理",{"key":24,"text":434,"correct":32},"没有进行范围确认",{"key":27,"text":436,"correct":22},"没有进行需求管理",{"key":30,"text":438,"correct":22},"没有进行回归测试",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":27,"analysis":33},384512,"制定准确，详细的项目范围说明书是保证项目成功实施的关键，（ ）一般不属于项目范围说明书的主要内容。",[443,445,447,449],{"key":20,"text":444,"correct":22},"项目资源需求",{"key":24,"text":446,"correct":22},"项目目标",{"key":27,"text":448,"correct":32},"项目目的",{"key":30,"text":450,"correct":22},"项目交付成果清单",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":30,"analysis":33},384513,"项目经理在进行日常项目范围控制时，可不包括的工作是（）",[455,457,459,461],{"key":20,"text":456,"correct":22},"监控项目的工作范围",{"key":24,"text":458,"correct":22},"监控项目产品范围状态",{"key":27,"text":460,"correct":22},"控制范围变更",{"key":30,"text":462,"correct":32},"控制项目干系人范围变化",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":27,"analysis":33},384514,"某公司的项目审查委员会每个季度召开会议，审查所有预算超过一千二百万元的项目。李工最近被提升为该公司高级项目经理，并承担了最大的项目之一，即开发下一代计算机辅助生产流程系统，审查委员会要求李工在下次会议上说明项目的目标、工作内容和成果，为此李工需要准备的文件是 （ ） 。",[467,469,471,472],{"key":20,"text":468,"correct":22},"项目章程",{"key":24,"text":470,"correct":22},"产品阐述",{"key":27,"text":348,"correct":32},{"key":30,"text":101,"correct":22},{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},384515,"确认项目范围是验收项目可交付成果的过程，其中使用的方法是 ( )。",[477,479,481,483],{"key":20,"text":478,"correct":32},"检查和群体决策技术",{"key":24,"text":480,"correct":22},"验证和决策",{"key":27,"text":482,"correct":22},"检查和群体创新技术",{"key":30,"text":484,"correct":22},"验证和审查",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":27,"analysis":33},384516,"范围管理计划中一般不会描述()",[489,491,493,495],{"key":20,"text":490,"correct":22},"如何定义项目范围",{"key":24,"text":492,"correct":22},"制定详细的范围说明书",{"key":27,"text":494,"correct":32},"需求说明书的编制方法和要求",{"key":30,"text":496,"correct":22},"确认和控制范围",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},384517,"下面关于WBS的描述，错误的是（）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"WBS是管理项目范围的基础，详细描述了项目所要完成的工作",{"key":24,"text":504,"correct":32},"WBS最底层的工作单元称为功能模块",{"key":27,"text":506,"correct":22},"树型结构图的WBS层次清晰、直观、结构性强",{"key":30,"text":508,"correct":22},"比较大的、复杂的项目一般采用列表形式的WBS表示",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},384518,"下列关于工作分解结构叙述中，正确是 （） 。",[513,515,517,519],{"key":20,"text":514,"correct":22},"项目经理考虑工作单元的重要性，需要从属于多个上层工作单元",{"key":24,"text":516,"correct":32},"工作分解结构中，每下降一层代表对项目工作的更详细定义",{"key":27,"text":518,"correct":22},"项目经理认为WBS分解太麻烦，因此依据分解结果进行成本估算不可行",{"key":30,"text":520,"correct":22},"项目经理认为项目管理工作属于管理工作，应在WBS分解内容之外",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},384519,"以下关于工作包的描述，正确的是 。",[525,527,529,531],{"key":20,"text":526,"correct":32},"可以在此层面上对其成本和进度进行可靠的估算",{"key":24,"text":528,"correct":22},"工作包是项目范围管理计划关注的内容之一",{"key":27,"text":530,"correct":22},"工作包是WBS的中间层",{"key":30,"text":532,"correct":22},"不能支持未来的项目活动定义",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},384520,"WBS工作包中一般不包括的成本是()。",[537,539,541,543],{"key":20,"text":538,"correct":32},"管理成本",{"key":24,"text":540,"correct":22},"设备采购成本",{"key":27,"text":542,"correct":22},"项目人员成本",{"key":30,"text":544,"correct":22},"直接成本",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":30,"analysis":33},384521,"下列关于工作分解结构（WBS）的叙述中，错误的是 （ ） 。",[549,550,551,552],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":32},{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":30,"analysis":33},384522,"在对一项任务的检查中，项目经理发现一个团队成员正在用与WBS词典规定不符的方法来完成这项工作。项目经理应首先 （ ） 。",[557,559,561,563],{"key":20,"text":558,"correct":22},"告诉这名团队成员采取纠正措施",{"key":24,"text":560,"correct":22},"确定这种方法对职能经理而言是否是可以接受的",{"key":27,"text":562,"correct":22},"问这名团队成员，这种变化是否必要",{"key":30,"text":564,"correct":32},"确定这种变化是否改变了工作包的范围",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},384523,"制定项目计划时，首先应关注的是项目()",[569,570,571,573],{"key":20,"text":348,"correct":32},{"key":24,"text":101,"correct":22},{"key":27,"text":572,"correct":22},"风险管理计划",{"key":30,"text":574,"correct":22},"质量计划",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":30,"analysis":33},384524,"（ ） 不属于制订WBS过程的功能。",[579,581,583,585],{"key":20,"text":580,"correct":22},"为提高项目成本、活动历时估算和资源估算的准确度建立基础",{"key":24,"text":582,"correct":22},"定义绩效考核和控制的基准",{"key":27,"text":584,"correct":22},"形成清晰的职责任命",{"key":30,"text":586,"correct":32},"建立项目经理和项目干系人之间的沟通网络",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":27,"analysis":33},384525,"下面关于项目范围确认描述， （ ） 是正确的。",[591,593,595,597],{"key":20,"text":592,"correct":22},"范围确认是一项对项目范围说明书进行评审的活动",{"key":24,"text":594,"correct":22},"范围确认活动通常由项目组和质量管理员参与执行即可",{"key":27,"text":596,"correct":32},"范围确认过程中可能会产生变更申请",{"key":30,"text":598,"correct":22},"范围确认属于一项质量控制活动",[600,604,607,610,613,616],{"id":601,"name":602,"category":7,"favorite":603},136,"法律职业试卷二(客观题 )",2,{"id":605,"name":606,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":608,"name":609,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":611,"name":612,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":614,"name":615,"category":7,"favorite":8},28,"安全工程师",{"id":617,"name":618,"category":7,"favorite":8},112,"安全生产法律知识"]