[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-165-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":599},{"id":5,"name":6,"category":7,"favorite":8},165,"(中级) 系统集成项目管理工程师","职业资格",0,11,50,1397,[13,34,46,58,70,81,93,105,117,129,141,153,165,177,189,201,213,225,233,244,256,268,280,292,304,316,328,340,351,363,375,387,399,411,420,432,443,455,467,475,487,497,509,521,533,545,553,565,577,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},384426,1,"单选题","某项目发生了进度延误，于是项目经理在项目关键路径上增加了资源，但是工期仍然未能有效缩短，其可能的原因是()",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","关键活动的历时总是固定不变的",false,{"key":24,"text":25,"correct":22},"B","关键活动所配置的资源数量总是充足的",{"key":27,"text":28,"correct":22},"C","关键路径上的活动是不依赖于资源的",{"key":30,"text":31,"correct":32},"D","资源的增加可能会导致额外问题的产生从而降低效率",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},384427,"某活动的工期采用三点估算法进行估算，其中最悲观估算是19天，最乐观估算是9天，最可能的估算是11天，则该活动的历时大致需要12天，该活动历是方差大概是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1.5",{"key":24,"text":41,"correct":32},"1.68",{"key":27,"text":43,"correct":22},"1.9",{"key":30,"text":45,"correct":22},"2",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},384428,"如果挣值EV是300万元，实际成本AC是350万元，计划值PV是375万元。进度执行指数显示（）",[50,52,54,56],{"key":20,"text":51,"correct":22},"仅以原始计划速率的86%进行项目",{"key":24,"text":53,"correct":22},"正在以原始计划速率的93%进行项目",{"key":27,"text":55,"correct":22},"正在以原始计划速率的107%进行项目",{"key":30,"text":57,"correct":32},"仅以原始计划速率的80%进行项目",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},384429,"（）技术是确定为了完成项目工作所需的资源和技能水平的最佳方法。",[62,64,66,68],{"key":20,"text":63,"correct":22},"预测",{"key":24,"text":65,"correct":22},"挣值",{"key":27,"text":67,"correct":32},"专家判断",{"key":30,"text":69,"correct":22},"帕累托图",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},384430,"已知网络计划中工作M有两项紧后工作，这两项紧后工作的最早开始时间分别为第12天和第15天，工作M的最早开始时间和最迟开始时间分别为第6天和第8天，如果工作M的持续时间为4天，则工作M总时差为()天。",[74,76,77,79],{"key":20,"text":75,"correct":22},"1",{"key":24,"text":45,"correct":32},{"key":27,"text":78,"correct":22},"3",{"key":30,"text":80,"correct":22},"4",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":27,"analysis":33},384431,"进度变更的控制活动包括 （ ） 。",[85,87,89,91],{"key":20,"text":86,"correct":22},"判断项目进度的当前状态，对造成进度变更的因素施加影响，查明进度是否已经改变，在实际变更出现时对其进行调整",{"key":24,"text":88,"correct":22},"判断项目进度的当前状态，对造成成本变更的因素施加影响，查明进度是否已经改变，在实际变更出现时对其进行管理",{"key":27,"text":90,"correct":32},"判断项目进度的当前状态，对造成进度变更的因素施加影响，查明进度是否已经改变，在实际变更出现时对其进行管理",{"key":30,"text":92,"correct":22},"判断项目进度的当前状态，对造成进度变更的因素施加影响，查明进度改变的原因，在实际变更出现时对其进行调整",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},384432,"在软件开发项目实施过程中，由于进度需要，有时要采取快速跟进措施。 ()属于快速跟进范畴",[97,99,101,103],{"key":20,"text":98,"correct":22},"压缩需求分析工作周期",{"key":24,"text":100,"correct":32},"设计图纸全部完成前就开始现场施工准备工作",{"key":27,"text":102,"correct":22},"使用最好的工程师，加班加点尽快完成需求分析说明书编制工作",{"key":30,"text":104,"correct":22},"同其他项目协调好关系以减少行政管理的摩擦",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":27,"analysis":33},384433,"关于项目进度管理中的活动历时估算的叙述，()是正确的。",[109,111,113,115],{"key":20,"text":110,"correct":22},"活动历时估算应给出尽量准确的结果，不应给出变化范围，例如：2周±2天",{"key":24,"text":112,"correct":22},"多方案分析法是一种常用的活动历时估算方法",{"key":27,"text":114,"correct":32},"常用的活动历时估算方法包括类比估算、参数估算、三点估算法和后备分析法",{"key":30,"text":116,"correct":22},"类比估算法也称为自下而上估算法，常用于项目早期的活动历时估算",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},384434,"下列关于资源平衡的描述中， （ ） 是正确的。",[121,123,125,127],{"key":20,"text":122,"correct":22},"资源平衡通常用于已经利用关键链法分析过的进度模型之中",{"key":24,"text":124,"correct":22},"进行资源平衡的前提是不能改变原关键路线",{"key":27,"text":126,"correct":32},"使用按资源分配倒排进度法不一定能制定出最优项目进度表",{"key":30,"text":128,"correct":22},"资源平衡的结果通常是使项目的预计持续时间比项目初步进度表短",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":20,"analysis":33},384435,"某活动的工期采用三点估算法进行估算，其中最悲观估算是23天，最乐观估算是15天，最可能的估算是19天，则该活动的历时大致需要 （ ） 天",[133,135,137,139],{"key":20,"text":134,"correct":32},"19",{"key":24,"text":136,"correct":22},"23",{"key":27,"text":138,"correct":22},"15",{"key":30,"text":140,"correct":22},"20",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":30,"analysis":33},384436,"下列 （ ） 做法不属于进度压缩。",[145,147,149,151],{"key":20,"text":146,"correct":22},"某项目经理发现项目工期延后，于是开始让项目组成员开始加班加点，提高加班工资，以期待能在规定时间内完成项目",{"key":24,"text":148,"correct":22},"某项目经理发现项目组成员由于对技术的掌握不熟练，造成进展缓慢，延误工期，于是指派了有经验的人员帮助完成",{"key":27,"text":150,"correct":22},"为了节省时间，在需求设计还没有完成时，项目经理就通知组内编程人员开始编写代码",{"key":30,"text":152,"correct":32},"项目经理启用应急时间来增加一些项目时间",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},384437,"快速跟进是进度控制的手段之一。以下对快速跟进的理解，（）是正确的。",[157,159,161,163],{"key":20,"text":158,"correct":32},"调整部分工作的顺序关系，使用网络图和关键路径分析等进度计划工具，尽可能将一些工作并行进行",{"key":24,"text":160,"correct":22},"充分利用周六、周日或晚上等非工作时间段实施项目",{"key":27,"text":162,"correct":22},"充分发挥每一个成员的作用，用积极的绩效考核方法，提升每个成员的技能水平和绩效",{"key":30,"text":164,"correct":22},"加强项目干系人之间的交流和沟通，以加快项目的进度",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":27,"analysis":33},384438,"一家大型信息技术咨询公司的一名项目经理在某软件整合项目进度计划制订完毕后，被指定负责该项目。客户的项目管理层向项目经理提出：市场竞争压力要求项目比计划工期提前一个月完工，他们已经对项目范围进行了审核，认为无法对范围进行缩减；他们同时告诉项目经理如果每项任务的历时可以削减10%，这个提前完工的目标就可以实现。在这种情况下，项目经理能够采取的最合适的措施是（）",[169,171,173,175],{"key":20,"text":170,"correct":22},"启动变更控制程序，说明项目进度计划需要变更，并审核涉及的风险",{"key":24,"text":172,"correct":22},"与团队开会，审核每项任务如何削减10%，以便满足目标",{"key":27,"text":174,"correct":32},"并行进行更多的关键路径任务",{"key":30,"text":176,"correct":22},"与管理层一起审核最初的项目计划并讨论压缩进度可以采取的范围变更",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},384439,"软件开发项目规模度量（sizemeasurement）是估算软件项目工作量、编制成本预算、策划合理项目进度的基础。在下列方法中， （ ） 可用于软件的规模估算，帮助软件开发团队把握开发时间、费用分布等。",[181,183,185,187],{"key":20,"text":182,"correct":32},"德尔菲法",{"key":24,"text":184,"correct":22},"V模型方法",{"key":27,"text":186,"correct":22},"原型法",{"key":30,"text":188,"correct":22},"用例设计",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},384440,"下图中，如果按时完成活动1、2和3概率都是60%，活动4在第 6天开始的概率是",[193,195,197,199],{"key":20,"text":194,"correct":22},"30%",{"key":24,"text":196,"correct":22},"40%",{"key":27,"text":198,"correct":32},"22%",{"key":30,"text":200,"correct":22},"60%",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},384441,"过去几年小李完成了大量网卡驱动模块的开发，最快6天完成，最慢36天完成，平均21天完成，如果小李开发一个新网卡驱动模块，在21天到26天内完成的概率是 （ ） 。",[205,207,209,211],{"key":20,"text":206,"correct":22},"68.3%",{"key":24,"text":208,"correct":32},"34.1%",{"key":27,"text":210,"correct":22},"58.2%",{"key":30,"text":212,"correct":22},"26.1%",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":30,"analysis":33},384442,"（ ） 是定义项目批准、定义项目组织，设定项目产品质量和规格、估算和控制项目费用。",[217,219,221,223],{"key":20,"text":218,"correct":22},"WBS",{"key":24,"text":220,"correct":22},"详细范围说明书",{"key":27,"text":222,"correct":22},"WBS字典",{"key":30,"text":224,"correct":32},"工作包",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},384443,"下面的箭线图中（活动的时间单位：周），活动 G 最多可以推延 ( )周而不会影响项目的完工日期。",[229,230,231,232],{"key":20,"text":75,"correct":22},{"key":24,"text":45,"correct":22},{"key":27,"text":78,"correct":22},{"key":30,"text":80,"correct":32},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},384444,"项目经理小李对某活动工期进行估算时，发现人员的熟练程度和设备供应是否及时对工期至关重要。如果形成最有利组合时，预计17天可以完成；如果形成最不利组合时，预计33天可以完成，按照公司的正常情况，一般22天可以完成该项目的工期可以估算为（ ） 天。",[237,239,240,242],{"key":20,"text":238,"correct":22},"22",{"key":24,"text":136,"correct":32},{"key":27,"text":241,"correct":22},"24",{"key":30,"text":243,"correct":22},"25",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":20,"analysis":33},384445,"对以下箭线图，理解正确的是（）。",[248,250,252,254],{"key":20,"text":249,"correct":32},"活动A和B可以同时进行；只有活动A和B都完成后，活动C才开始",{"key":24,"text":251,"correct":22},"活动A先于活动B进行；只有活动A和B都完成后，活动C才开始",{"key":27,"text":253,"correct":22},"活动A和B可以同时进行；A完成后C即可开始",{"key":30,"text":255,"correct":22},"活动A先于活动B进行；A完成后C即可开始",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":24,"analysis":33},384446,"项目可通过分解划分为若干个活动，项目经理通过对项目的网络图进行计算分析后发现一个重要活动X的总时差为2天，自由时差为1天，下列解释最恰当的是 （ ） 。",[260,262,264,266],{"key":20,"text":261,"correct":22},"工期与活动X的总时差无关",{"key":24,"text":263,"correct":32},"工期受活动X的影响，活动X可以推迟2天都不会影响总工期",{"key":27,"text":265,"correct":22},"工期受X活动的影响，影响总工期的时间为1天",{"key":30,"text":267,"correct":22},"工期受活动X的影响，影响总工期的时间不能确定",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":27,"analysis":33},384447,"某项目中有两个活动单元：活动一和活动二，其中活动一开始后活动二才能开始。能正确表示这两个活动之间依赖关系的前导图是（）",[272,274,276,278],{"key":20,"text":273,"correct":22},"见图A",{"key":24,"text":275,"correct":22},"见图B",{"key":27,"text":277,"correct":32},"见图C",{"key":30,"text":279,"correct":22},"见图D",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":30,"analysis":33},384448,"不属于活动资源估算输出的是（）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"活动属性",{"key":24,"text":287,"correct":22},"资源分解结构",{"key":27,"text":289,"correct":22},"请求的变更",{"key":30,"text":291,"correct":32},"活动清单",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":27,"analysis":33},384449,"通过增加资源来压缩进度工期的技术称为( )",[296,298,300,302],{"key":20,"text":297,"correct":22},"快速跟进",{"key":24,"text":299,"correct":22},"持续时间缓冲",{"key":27,"text":301,"correct":32},"赶工",{"key":30,"text":303,"correct":22},"提前量管理",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},384450,"A公司的某项目即将开始，项目经理估计该项目10天即可完成，如果出现问题耽搁了也不会超过20天完成，最快6天即可完成。根据项目历时估计中的三点估算法，你认为该项目的历时为（）",[308,310,312,314],{"key":20,"text":309,"correct":22},"10天",{"key":24,"text":311,"correct":32},"11天",{"key":27,"text":313,"correct":22},"12天",{"key":30,"text":315,"correct":22},"13天",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},384451,"在项目进度控制中， 不适合用于缩短活动工期。",[320,322,324,326],{"key":20,"text":321,"correct":32},"准确确定项目进度的当前状态",{"key":24,"text":323,"correct":22},"投入更多的资源",{"key":27,"text":325,"correct":22},"改进技术",{"key":30,"text":327,"correct":22},"缩减活动范围",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":27,"analysis":33},384452,"在项目实施中间的某次周例会上，项目经理小王用下表向大家通报了目前的进度。根据这个表格，目前项目的进度 。",[332,334,336,338],{"key":20,"text":333,"correct":22},"提前于计划7%",{"key":24,"text":335,"correct":22},"落后于计划18%",{"key":27,"text":337,"correct":32},"落后于计划7%",{"key":30,"text":339,"correct":22},"落后于计划7.5%",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":24,"analysis":33},384453,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，链接顶点的边表示包含的活动，变色数字表示活动的持续时间（天）。完成该项目的最少时间为（ ）天。",[344,346,348,349],{"key":20,"text":345,"correct":22},"11",{"key":24,"text":347,"correct":32},"18",{"key":27,"text":140,"correct":22},{"key":30,"text":350,"correct":22},"21",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":27,"analysis":33},384454,"在制定进度计划时，已经完成了：①绘制进度网络图；②活动资源估算；③活动历时估算。此时，为了确定各项活动的时差可进行 （ ） 。",[355,357,359,361],{"key":20,"text":356,"correct":22},"资源平衡分析",{"key":24,"text":358,"correct":22},"进度压缩分析",{"key":27,"text":360,"correct":32},"关键路线分析",{"key":30,"text":362,"correct":22},"假设情景分析",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":30,"analysis":33},384455,"项目经理对某软件需求分析活动历时估算的结果是：该活动用时2周（假定每周工作时间是5天）。随后对其进行后备分析，确定的增加时间是2天。以下针对该项目后备分析结果的叙述中， （ ） 是不正确的。",[367,369,371,373],{"key":20,"text":368,"correct":22},"增加软件需求分析的应急时间是2天",{"key":24,"text":370,"correct":22},"增加软件需求分析的缓冲时间是该活动历时的20%",{"key":27,"text":372,"correct":22},"增加软件需求分析的时间储备是20%",{"key":30,"text":374,"correct":32},"增加软件需求分析的历时标准差是2天",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":20,"analysis":33},384456,"以下关于工作包的描述，正确的是()",[379,381,383,385],{"key":20,"text":380,"correct":32},"可以在此层面上对其成本和进度进行可靠的估算",{"key":24,"text":382,"correct":22},"工作包是项目范围管理计划关注的内容之一",{"key":27,"text":384,"correct":22},"工作包是WBS的中间层",{"key":30,"text":386,"correct":22},"不能支持未来的项目活动定义",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":30,"analysis":33},384457,"某软件项目已经到了测试阶段，但是由于用户订购的硬件设备没有到货而不能实施测试。这种测试活动与硬件之间的依赖关系属于（）",[391,393,395,397],{"key":20,"text":392,"correct":22},"强制性依赖关系",{"key":24,"text":394,"correct":22},"直接依赖关系",{"key":27,"text":396,"correct":22},"内部依赖关系",{"key":30,"text":398,"correct":32},"外部依赖关系",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":20,"analysis":33},384458,"某研发项目由于很多技术细节不是特别清晰，所以在制定研发项目的进度计划时应该采用（ ）来制定进度计划",[403,405,407,409],{"key":20,"text":404,"correct":32},"关键链法",{"key":24,"text":406,"correct":22},"关键路径法",{"key":27,"text":408,"correct":22},"资源平衡法",{"key":30,"text":410,"correct":22},"资源日历",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":27,"analysis":33},384459,"活动资源估算的输出不包括 （ ） 。",[415,416,417,419],{"key":20,"text":287,"correct":22},{"key":24,"text":289,"correct":22},{"key":27,"text":418,"correct":32},"项目进度网络图",{"key":30,"text":410,"correct":22},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":24,"analysis":33},384460,"进度控制的一个重要作用是()",[424,426,428,430],{"key":20,"text":425,"correct":22},"判断为产生项目可交付成果所需的活动时间",{"key":24,"text":427,"correct":32},"判断是否需要对发生的进度偏差采取纠正措施",{"key":27,"text":429,"correct":22},"评价范围定义是否足以支持进度计划",{"key":30,"text":431,"correct":22},"保持团队的高昂士气，使团队成员能充分发挥潜力",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},384461,"在项目经理对某软件开发流程中的“概要设计”活动进行历时估算时，参考了以往相关项目活动情况。他采用的是 （ ）方法。",[436,437,439,441],{"key":20,"text":67,"correct":22},{"key":24,"text":438,"correct":32},"类比估算",{"key":27,"text":440,"correct":22},"参数估算",{"key":30,"text":442,"correct":22},"三点估算",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},384462,"某公司接到一栋大楼的布线任务,经过分析决定将大楼的4层布线任务分别交给甲、乙、丙、丁4个项目经理，每人负责一层布线任务，每层面积为10000m2。布线任务由同一个施工队施工，该工程队有5个施工组。甲经过测算，预计每个施工组每天可以铺设完成200 m2，于是估计任务完成时间为10天，甲带领施工队最终经过14天完成任务；乙在施工前咨询了工程队中有经验的成员，经过分析之后估算时间为12天，乙带领施工队最终经过13天完成；丙参考了甲、乙施工时的情况，估算施工时间为15天，丙最终用了21天完成任务；丁将前三个施工队的工期代入三点估算公式计算得到估计值为15天，最终丁带领施工队用了15天完成任务。以下说法正确的是（）",[447,449,451,453],{"key":20,"text":448,"correct":22},"甲采用的是参数估算法，参数估计不准确导致实际工期与预期有较大偏差",{"key":24,"text":450,"correct":32},"乙采用的是专家判断法，实际工期偏差只有1天与专家的经验有很大关系",{"key":27,"text":452,"correct":22},"丙采用的是类比估算法，由于此类工程不适合采用该方法，因此偏差最大",{"key":30,"text":454,"correct":22},"丁采用的是三点估算法，工期零偏差是因为该方法是估算工期的最佳方法",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":30,"analysis":33},384463,"某工程建设项目中各工序历时如下表所示，则本项目最快完成时间为 （ ） 周。",[459,461,463,465],{"key":20,"text":460,"correct":22},"7",{"key":24,"text":462,"correct":22},"9",{"key":27,"text":464,"correct":22},"12",{"key":30,"text":466,"correct":32},"13",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":27,"analysis":33},384464,"在制定进度计划时，已经完成了：①绘制进度网络图：②活动资源估算：③活动历时估算。此时为了确定各项活动的时差可进行（）",[471,472,473,474],{"key":20,"text":356,"correct":22},{"key":24,"text":358,"correct":22},{"key":27,"text":360,"correct":32},{"key":30,"text":362,"correct":22},{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":30,"analysis":33},384465,"某项目经理正在进行活动资源估算，他可以采用的方法或技术中不包括（ ） 。",[479,481,483,485],{"key":20,"text":480,"correct":22},"己有案例的估算数据",{"key":24,"text":482,"correct":22},"项目管理软件",{"key":27,"text":484,"correct":22},"多方案分析",{"key":30,"text":486,"correct":32},"后备分析",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},384466,"对成本和进度进行权衡，确定如何尽量少增加费用的前提下最大限度地缩短项目所需要的时间，称为（）。",[491,492,494,496],{"key":20,"text":297,"correct":22},{"key":24,"text":493,"correct":32},"赶进度",{"key":27,"text":495,"correct":22},"资源平衡",{"key":30,"text":410,"correct":22},{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":27,"analysis":33},384467,"在项目实施期间的某次周例会上，项目经理向大家通报了项目目前的进度。根据以下表格特征，目前的进度 （ ） 。",[501,503,505,507],{"key":20,"text":502,"correct":22},"提前计划7%",{"key":24,"text":504,"correct":22},"落后计划15%",{"key":27,"text":506,"correct":32},"落后计划7%",{"key":30,"text":508,"correct":22},"提前计划15%",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},384468,"某系统集成企业为做好项目风险管理，给风险定义了3个参数。①风险严重性：指风险对项目造成的危害程度；②风险可能性：指风险发生的几率； ③风险系数：是风险严重性和风险可能性的乘积。 其中，对项目进度延误、工作量偏差的风险严重性等级和风险可行性等级如下表所示：假定该企业将风险系数大于等于6的情况定义为红灯状态，需要优先处理，则下列（）的情况属于红灯状态。",[513,515,517,519],{"key":20,"text":514,"correct":22},"进度延误15%，工作量偏差15%，发生几率为0.5",{"key":24,"text":516,"correct":22},"进度延误15%，工作量偏差35%，发生几率为0.2",{"key":27,"text":518,"correct":32},"进度延误25%，工作量偏差15%，发生几率为0.4",{"key":30,"text":520,"correct":22},"进度延误15%，工作量偏差25%，发生几率为0.4",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},384469,"在制订项目进度计划过程中，（）可以根据有限的资源对项目进度进行调整，是一种结合了确定性与随机性的一种方法。",[525,527,529,531],{"key":20,"text":526,"correct":32},"关键链方法",{"key":24,"text":528,"correct":22},"专家评估方法",{"key":27,"text":530,"correct":22},"假设情景方法",{"key":30,"text":532,"correct":22},"资源平衡方法",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},384470,"某软件开发项目的实际进度已经大幅滞后于计划进度， （ ） 能够较为有效地缩短活动工期。",[537,539,541,543],{"key":20,"text":538,"correct":32},"请经验丰富的老程序员进行技术指导或协助完成工作",{"key":24,"text":540,"correct":22},"要求项目组成员每天加班2～3个小时进行赶工",{"key":27,"text":542,"correct":22},"招聘一批新的程序员到项目组中",{"key":30,"text":544,"correct":22},"购买最新版本的软件开发工具",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},384471,"已知网络计划中工作Ｍ有两项紧后工作，这两项紧后工作的最早开始时间分别为第12 天和第15 天，工作Ｍ的最早开始时间和最迟开始时间分别为第6天和第8天。如果工作Ｍ的持续时间为4 天。则工作Ｍ总时差为 （ ）天。",[549,550,551,552],{"key":20,"text":75,"correct":22},{"key":24,"text":45,"correct":32},{"key":27,"text":78,"correct":22},{"key":30,"text":80,"correct":22},{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":30,"analysis":33},384472,"某信息系统集成项目经理王某收到客户的最新变更要求，他带领其团队成员经过认真分析，发现这次变更将导致项目范围增加近70%，初步估计成本将增加5倍。王某必须要在已被批准的项目计划中改变原定的开始和结束日期，那么他的第一步工作应该是()",[557,559,561,563],{"key":20,"text":558,"correct":22},"修改合同",{"key":24,"text":560,"correct":22},"增加人员和资源",{"key":27,"text":562,"correct":22},"重新制订基准计划",{"key":30,"text":564,"correct":32},"采用一个新的目标进度计划",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":30,"analysis":33},384473,"如果项目受资源限制，往往需要项目经理进行资源平衡。但当()时，不宜进行资源平衡。",[569,571,573,575],{"key":20,"text":570,"correct":22},"项目在时间上有一定的灵活性",{"key":24,"text":572,"correct":22},"项目团队成员一专多能",{"key":27,"text":574,"correct":22},"项目在成本上有一定的灵活性",{"key":30,"text":576,"correct":32},"项目团队处理应急风险",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":27,"analysis":33},384474,"在工程网络计划中，工作 M 的最早开始时间为第 16 天，其持续时间为 5 天。该工作有三项紧后工作，他们的最早开始时间分别为第 25 天、第 27 天和第 30 天，最迟开始时间分别为第 28 天、第 29 天和第 30 天。则工作 M 的总时差为()天。",[581,583,585,586],{"key":20,"text":582,"correct":22},"5",{"key":24,"text":584,"correct":22},"6",{"key":27,"text":460,"correct":32},{"key":30,"text":462,"correct":22},{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":30,"analysis":33},384475,"下列做法无助于缩短活动工期的是()",[591,593,595,597],{"key":20,"text":592,"correct":22},"投入更多的资源以加快活动进程",{"key":24,"text":594,"correct":22},"减小活动范围或降低活动要求",{"key":27,"text":596,"correct":22},"通过改进方法或者技术提高生产率",{"key":30,"text":598,"correct":32},"用甘特图法",[600,604,607,610,613,616],{"id":601,"name":602,"category":7,"favorite":603},136,"法律职业试卷二(客观题 )",2,{"id":605,"name":606,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":608,"name":609,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":611,"name":612,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":614,"name":615,"category":7,"favorite":8},28,"安全工程师",{"id":617,"name":618,"category":7,"favorite":8},112,"安全生产法律知识"]