[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-385307":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},385307,165,1,"单选题","信息系统集成项目完成验收后要进行一个综合性的项目后评估, 评估的内容一般包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","系统目标评价、系统质量评价、系统技术评价、系统可持续性评价",false,{"key":16,"text":17,"correct":14},"B","系统社会效益评价、系统过程评价、系统技术评价、系统可用性评",{"key":19,"text":20,"correct":21},"C","系统目标评价、系统过程评价、系统效益评价、系统可持续性评价",true,{"key":23,"text":24,"correct":14},"D","系统责任评价、系统环境影响评价、系统效益评价、系统可持续性 评价","",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]