[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-385161":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},385161,165,1,"单选题","Project()is an uncertain event or condition that，if it occurs，has a positiveor a negative effect on at least one project objective，such as time，cost，scope， or quality．",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","risk",true,{"key":16,"text":17,"correct":18},"B","problem",false,{"key":20,"text":21,"correct":18},"C","result",{"key":23,"text":24,"correct":18},"D","data","风险是一个不确定因素或条件，如果它一旦发生，可能对至少一个项目目标，如项目进度、项目成本、项目范围或项目质量产生负面或正面的影响。选项A 是风险，选项B 是问题，选项 C 是结果，选项 D 是数据。根据项目风险定义，风险包括两方面含义：一是未实现目标；二是不确定性。因此应选择 A",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]