[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-385138":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},385138,165,1,"单选题","The（）process analyzes the effect of risk events and assigns a numerical rating to those risks. A.Risk Identification",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","Quantitative Risk Analysis",false,{"key":16,"text":17,"correct":18},"B","Qualitative Risk Analysis",true,{"key":20,"text":21,"correct":14},"C","Risk Monitoring an",{"key":23,"text":24,"correct":14},"D","Control","定量风险分析过程分析风险事件的影响并对这些风险赋予一个数值化的评价。 A.风险识别 B.客户满意 C.定性风险分析 D.风险监控",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]