[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384956":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},384956,165,1,"单选题","The perform Integrated Change Contorl process is the uitimste responsbilityof the (请作答此空) ，Although changes my be intitated verbally,they should be recorded in writtern form and entered into the ( ) syste.",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","resource manager",false,{"key":16,"text":17,"correct":14},"B","division manager",{"key":19,"text":20,"correct":14},"C","functional manager",{"key":22,"text":23,"correct":24},"D","projeet manager",true,"翻译：执行综合变更控制过程是（请作答此空）的首要责任，尽管口头上对变更进行了说明，但它们应以书面形式记录并输入（ ）系统。A. 资源管理员B. 部门经理C. 职能经理D. 项目经理",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]