[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384920":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},384920,165,1,"单选题","（）指通过考虑风险发生的概率及风险发生后对项目目标及其他因素的影响，对已识别风险的优先级进行评估",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","风险管理",false,{"key":16,"text":17,"correct":18},"B","定性风险分析",true,{"key":20,"text":21,"correct":14},"C","风险控制",{"key":23,"text":24,"correct":14},"D","风险应对计划编制","风险管理、收尾管理、知识产权管理",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]