[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384908":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},384908,165,1,"单选题","项目发生变更在所难免，但项目经理应让项目干系人（特别是业主）认识到()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","在项目策划阶段，变更成本较高",false,{"key":16,"text":17,"correct":18},"B","在项目策划阶段，变更成本较低",true,{"key":20,"text":21,"correct":14},"C","在项目策划阶段，变更带来的附加值较低",{"key":23,"text":24,"correct":14},"D","在项目执行阶段，变更成本较低","变更代价曲线，变更代价前低后高",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]