[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384903":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},384903,165,1,"单选题","依据项目变更管理流程，项目中的正式变更手续应该由 （ ） 来进行审批。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目经理",false,{"key":16,"text":17,"correct":14},"B","公司高层领导",{"key":19,"text":20,"correct":21},"C","变更控制委员会",true,{"key":23,"text":24,"correct":14},"D","公司高层领导与客户方高层领导共同","变更控制委员会（CCB）管理的内容主要是批准是否需要变更，它是一个决策性机构。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]