[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384886":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},384886,165,1,"单选题","某项目经理在项目执行过程中得知公司新的规章将导致该项目绩效的测试发生变化，为了保证该变更纳入到项目计划之中，项目经理应当（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","要求召开变更控制委员会议",false,{"key":16,"text":17,"correct":14},"B","变更工作分解结构、进度计划，以在项目管理计划中反映新的要求",{"key":19,"text":20,"correct":21},"C","准备变更申请",true,{"key":23,"text":24,"correct":14},"D","反对公司新计划","变更首先是进行变更申请。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]