[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384875":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},384875,165,1,"单选题","对变更效果的评估是变更管理中非常重要的一环， （ ） 不属于变更效果评估的内容。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目基准是评估依据",false,{"key":16,"text":17,"correct":14},"B","是否达到了变更提出时的要求",{"key":19,"text":20,"correct":21},"C","在干系人间就变更达成共识",true,{"key":23,"text":24,"correct":14},"D","评估变更的效率和效果","排除法，既然是变更效果评估必须有理有据故答案A本身描述正确；也要考虑是否达到了变更申请提出的时间要求，故答案B本身描述正确；变更效果评估也要考虑到效率和效果，故答案D本身描述正确。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]