[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-384785":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},384785,165,1,"单选题","甲公司在进行采购时选定了乙公司的产品，但在签订采购合同时没有对采购内容的交付时间进行约定，则以下说法错误的是 （ ） 。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","可以通过协议或交易习惯确定交付时间",false,{"key":16,"text":17,"correct":18},"B","不能通过协议或交易习惯确定的，则采购合同无效",true,{"key":20,"text":21,"correct":14},"C","乙公司可以随时履行交付义务",{"key":23,"text":24,"correct":14},"D","甲公司可以随时要求乙公司履行交付义务","",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 系统集成项目管理工程师","职业资格",0]